USPTO serial 86298789
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Advanced Energy Industries, Inc.
Denver, CO
Advanced Energy Industries, Inc.
Denver, CO
Advanced Energy Industries, Inc.
Fort Collins, CO
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ronald H. Spuhler
Ronald H. Spuhler McAndrews, Held & Malloy, Ltd.500 W Madison Street, 34th FloorChicago, IL 60661United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Power source control units for application in manufacturing and controlling processes as applied to the thin film and semiconductor industries; power controllers, power supplies, electronic power conversion and production products, namely, programmable, lightweight, low-profile, standard-size, general purpose, proportional, regulated, compact, pcb or chassis-mountable high voltage DC-to-DC converters for biasing applications; capacitor charging devices; electrostatic detectors; mass spectrometers; photomultipler tubes; high-energy pulsers, amplifiers; pulse generators for application with manufacturing and controlling processes as applied to the thin film and semiconductor manufacturing industries; control and test units, namely, direct current, low- mid-, high-, and radio frequency power conversion and control systems, and match networks for application in manufacturing and controlling processes as applied to the thin film and semiconductor manufacturing industries; remote plasma and ion beam sources; thermal equipment and sensing systems, namely, optical thermometers, emissometers, pyrometers, thermal sensors, and thermal controllers; computer hardware; downloadable computer software for operating and maintaining power source control units, power controllers, and power supplies; and power measurement devices for measuring voltage for application in manufacturing and controlling processes as applied to the thin film and semiconductor industries | ACTIVE | Sep 30, 2022 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 16, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 16, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 16, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 16, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 16, 2024 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 14, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 14, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 10, 2023 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Feb 9, 2023 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Feb 9, 2023 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jan 30, 2023 | IUAF | USE AMENDMENT FILED | — |
| Jan 30, 2023 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Aug 9, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 8, 2022 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Aug 6, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 26, 2022 | EXT5 | SOU EXTENSION 5 FILED | — |
| Jul 26, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 12, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 10, 2022 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jan 10, 2022 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jan 10, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 29, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 27, 2021 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jul 27, 2021 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jul 27, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 12, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 10, 2020 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Dec 10, 2020 | EXT2 | SOU EXTENSION 2 FILED | — |
| Dec 10, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 25, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 23, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jul 23, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jul 23, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 28, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 3, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 3, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 13, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 30, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 30, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 30, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 30, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 30, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 26, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 25, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 25, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 8, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 8, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 8, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2019 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Oct 11, 2018 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Apr 10, 2018 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Oct 10, 2017 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Apr 6, 2017 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Apr 6, 2017 | ALIE | ASSIGNED TO LIE | — |
| Oct 6, 2016 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Apr 6, 2016 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Oct 6, 2015 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Apr 6, 2015 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Apr 6, 2015 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Apr 6, 2015 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Apr 3, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 3, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 1, 2015 | ALIE | ASSIGNED TO LIE | — |
| Mar 25, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 25, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 25, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 25, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 15, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 17, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 6, 2014 | NWAP | NEW APPLICATION ENTERED | — |