Drawing for T-EN

USPTO serial 79299667

T-EN

Reviewed by CopyMark Law Group

Reg. 6937983Status 700Registered
Filing date
Status date
Registration date
Jan 3, 2023
Examiner
PEISECKI, MARK A
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with T-EN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey M. Becker

Jeffrey M. Becker Haynes and Boone, LLP2323 Victory Avenue, Suite 700Dallas, TX 75219UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction, namely, general construction contracting, construction of buildings, harbor construction, ocean construction and installation of offshore oil and gas facilities, offshore wind turbine support facilities, fixed and floating structures in the nature of piers, docks, jackets in the nature of supports for offshore rigs, gravity-based self-installing drilling platforms, artificial islands, foundation supports, semi-submersible drilling platforms, tension leg drilling platforms, floating storage tanks, jetty; breakwaters, carbon dioxide capture and storage facilities, pipeline construction, undersea construction of subsea pipelines, mooring installations, and subsea connectors in the nature of undersea pipeline connectors, undersea power cable connector, and undersea mooring line connectors; offshore oil and gas facility construction, construction of civil engineering structures, warehouse construction, factory construction, construction of public works and rural works, namely, pipeline construction, concrete pouring and forming for building and other commercial or public concrete structures, construction of structures for renewable energy, construction of oil, gas, petrochemical and energy refineries and energy transition plants; construction management and supervision; providing construction information; construction, maintenance and repair of industrial facilities; providing construction information featuring technical research in the fields of construction and construction project managementACTIVE—
042Architectural design and engineering of industrial facilities; commissioning industrial facilities, namely, inspecting completed industrial facilities for quality assurance purposes; industrial design of industrial equipment and systems for use in the energy, chemistry and chemical engineering sectors; architectural services; research and development of industrial equipment and systems for data processing, factory management, for use in the energy, chemistry and chemical engineering sectors, and of systems composed of such industrial machines, apparatus and instruments; technical research in the fields of mechanical, civil, electronic, computer, and environmental engineering; technical research in the fields of architectural and construction design; technical research in the field of general construction contracting; technical research in the field of IT, engineering, architectural design, project management; technical research in the fields of engineering process technologies; research and development of industrial equipment and systems for use in the energy, chemistry and chemical engineering sectors; technical research, specific to the energy, chemistry and chemical engineering sectors, in the fields of engineering, design, engineering project management and chemical process technologiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 3, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Oct 28, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 2, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 2, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 9, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 15, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 14, 2023FIMPFINAL DISPOSITION PROCESSED—
Apr 3, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 5, 2023ES7RTEAS SECTION 7 REQUEST RECEIVED—
Jan 3, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 3, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 18, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 18, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 17, 2022GPNXNOTIFICATION PROCESSED BY IB—
Sep 28, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 28, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 28, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 13, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 5, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Sep 5, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 5, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 5, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 28, 2022LIMELIMITATION FROM THE IB - REQUEST EXAM REVIEW—
May 30, 2022OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 29, 2022LIMGLIMITATION OF GOODS RECEIVED FROM IB—
May 11, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 11, 2022OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 9, 2022GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 9, 2022GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 9, 2022CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 2, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 2, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 2, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 3, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 3, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 3, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 30, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 26, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 26, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 26, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 22, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 22, 2021ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jun 22, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 22, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jan 24, 2021RFNTREFUSAL PROCESSED BY IB—
Jan 6, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 6, 2021RFRRREFUSAL PROCESSED BY MPU—
Dec 22, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 21, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 18, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 14, 2020DOCKASSIGNED TO EXAMINER—
Dec 14, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 10, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance