Drawing for MD

USPTO serial 75019025

MD

Reviewed by CopyMark Law Group

Reg. 2136538Status 710
Filing date
Status date
Registration date
Feb 17, 1998
Examiner
STRASER, RICHARD
Law office
GENERIC WEB UPDATE

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with MD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lisa Kimes Jones

Lisa Kimes Jones Hexion Inc.12650 Directors Drive, Suite 100Stafford, TX 77477UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001[ full line of adhesives for use in building, construction, and repair ]SECTION 8 - CANCELLED—
002[full line of sealer coatings for use in building, construction and repair; a full line of interior and exterior glazes, paints, lacquers and stains; wood patching and preservative, metal patching and preservative]SECTION 8 - CANCELLED—
006[full line of metal hardware for doors; a full line of metal shapes and sheeting for use in building, construction and repair; a full line of metal screen and storm window frame sections and accessory parts; metal sawhorses; a full line of metal floor, stair and carpet trim; a full line of metal standards, brackets and accessory parts; a full line of metal mouldings for use in building, construction and repair; a full line of metal mail drops and mail drop liners; a full line of metal house and building numbers and letters; a full line of metal closet rods and closet door hardware and accessory parts; a full line of metal shower rods and accessory parts; a full line of metal door kick plates and push plates; a full line of metal door and patio grilles; a full line of metal vents and vent covers]SECTION 8 - CANCELLED—
008[full line of hand-operated tools and replacement parts and accessories for use in building, construction and repair]SECTION 8 - CANCELLED—
009[full line of plumb levels and surveyors' levels and replacement parts and accessories for use in building, construction and repair]SECTION 8 - CANCELLED—
011[electric cable used to heat pipes, gutters and roofs]SECTION 8 - CANCELLED—
016[chalks, chalk reels and chalk reel replacement lines for use in building, construction and repair; a full line of paper signs for buildings]SECTION 8 - CANCELLED—
017full line of weatherstripping for building, construction and repair; a full line of caulking and caulking compounds for use in building, construction and repair, a full line of adhesives, sealants for use in building, construction and repair; a full line of pipe, duct and water heater insulation for use in building, construction and repairSECTION 8 - CANCELLED—
019[full line of roof coatings for use in building, construction and repair; a full line of wood trim for use in building, construction and repair; a full line of spackling compounds and products for use in building, construction and repair; a full line of non-metal floor, stair and carpet trim and accessories; a full line of vinyl wall base and vinyl stair treads; a full line of plastic mouldings for use in building, construction and repair; asphalt patching compound]SECTION 8 - CANCELLED—
020[full line of shelving and brackets for use in building, construction and repair; a full line of nonmetal house and building numbers and signs]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 29, 2019ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Nov 30, 2018ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Nov 27, 2018C8.TCANCELLED SEC. 8 (10-YR)—
Feb 9, 2018PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Feb 9, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 22, 2018E89RTEAS SECTION 8 & 9 RECEIVED—
Feb 17, 2017REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Mar 18, 2015ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Nov 5, 2014ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 8, 2013ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Apr 17, 2013ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 30, 2012ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jul 29, 2009ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jul 8, 2009ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Oct 30, 2008RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Oct 30, 20089G8PREGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8—
Oct 24, 20088PRTREGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED—
Sep 17, 2008CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 17, 2008COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 21, 2008PLGLASSIGNED TO PARALEGAL—
Aug 14, 200889AFREGISTERED - COMBINED SECTION 8 (10-YR) & SEC. 9 FILED—
Aug 14, 2008E89RTEAS SECTION 8 & 9 RECEIVED—
Aug 11, 2008ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 11, 2008REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 16, 2008ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jul 4, 2007ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Apr 3, 2007CFITCASE FILE IN TICRS—
Mar 9, 2007TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 22, 2004C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Apr 1, 2004815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Feb 17, 1998R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 25, 1997PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 24, 1997NPUBNOTICE OF PUBLICATION—
Sep 9, 1997CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 9, 1997DOCKASSIGNED TO EXAMINER—
Aug 25, 1997CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 23, 1997CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 12, 1997DOCKASSIGNED TO EXAMINER—
Nov 25, 1996CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 22, 1996CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 1996DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance