USPTO serial 74574015
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Performance Contracting Group, Inc.
Lenexa, KS
Other trademarks owned by Performance Contracting Group, Inc.
Performance Contracting Group, Inc.
Lenexa, KS
Other trademarks owned by Performance Contracting Group, Inc.
Performance Contracting Group, Inc.
Lenexa, KS
Other trademarks owned by Performance Contracting Group, Inc.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | metal insulation jacketing for use in nuclear power facilities; miscellaneous metal components for use in construction of environmental control structures, namely batten wall segments, molding, clips and connectors, shim plate spacers, batten closure covers, base plates | SECTION 8 - CANCELLED | Mar 1, 1994 |
| 009 | [ protective clothing used in the nuclear, environmental control, power and process and industrial industries, namely coveralls, hoods, boots, pants, and jackets worn as outer-garments, and pants and shirts worn as the undergarment of other named protective garments and as a modesty garment upon shedding the outer garment ] | SECTION 8 - CANCELLED | Jul 11, 1994 |
| 017 | thermal, acoustic, fire, contamination and weather insulation and insulatory barriers made primarily of one of more of aluminum, galvanized material, fire resistant plastic, polypropylene, [ poron foam, ] polystyrene, synthetic rubber, polyvisquen, sheet metal, urethane, polyisocyanurate, other foams and plastic, for use in areas such as - nuclear, gas, geothermal, electrical, and fossil fuel power plants; resource recovery and cogeneration facilities; refineries and chemical process plants; ships; cold storage facilities; environmental control structures ("clean rooms"); and other power and process, manufacturing, commercial and industrial building structures | SECTION 8 - CANCELLED | Mar 1, 1994 |
| 037 | installation of drywall, flooring, and ceilings for all types of commercial, industrial and government construction; installation of environmental control structures, such as "clean rooms"; insulation contracting services, namely services of insulation of mechanical systems (including, for example, pipes, ductwork, precipitators, boilers, turbines, tanks, generators, baghouses, scrubbers, AQCS components and other equipment) for commercial, industrial, power and process, manufacturing and government construction; insulation of such mechanical systems for nuclear, gas, geothermal, electrical and fossil fuel power plants; insulation of such mechanical systems in refineries and chemical process plants; insulation of such mechanical systems for resource recovery and cogeneration facilities; insulating of such mechanical systems in ships; contracting services relating to the construction of cold storage facilities | SECTION 8 - CANCELLED | Apr 1, 1993 |
| 042 | design for others of environmental control structures; design for others of cold storage structures; design for others of insulation components in nuclear, gas, geothermal, electrical and fossil fuel power plants, refineries and chemical process plants, resource recovery and cogeneration facilities, and other structures within the commercial, manufacturing, governmental, marine (ships) and industrial industries | SECTION 8 - CANCELLED | Apr 1, 1993 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 20, 2007 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Aug 10, 2006 | CFIT | CASE FILE IN TICRS | — |
| Nov 25, 2002 | A7OK | AMENDMENT UNDER SECTION 7 - PROCESSED | — |
| Oct 16, 2002 | RRPR | RESPONSE RECEIVED TO POST REG. ACTION | — |
| Oct 16, 2002 | PAPER RECEIVED | — | |
| May 30, 2002 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Apr 15, 2002 | AMD7 | SEC 7 REQUEST FILED | — |
| Apr 15, 2002 | PAPER RECEIVED | — | |
| Nov 2, 2001 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 4, 2001 | 815F | REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED | — |
| Apr 16, 1996 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 23, 1996 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 22, 1995 | NPUB | NOTICE OF PUBLICATION | — |
| Oct 16, 1995 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 26, 1995 | CNEA | EXAMINER'S AMENDMENT MAILED | — |
| Sep 22, 1995 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Aug 25, 1995 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 15, 1995 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 12, 1995 | CNEA | EXAMINER'S AMENDMENT MAILED | — |
| Apr 6, 1995 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 21, 1995 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 9, 1995 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 8, 1995 | DOCK | ASSIGNED TO EXAMINER | — |