Drawing for AE ANDY J EGAN

USPTO serial 50006493

AE ANDY J EGAN

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
THINGVOLD, CALDER J
Law office
TMO LAW OFFICE 135

What this means

Status 680 means the examining attorney approved your mark for publication in the USPTO Official Gazette. Publication for opposition usually follows within weeks, opening a 30-day window for third parties to oppose. Watch for publication (status 686) and monitor the 30-day opposition window.

Status 680: Status 680 means the examining attorney approved your mark for publication in the USPTO Official Gazette. Publication for opposition usually follows within weeks, opening a 30-day window for third parties to oppose.

Need help with AE ANDY J EGAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Megan Mischler

Megan Mischler Baker & Hostetler LLP1050 Connecticut Ave, N.W., Suite 1100Washington SquareWashington, DC 20036

Goods and services

ClassDescriptionStatusFirst use
035business operations consulting services in the field of monitoring costs related to energy use and consumption, thereby increasing efficiency; Monitoring expenditures on energy systems for others for business purposesACTIVE—
037Mechanical contractor services; installation, maintenance, repair, and servicing of HVAC systems, heating and cooling systems, plumbing systems, piping systems, and mechanical building systems for commercial, industrial, and institutional facilities; construction and installation of process piping systems; building maintenance and mechanical equipment maintenance services; building construction services; Plumbing maintenance advisory services; Pipeline construction and maintenance; Boiler and chiller installation, maintenance, cleaning and repair; Repair or maintenance of industrial furnaces; Repair or maintenance of air conditioning apparatus; construction project management services in the nature of construction supervision; construction of steel structures; installation and maintenance of energy monitoring devices to track a buildings energy use; installation, maintenance, and repair of building automation systems, HVAC control systems, energy monitoring equipment, and temperature control systems; Technical support services, namely, technical advice and consulting related to the installation of electrical and mechanical systems, HVAC equipment, HVAC units, HVAC systems, and plumbing installations; Technical support services, namely, technical advice and consulting related to the repair of electrical and mechanical systems, HVAC equipment, HVAC units, HVAC systems, and plumbing installations; Facilities management services in the nature of maintenance and renovation of office buildings; commercial refrigeration repair services; Managing, contracting, providing mechanical and electrical and construction services; and maintenance services to public, private, institutional and commercial buildings; electrical contractor servicesACTIVE—
040Custom fabrication of plumbing and mechanical system components to the order and specification of others; Custom fabrication of pipes; Metal fabrication and finishing services for others; industrial pipe fabrication services for othersACTIVE—
042Engineering services in the field of mechanical, plumbing, HVAC, and process piping systems; engineering design services; Industrial pipe design services; engineering services featuring building information modeling (BIM); Engineering design services featuring building information modeling (BIM) services, namely, creating and maintaining digital representations of physical and functional characteristics of buildings and infrastructure projects; computer-aided engineering design services utilizing building information modeling (BIM); Engineering services featuring laser scanning for the measurement of buildings for engineering and architectural purposes; Engineering design services featuring building information modeling (BIM) services, namely, creating digital models of buildings using laser scanned data; Engineering design services featuring laser-scanning services for the measurement and mapping of construction projects; Engineering design services featuring three-dimensional (3D) laser scanning services for creating digital models of buildings and infrastructure; Building design services featuring design and development of building automation and building control systems; monitoring of building control systems for others to ensure proper functioning; engineering services in the field of building controls and energy management systems; Engineering design services for others, namely, design of commercial, residential and industrial facilities and infrastructure; Engineering design services for others of mechanical systems; Engineering design services for others of heating, ventilation, and air conditioning systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 4, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 3, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 3, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 3, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 22, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 20, 2026DOCKASSIGNED TO EXAMINER—
Jul 25, 2026MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 23, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 22, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 22, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance