Drawing for MCNALLY WELLMAN

USPTO serial 74103184

MCNALLY WELLMAN

Reviewed by CopyMark Law Group

Reg. 1810456Status 710
Filing date
Status date
Registration date
Dec 14, 1993
Examiner
RICARDO, RANDY
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with MCNALLY WELLMAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JO M. FAIRBAIRN

JO M FAIRBAIRN KINNEY & LANGE, PATHE KINNEY & LANGE BLDG312 S THIRD STMINNEAPOLIS, MN 55415-1002

Goods and services

ClassDescriptionStatusFirst use
007materials handling equipment; namely, car dumpers, train positioners, stackers, reclaimers, clamshell bucket unloaders, whirler cranes, portal cranes, bridge cranes, ship loaders, barge loaders, continuous barge unloaders, bulk handlers and accessories therefor; namely, bucket wheel stacker/reclaimers, conveyors, belt feeders, pneumatic handlers and accessories therefor; namely, bin dischargers and gates, winches, vertical screw unloaders, log grapple cranes, log lifters, rotary coal breakers, conveyor belt plows, slider beds, mechanical water control gates and mechanical valves for dams and hydroelectric generating facilities, and hoists and accessories therefor; namely, operators for spillway crest gates, vertical liftgates, hoists, hoisting equipment; namely, heavy lifting hoists and hydraulic tainter gates, hoist trash racks and rakes, lock equipment-miter gates and operators, culvert valves and operators; specialized equipment; namely, hydraulic presses, leveling jacks, movable stands, barge hauls, hoist and gear reduction units, hydraulic units, ash handling systems; namely, mixer conditioner unloaders, dustless unloaders, chain conveyors, belt conveyors, iron ore pelletizing and sintering equipment; namely, traveling grate machines, pelletizing discs, screens, feeders, and sinter breakers, conveyor belt accessories, master distributors for conveyor belts, belt cleaning machines, belt skirtboardsSECTION 8 - CANCELLEDJan 2, 1990
011coke ovens; coal preparation equipment; namely, coal dryersSECTION 8 - CANCELLEDJan 2, 1990
040custom manufacture of bulk materials handling equipment; namely, materials handling equipment; namely, car dumpers, train positioners, stackers, reclaimers, clamshell bucket unloaders, whirler cranes, portal cranes, bridge cranes, ship loaders, barge loaders, continuous barge unloaders, bulk handlers and accessories therefor; namely, bucket wheel stacker/reclaimers, conveyors, belt feeders, pneumatic handlers and accessories therefor; namely, bin dischargers and gates, winches, vertical screw unloaders, log grapple cranes, log lifters, coal preparation equipment; namely, coal dryers, rotary coal breakers, conveyor belt plows, slider beds, water control gates and valves for dams and hydroelectric generating facilities, and hoists and accessories therefor; namely, operators for spillway crest gates, vertical liftgates, hoists, hoisting equipment-wire rope and hydraulic tainter gates, hoist trash racks and rakes, lock equipment-miter gates and operators, culvert valves and operators; specialized equipment; namely, hydraulic presses, leveling jacks, movable stands, barge hauls, hoist and gear reduction units, hydraulic units, coke ovens, ash handling systems; namely, mixer conditioner unloaders, dustless unloaders, chain conveyor systems, belt conveyor systems to the order and/or specifications of others; installation, maintenance and repair of materials handling equipment; namely, car dumpers, train positioners, stackers, reclaimers, clamshell bucket unloaders, whirler cranes, portal cranes, bridge cranes, ship loaders, barge loaders, continuous barge unloaders, bulk handlers and accessories therefor; namely, bucket wheel stacker/reclaimers, conveyors, belt feeders, pneumatic handlers and accessories therefor; namely, bin dischargers and gates, winches, vertical screw unloaders, log grapple cranes, log lifters, coal preparation equipment; namely, coal dryers, rotary coal breakers, conveyor belt plows, slider beds, water control gates and valves for dams and hydroelectric generating facilities, and hoists and accessories therefor; namely, operators for spillway crest gates, vertical liftgates, hoists, hoisting equipment-wire rope and hydraulic tainter gates, hoist trash racks and rakes, lock equipment-miter gates and operators, culvert valves and operators; specialized equipment; namely, hydraulic presses, leveling jacks, movable stands, barge hauls, hoist and gear reduction units, hydraulic units, coke ovens, ash handling systems; namely, mixer conditioner unloaders, dustless unloaders, chain conveyors, belt conveyorsSECTION 8 - CANCELLEDJan 2, 1990
042design, inspection, and testing of materials handling equipment; namely, car dumpers, train positioners, stackers, reclaimers, clamshell bucket unloaders, whirler cranes, portal cranes, bridge cranes, ship loaders, barge loaders, continuous barge unloaders, bulk handlers and accessories therefor; namely, bucket wheel stacker/reclaimers, conveyors, belt feeders, pneumatic handlers and accessories; therefor; namely, bin dischargers and gates, winches, vertical screw unloaders, log grapple cranes, log lifters, coal preparation equipment; namely, coal dryers, rotary coal breakers, conveyor belt plows, slider beds, water contol gates and valves for dams and hydroelectric generating facilities, and hoists and accessories therefor; namely, operators for spillway crest gates, vertical liftgates, hoists, hoisting equipment-wire rope and hydraulic tainter gates, hoist trash racks and rakes, lock equipment-miter gates and operators, culvert valves and operators; specialized equipment; namely, hydraulic presses, leveling jacks, movable stands, barge hauls, hoist and gear reduction units, hydraulic units, coke ovens, ash handling systems; namely, mixer conditioner unloaders, dustless unloaders, chain conveyors, belt conveyorsSECTION 8 - CANCELLEDJan 2, 1990

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 18, 2004CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Apr 3, 2000C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 17, 1999815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Dec 14, 1993R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 21, 1993PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 20, 1993NPUBNOTICE OF PUBLICATION—
Jun 23, 1993CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 10, 1993CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 9, 1992CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 8, 1992CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 4, 1992CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 1991CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 1991DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance