Drawing for AGGREKO

USPTO serial 85778735

AGGREKO

Reviewed by CopyMark Law Group

Reg. 4570669Status 800Registered
Filing date
Status date
Registration date
Jul 22, 2014
Examiner
JOHNSON, AISHA CLARKE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with AGGREKO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Frank S. Benjamin

Frank S. Benjamin DENTONS US LLPP.O. Box 1302Chicago, IL 60604United States

Goods and services

ClassDescriptionStatusFirst use
007Electrical generators; oil-free air compressorsACTIVEMay 24, 2007
009Apparatus and instruments for distributing electric current; load banks which develop an electrical load, applies the load to an electrical power source and converts or dissipates the resultant power output of the source; electric voltage transformersACTIVEMay 24, 2007
011Air and water cooled chillers for chilling liquids and gases; evaporative and closed loop cooling towers; air conditioners; spot coolers, namely, spot coolers for cooling air; air handlers; electric heaters for radiative, conductive, and convective heating; heat exchangers; air dryers, namely, refrigerative dehumidifiers, desiccant dehumidifiers, desiccant-based air dryers, refrigerated air dryers; pumps, namely, electrical pumps and compressed air pumps for pumping liquids and gasses and parts and fittings thereforACTIVEMay 24, 2007
035Turnkey project packages, namely, coordination and assumption of responsibility for all aspects of the design and installation of temporary electricity generation apparatusACTIVEMay 24, 2007
037Repair and maintenance of generators, loadbanks, transformers, fuel tanks, cables, distribution equipment, chillers, cooling towers, air conditioners, coolers, air handlers, heaters, heat exchangers, dehumidifiers, piping, ducts and valves; and providing advice, information and consultation in the field of repair and maintenance of the foregoingACTIVEMay 24, 2007
040Rental and installation of electrical generators, resistive and reactive loadbanks, electric voltage transformers, fuel tanks, cables, distribution equipment, namely, circuit breakers, synchronization equipment, switchgear, load panels, panel boards and transformer distribution centres, namely, single enclosed units containing electric voltage transformers, circuit breakers, load panels, cables, and connections therefor, air-cooled chillers, and water-cooled chillers, for use in the residential, commercial, and industrial chilling of liquids and gases, evaporative and closed loop cooling towers, air conditioners, spot coolers, namely, spot coolers for cooling air, air handlers, electric heaters for radiative, conductive, and convective heating, heat exchangers, refrigerative dehumidifiers, desiccant dehumidifiers, pumps, piping, ducts and valves therefor, oil-free air compressors, desiccant-based air dryers, refrigerated air dryers, air-cooled aftercoolers, watercooled aftercoolers and hoses, fittings, manifolds, boosters, pressure regulators and air receivers therefor; advisory, information and consultancy services in the field of rental and installation of the aforementioned equipmentACTIVEMay 24, 2007

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 9, 2024NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Dec 9, 2024RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Dec 9, 202489AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Sep 5, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 24, 2024E89RTEAS SECTION 8 & 9 RECEIVED—
Feb 28, 2024EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Feb 28, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 28, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 28, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 28, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 28, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 22, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Nov 24, 2021ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Sep 9, 2020NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 9, 2020C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 8, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 19, 2020E815TEAS SECTION 8 & 15 RECEIVED—
Jun 17, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 17, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 17, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 17, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 17, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 22, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 22, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 6, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 6, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 16, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 31, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 31, 2014ALIEASSIGNED TO LIE—
Mar 13, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 28, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 28, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 28, 2014ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 24, 2014ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 24, 2014REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 24, 2013GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 24, 2013GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 24, 2013CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 12, 2013TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 11, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 9, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 9, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 9, 2013TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 13, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 11, 2013DOCKASSIGNED TO EXAMINER—
Nov 20, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 17, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance