Drawing for E-SIAM ENI STRUCTURAL INTEGRITY ACOUSTIC MONITORING

USPTO serial 79360020

E-SIAM ENI STRUCTURAL INTEGRITY ACOUSTIC MONITORING

Reviewed by CopyMark Law Group

Reg. 7349568Status 700Registered
Filing date
Status date
Registration date
Apr 9, 2024
Examiner
HERR, JENNA FRANCES
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with E-SIAM ENI STRUCTURAL INTEGRITY ACOUSTIC MONITORING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Remote monitoring equipment for the integrity of structures and plants in the oil, energy and environmental sectors, namely, electronic controllers, electric sensors, cameras and video monitors, all with wireless communication capability; downloadable software for remote monitoring and downloadable software for plant analysis; electric sensors, acoustic and vibration detectors, echo sounders, side scan sonar equipment, accelerometers, inclinometers, and monitoring instruments in the nature of flow meters, pressure sensors, temperature sensors, electric level sensors, differential pressure sensors, position sensors, acoustic sensors in the nature of acoustic meters, gas detectors for detecting presence of gas, smoke and fire detectors, oxygen sensors for environmental use, electronic plant moisture sensors, electric H2S sensors, intruder alarms, frequency sensors in the nature of frequency meters; scientific research and laboratory apparatus for measuring vibrations and acoustic emissions, educational apparatus in the nature of doppler vibration meters, oscilloscopes, accelerometer, voltmeters, personal computers and vibration and acoustic emission simulator metersACTIVE
042Environmental testing of vibration; inspection of plant and machinery for quality control purposes; quality control of goods relating to computer software; writing of control programs, namely, writing of data processing programs; scientific and technological services, namely, research and design and industrial analysis in the field of energy, oil, and environment; industrial research in the field of energy, oil and environment; design and development of computer software in the energy, oil and environmental fields; monitoring of computer systems by remote access and to detect plant failures in the oil, energy and environmental sectors; electronic monitoring of machine condition, namely, Non-Destructive Testing and structural integrity monitoring using computers and sensors; scientific and technological services, namely, scientific testing services in the field of asset integrity management; quality control of goods and services; quality control of services, namely, services for monitoring industrial processes for quality control purposesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 17, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Dec 31, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
Dec 31, 2024FIMPFINAL DISPOSITION PROCESSED
Oct 19, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Apr 9, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 9, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jan 23, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 23, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 22, 2024GPNXNOTIFICATION PROCESSED BY IB
Jan 3, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jan 3, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jan 3, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 19, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 12, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 12, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 12, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Oct 11, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Oct 11, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 11, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 11, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 11, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 11, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 31, 2023RFNTREFUSAL PROCESSED BY IB
May 10, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 10, 2023RFRRREFUSAL PROCESSED BY MPU
Mar 21, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 20, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 2, 2023DOCKASSIGNED TO EXAMINER
Feb 6, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Feb 6, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Feb 6, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
Feb 6, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 6, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Feb 6, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Jan 17, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Jan 13, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 12, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance