Drawing for SILENT BUCKET

USPTO serial 79355001

SILENT BUCKET

Reviewed by CopyMark Law Group

Reg. 7215549Status 700Registered
Filing date
Status date
Registration date
Nov 14, 2023
Examiner
MASULLO, MARCO
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SILENT BUCKET?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Ground construction machines, namely, diaphragm wall milling machines; vibrating machines for making drill holes and for compressing earth and building material, in particular depth vibrators and top vibrators for inserting sheet piles or posts; ground construction machines, namely, sheet pile presses; ground construction machines, namely, pile-driving and free-flying power hammers for hammering down sheet pile walls and posts; ground construction machines, namely, support apparatus for diaphragm wall cutters, deep-bed vibrating machines and deep-bed compressors, and carrying apparatus for vibratory compactors and hammers; ground construction machines, namely, pressing machines and deep-drawing machine tools, presses and pumps, in particular being pneumatically and hydraulically operated; ground construction machines, namely, mixing installations for suspensions, injection and sealing compositions; drilling equipment, power-operated drill pipe installations, drill tubing, drill pipe, pipe and rod couplings machine, drilling tools; displacement drills pump; top drilling equipment; ground construction machines, namely, disposal well equipment; drilling equipment for geothermal power plants and deep drilling equipment; parts for the aforesaid machines, apparatus and installations, included in this classACTIVE
037Civil engineering, in particular special-purpose civil engineering, building construction supervision; drilling of geothermal wells and deep oil or gas wells, and mining; mining extraction services, oil drilling services and water drilling services, in relation to the following fields, water harvesting, exploration and extraction of raw materials and natural resources; erecting, maintenance, of biological and plant sewage treatment worksACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 11, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 20, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 20, 2024FIMPFINAL DISPOSITION PROCESSED
Feb 14, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Nov 14, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Nov 14, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 29, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 29, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 28, 2023GPNXNOTIFICATION PROCESSED BY IB
Aug 9, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Aug 9, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Aug 9, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 22, 2023RFNTREFUSAL PROCESSED BY IB
Jul 21, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 6, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 6, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 6, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 26, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 26, 2023RFRRREFUSAL PROCESSED BY MPU
May 17, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
May 16, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 2, 2023DOCKASSIGNED TO EXAMINER
Nov 18, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Nov 14, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 10, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance