Drawing for GRIDFORGE

USPTO serial 50177874

GRIDFORGE

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
—
Law office
—

What this means

Status 630 means your trademark application is in the USPTO queue and has not yet been assigned to an examining attorney. This is normal shortly after filing. Examination typically begins within three to four months, though timing varies. Wait for assignment and the first examiner action. Monitor TSDR monthly for status changes to 638 (assigned) or an office action.

Status 630: Status 630 means your trademark application is in the USPTO queue and has not yet been assigned to an examining attorney. This is normal shortly after filing. Examination typically begins within three to four months, though timing varies.

Need help with GRIDFORGE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Susan E. Clady

Susan E. Clady Benesch, Friedlander, Coplan & Aronoff LLP127 Public Square, Suite 4900Cleveland, OH 44114United States

Goods and services

ClassDescriptionStatusFirst use
041Providing educational and training programs in the fields of performance, reliability, and security of electrical power systemsACTIVEDec 12, 2025
042Data monitoring, namely, collecting electronic data for the purposes of improving power system performance; Automated process system monitoring, namely, remote monitoring of power generation, transmission, and distribution systems; Network infrastructure sensing, namely, sensing changes in voltage and /or current in an electrical power distribution network; System component sensing, namely, sensing the operation of conductors, switches, fuses, load balancers, and relays in an electrical power distribution network; System component monitoring, namely, monitoring the operation of conductors, switches, fuses, load balancers, and relays in an electrical power distribution network; System component analysis, namely, the analysis of the operational state of power transmission systems; Monitoring automated system components, namely, power grid components; Event monitoring services, namely, monitoring changes in state of electrical system distribution components; Consulting in the field of electrical distribution system monitoring; Consulting services in the fields of performance, reliability, and security of electrical power systems; Providing information in the field of sensing and monitoring of electrical utility and industrial power equipment for the purpose of disturbance monitoring and recording, and improving power system performance and reliability; Diagnostic services in the field of operation failure detection of electricity generation, transmission and distribution systems, namely, real-time fault detection and isolationACTIVEDec 12, 2025

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 23, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 23, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance