Drawing for CSG

USPTO serial 50221264

CSG

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
—
Law office
—

What this means

Status 630 means your trademark application is in the USPTO queue and has not yet been assigned to an examining attorney. This is normal shortly after filing. Examination typically begins within three to four months, though timing varies. Wait for assignment and the first examiner action. Monitor TSDR monthly for status changes to 638 (assigned) or an office action.

Status 630: Status 630 means your trademark application is in the USPTO queue and has not yet been assigned to an examining attorney. This is normal shortly after filing. Examination typically begins within three to four months, though timing varies.

Need help with CSG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Shuyi Yao

12295 138th Place NE #106Redmond, WA 98052United States

Goods and services

ClassDescriptionStatusFirst use
009Electric transformers; Distribution transformers; Electrical distribution boxes; Circuit breakers; Switchboards; Circuit breaker panel boards; Electrical distribution systems, namely, power distribution panels; Power transformers; Substation transformers; Solid-state transformers; Electrical switchgear, namely, devices for switching, controlling, isolating and protecting electrical equipment; Ring main units being electrical switchgear for medium-voltage power distribution; Battery energy storage systems comprised of electrical storage batteries, battery cabinets, power converters, power inverters, electronic controllers and recorded and downloadable software for battery management and energy management, all sold as a unit; Active harmonic filters for filtering harmonic currents in electrical power systems; Static VAR generators for reactive power compensation; Hybrid power factor correction equipment comprised primarily of static VAR generators, capacitors and electronic controllers for reactive power compensation; Intelligent power capacitors, namely, capacitors incorporating electronic controllers for power factor correction; Power factor correction capacitors; Static synchronous compensators (STATCOM) for regulating voltage and reactive power in electrical power systems; Packaged and prefabricated electrical substations comprised of transformers, electrical switchgear, circuit breakers, power distribution panels, capacitors, electric power converters and electrical control equipment; Power skids comprised of transformers, electrical switchgear, circuit breakers, power distribution panels, electric power converters and electrical control equipment, all mounted on a common skid; E-Houses comprised of prefabricated enclosures containing transformers, electrical switchgear, circuit breakers, power distribution panels, electric power converters and electrical control equipment.ACTIVE—
037Repair or maintenance of power distribution or control machines and apparatus; Installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricityACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 16, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 16, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance