USPTO serial 88327627
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Brownsville, WI, US
Brownsville, WI, US
Brownsville, WI, US
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Pipeline construction, repair, and rehabilitation; Pipeline repair featuring cured in place pipe; Construction, repair and maintenance of pipeline compressor stations, pumping stations, meter stations, and regulator stations; Construction, repair and maintenance of pipeline storage facilities; Construction, repair and maintenance of pipeline gathering systems; Sewer Construction, repair and maintenance; Water and gas main construction, repair and maintenance; Tunnel construction and repair; Construction, repair and maintenance of natural gas distribution systems; Underground and above ground installation and repair of natural gas pipelines and mains; Drilling for the placement of pipes, lines, conduits, and cables; Horizontal directional drilling for the placement of pipes, lines, conduits, and cables; Construction, repair and maintenance of electric and power utility systems, transmission lines, distribution systems, and substations; Underground utility systems construction; Underground and above ground installation and repair of electric and power utility system conduits, cables, lines, pipelines, poles and associated foundations; Construction of wind turbines and wind energy systems; Construction of earth retention structures; Construction of foundation systems and sheet pilings; Construction of telecommunication systems; Underground and above ground installation, repair and maintenance of telecommunication system conduits, cables and pipelines; Road construction, repair and maintenance; Airport construction, repair and maintenance; Bridge construction, repair and maintenance; Construction grading services; Paving contractor services; Construction of earth retention systems; installation and construction of dewatering equipment; Construction dewatering, namely, removal of surface and ground water to facilitate construction of structures and pipelines; Construction of foundations for civil construction projects; Quarry services and mining extraction | ACTIVE | Jun 8, 2021 |
| 040 | Custom fabrication of pipelines; Custom fabrication of building stone; production and crushing of construction aggregate materials for others | ACTIVE | Jun 8, 2021 |
| 042 | Engineering services; development and design or earth retention systems; industrial design services, namely, design of dewatering equipment; design of foundations for civil construction projects | ACTIVE | Jun 8, 2021 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 31, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 31, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 31, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 31, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 29, 2021 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jul 28, 2021 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jul 15, 2021 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jul 15, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 6, 2021 | IUAF | USE AMENDMENT FILED | — |
| Jul 6, 2021 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| May 19, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 17, 2021 | EX2G | SOU EXTENSION 2 GRANTED | — |
| May 17, 2021 | EXT2 | SOU EXTENSION 2 FILED | — |
| May 17, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 20, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 18, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Nov 18, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Nov 18, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 26, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 31, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 31, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 11, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 25, 2020 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 21, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 20, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 20, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 20, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 20, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 13, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 12, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 12, 2020 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 30, 2019 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 30, 2019 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 30, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 15, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 15, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 12, 2019 | ALIE | ASSIGNED TO LIE | — |
| Nov 5, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 16, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 16, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 16, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 15, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 24, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 9, 2019 | NWAP | NEW APPLICATION ENTERED | — |