Drawing for ZURN

USPTO serial 74436284

ZURN

Reviewed by CopyMark Law Group

Reg. 1900325Status 710
Filing date
Status date
Registration date
Jun 20, 1995
Examiner
RICARDO, RANDY
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ZURN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Charles L. Lovercheck

CHARLES L LOVERCHECK LOVERCHECK & LOVERCHECK931 STATE STERIE, PA 16501-1451UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006metal hydromechanical controls namely, roof drains, floor drains, traps, primers, valves, adapters, interceptors, cleanouts, siphon jets; for metal duct work and expansion jointsSECTION 8 - CANCELLEDSep 1, 1902
007machine parts used as driveline connections, namely flexible couplings, flexible jaw couplings, gear couplings, multiple convoluted diaphragm couplings, flexible spindles, universal joints, general purpose couplings, composite shafting, composite flexible element coupling assemblies, automatic backstops, one-way clutches, clutch couplings, free wheel clutches, overload release air clutches, overload release clutches, centrifugal clutch coupling, wet scrubbers for paper and pulp industry, for steel and metal industry for incinerators and for hydrostatic air pollution control unitsSECTION 8 - CANCELLED—
011air cleaning and purification units, heavy duty industrial fans, fans, dampers of the guillotine type for process and the louver type for regulating flow, heavy duty centrifugal fans and heavy duty dampers for industrial uses, air drying systems, namely refrigerated air dryers, heaterless and heated regenerative desiccant dryers, dehydration and purification units, air-cooled and water-cooled after coolers, non-regenerative dryers and parts therefor; dust and fume control units, dust collectors, multiple-tube mechanical dust collectors, fabric air filters for steam generators including reverse air filters, pulse jet filters and shaker baghouse filters, industrial heat dampers for process isolation and by-pass systems for regulating flow, fire sprinklers, pressure reducing fire sprinkler and fire hose valves, water closets and parts therefor, wall and ground hydrants, water hammer arrestors, floor drains and strainers for waste applications in food preparation areas and hospital areas, pressure reducing fire sprinkler and fire hose valves, backwater valves to prevent backflow of waste water, water closet and urinal flush valves for commerical, industrial and institutional buildings, steam generating systems, namely water tube steam generators, and heat recovery steam generators, spreader storers for burning coal, wood, refuse and biomass fuels for solid, liquid, gaseous fuel, heat recovery components, namely economizers and air heaters, high pressure vessels and boiler components, drums and headersSECTION 8 - CANCELLEDSep 1, 1902
035industrial management of steam and power generation systemsSECTION 8 - CANCELLEDMay 1, 1982
037construction services, namely planning, laying out and custom construction of steam and power generating facilities, installation of fire extinguishing sprinkler systemsSECTION 8 - CANCELLEDMay 1, 1982
042design for others in the field of steam and power generation engineeringSECTION 8 - CANCELLEDMay 1, 1982

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 29, 2002C8..CANCELLED SEC. 8 (6-YR)—
Jun 20, 1995R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 28, 1995PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 24, 1995NPUBNOTICE OF PUBLICATION—
Nov 1, 1994CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 25, 1994CNEAEXAMINER'S AMENDMENT MAILED—
Oct 20, 1994DOCKASSIGNED TO EXAMINER—
Sep 16, 1994CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 14, 1994CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 14, 1994CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 1994CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Frequently asked questions

Related guidance