USPTO serial 79360020
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Remote monitoring equipment for the integrity of structures and plants in the oil, energy and environmental sectors, namely, electronic controllers, electric sensors, cameras and video monitors, all with wireless communication capability; downloadable software for remote monitoring and downloadable software for plant analysis; electric sensors, acoustic and vibration detectors, echo sounders, side scan sonar equipment, accelerometers, inclinometers, and monitoring instruments in the nature of flow meters, pressure sensors, temperature sensors, electric level sensors, differential pressure sensors, position sensors, acoustic sensors in the nature of acoustic meters, gas detectors for detecting presence of gas, smoke and fire detectors, oxygen sensors for environmental use, electronic plant moisture sensors, electric H2S sensors, intruder alarms, frequency sensors in the nature of frequency meters; scientific research and laboratory apparatus for measuring vibrations and acoustic emissions, educational apparatus in the nature of doppler vibration meters, oscilloscopes, accelerometer, voltmeters, personal computers and vibration and acoustic emission simulator meters | ACTIVE | — |
| 042 | Environmental testing of vibration; inspection of plant and machinery for quality control purposes; quality control of goods relating to computer software; writing of control programs, namely, writing of data processing programs; scientific and technological services, namely, research and design and industrial analysis in the field of energy, oil, and environment; industrial research in the field of energy, oil and environment; design and development of computer software in the energy, oil and environmental fields; monitoring of computer systems by remote access and to detect plant failures in the oil, energy and environmental sectors; electronic monitoring of machine condition, namely, Non-Destructive Testing and structural integrity monitoring using computers and sensors; scientific and technological services, namely, scientific testing services in the field of asset integrity management; quality control of goods and services; quality control of services, namely, services for monitoring industrial processes for quality control purposes | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 17, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 31, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 31, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 19, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 9, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 9, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 23, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 23, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 22, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 3, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 3, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 3, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 19, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 12, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 12, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 12, 2023 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 11, 2023 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 11, 2023 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 11, 2023 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 11, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 11, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 11, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 31, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 10, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 10, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 21, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 20, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 2, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 6, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 6, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 6, 2023 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Feb 6, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 6, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 6, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jan 17, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 13, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 12, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |