What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with CONNECTIONS WITH PURPOSE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Marie Anne Mastrovito

Marie Anne Mastrovito Womble Bond Dickinson (US) LLP888 Seventh Avenue, 38th FloorNew York, NY 10106United States

Goods and services

ClassDescriptionStatusFirst use
009Electrical power distribution units; electric power distribution apparatus; electrical power distribution blocks; electric switchgear; low-voltage electric switchgear; medium-voltage electric switchgear; airinsulated electric switchgear; gas-insulated electric switchgear; pad-mounted electric distribution switchgear; underground electric distribution switchgear; electrical switchboards; electrical distribution boards; electrical panelboards; electrical distribution panels; electric circuit breakers; molded case circuit breakers; miniature circuit breakers; air circuit breakers; vacuum circuit breakers; generator circuit breakers; electric circuit openers; electric circuit closers; electric switches; fusible electric switches; electrical fuses; electric fuse systems; electric relays; electric protective relays; electric protection relays for power distribution systems; electric control panels; electricity distribution consoles; electrical control panels for power distribution systems; busbars for electrical power distribution; electrical bus ducts; electrical busways; bus plugs for electrical power distribution; electrical transformers; electric transformers; electrical current transformers; electrical voltage transformers; potential transformers for power distribution systems; electricity meters; electrical power meters; electrical metering devices; branch circuit meters; electrical energy meters; voltage surge protectors; surge protective devices for electrical power systems; lightning arresters; arc fault detection devices; residual current protective devices; ground fault protection devices for electrical power distribution systems; electrical motor control centers; electrical motor control panels; motor control centers for power distribution systems; Downloadable software for monitoring electrical power distribution systems Downloadable software for electrical system design, configuration, sizing, and analysis Downloadable software for monitoring energy consumption and power quality; Downloadable engineering software for digital twin modeling of electrical infrastructure design; Charging stations, charging apparatus and charging infrastructure hardware for electric vehicles; Downloadable software for building automationACTIVE—
037Installation of electrical power distribution equipment Maintenance and repair of electrical distribution systems Field services for switchgear, switchboards, panelboards, and electrical controls; Installation, maintenance and repair of EV charging stationsACTIVE—
041Educational services, namely conducting training programs in the field of electrical power distribution Providing online training materials relating to electrical infrastructureACTIVE—
042Software as a service (SaaS) featuring software for electrical system analytics and training; Software as a service (SaaS) featuring software for monitoring electrical power distribution systems; Software as a service (SaaS) featuring software for electrical system design, configuration, sizing, and analysis Software as a service (SaaS) featuring software for monitoring energy consumption and power quality; Software as a service (SaaS) featuring engineering software for digital twin modeling of electrical infrastructure design; Software as a service (SaaS) featuring building automationACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (GNRN): A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

DateCodeEventWhat it means
Oct 22, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2026DOCKASSIGNED TO EXAMINER—
Jul 23, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 23, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 23, 2026NWAPNEW APPLICATION ENTERED—