USPTO serial 73499866
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
H. MICHAEL BRUCKER
H MICHAEL BRUCKER166 SANTA CLARA AVESTE 200OAKLAND, CA 94610| Class | Description | Status | First use |
|---|---|---|---|
| 035 | PLANT MANAGEMENT OPERATIONS SERVICES FOR LARGE ENGINEERING AND CONSTRUCTION PROJECTS; OPERATION SERVICES FOR NUCLEAR POWER PLANTS; ECONOMIC AND RISK ANALYSIS, MINE MARKET ANALYSIS, AND PROCUREMENT AND CONTRACT SUPPORT SERVICES FOR THE COAL INDUSTRY; OPERATING SERVICES FOR CHEMICAL, GAS AND PETROLEUM FACILITIES; OPERATION SERVICES FOR ALTERNATIVE FUELS AND ADVANCED ENERGY SYSTEMS, NAMELY, COGENERATION SYSTEMS, BIOMASS, AND ALCOHOL FUEL SYSTEMS, WIND ENERGY SYSTEMS, GEOTHERMAL ENERGY SYSTEMS, SOLAR ENERGY SYSTEMS, HEAVY OIL RECOVERY TECHNOLOGY SYSTEMS, OIL SHALE AND TAR SANDS DEVELOPMENT, AND OTHER SYNTHETIC FUEL SYSTEMS AND DEVELOPMENTS | ABANDONED | Aug 23, 1974 |
| 037 | CONSTRUCTION SERVICES FOR ALTERNATIVE FUELS AND ADVANCED ENERGY SYSTEMS NAMELY COGENERATION SYSTEMS, BIOMASS AND ALCOHOL FUEL SYSTEMS, WIND ENERGY SYSTEMS, GEOTHERMAL ENERGY SYSTEMS, SOLAR ENERGY SYSTEMS, HEAVY OIL RECOVERY TECHNOLOGY SYSTEMS, OIL SHALE AND TAR SANDS DEVELOPMENT, AND OTHER SYNTHETIC FUEL SYSTEMS AND DEVELOPMENT; CONSTRUCTION SERVICES FOR NUCLEAR POWER PLANTS; CONSTRUCTION SERVICES FOR CHEMICAL, GAS AND PETROLEUM FACILITIES; PROJECT ENGINEERING AND CONSTRUCTION CONTROL SERVICES FOR LARGE ENGINEERING AND CONSTRUCTION PROJECT | ABANDONED | Aug 23, 1974 |
| 039 | COAL RESOURCE TRANSPORTATION SYSTEM AND RATE STUDIES SERVICES FOR COAL INDUSTRY; ENGINEERING, PLANNING, SYSTEMS ANALYSIS, INFORMATION AND RECORDS MANAGEMENT, COMPUTER SYSTEMS DESIGN, ENERGY MANAGEMENT AND PLANNING, FUEL TRANSPORT PLANNING, ROUTE AND LOAD OPTIMIZATION, OPERATIONS RESEARCH, ASSESSMENT OF ALTERNATIVE TRANSPORTATION METHODS, MANAGEMENT OF PICKUP AND DELIVERY, AND REPRESENTATION IN REGULATORY PROCEEDINGS REGARDING TARIFFS, SERVICES FOR THE TRANSPORTATION INDUSTRY | ABANDONED | Mar 5, 1975 |
| 042 | SITE SELECTION, ENVIRONMENTAL ENGINEERING, LICENSING, FACILITY SITING, PIPELINE AND TRANSMISSION LINE ROUTING, PREPARATION OF ENVIRONMENTAL ASSESSMENTS AND REPORTS, ENVIRONMENTAL MONITORING, ECOLOGICAL MODELING, WASTE DISPOSAL PLANNING AND PREPARATION OF DESIGN CRITERIA AND SPECIFICATION SERVICES FOR INDUSTRIAL AND COMMERCIAL FACILITIES; HIGH TECHNOLOGY SEISMOLOGY AND GEOPHYSICS INVESTIGATIONS, FIELD GEOPHYSICS, EXPLORATORY DRILLING AND TRENCHING, ESTIMATES OF MAXIMUM CREDIBLE EARTHQUAKES AND GROUND MOTION, DESIGN AND IMPLEMENTATION OF ADVANCED MONITORING SYSTEMS, FAULT CAPABILITY ASSESSMENT, SURFACE AND SUB-SURFACE SOIL SURVEYS, BEDROCK MAPPING, GROUND MOTION PREDICTIONS, EARTHQUAKE SOURCE MODELING, MICROSEISMIC ARRAY DESIGN AND IMPLEMENTATION, GEOLOGICAL EXPLORATION, SEISMIC REFRACTION STUDIES, AND SEISMIC HAZARD ASSESSMENTS SERVICES FOR THE DESIGN OF CRITICAL FACILITIES, ETC. | ABANDONED | Aug 23, 1974 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 27, 1985 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Aug 27, 1985 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 15, 1985 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 24, 1984 | DOCK | ASSIGNED TO EXAMINER | — |