Drawing for K S B

USPTO serial 75193061

K S B

Reviewed by CopyMark Law Group

Reg. 2221113Status 800Registered
Filing date
Status date
Registration date
Feb 2, 1999
Examiner
BUSH, KAREN K
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with K S B?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

David J. Ervin

David J. Ervin Crowell & Moring LLPP.O. Box 14300Washington, DC 20044-4300UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006iron, steel and steel alloys used for casting; metal castings for pump or valve parts; semi-finished and finished cast metal pump and valve parts; sand molds and patterns for cast iron production; metal pipes; manually, pneumatically, hydraulically or electrically operated metal valves; globe valves, gate valves, butterfly valves and diaphragm valves for liquid or gas pipelines for building construction, municipal, domestic, industrial or power generation useACTIVE—
007pumps, namely, water supply pumps, waste water disposal pumps, pressure boosting pumps, drainage pumps, sewage pumps, sewage lifting pumps, slurry pumps, cooling or heat transfer fluid circulating pumps, submersible borehole pumps, multi-stage water pumps, well pumps, corrosion-resistant pumps, hermetically-sealed pumps, desalination plant pumps, irrigation pumps, oil and chemical pumps, magnetic drive pumps, explosion-proof pumps, pumps for conventional power plants, namely, boiler feed and circulating pumps, cooling water pumps and condensate pumps; pumps for nuclear power stations, namely, main coolant pumps and secondary circuit pumps; pumps for the petroleum industry, namely, injection pumps; refinery pumps and pipeline pumps; electric motors for pumps or valves; variable speed drives for pumps; canned pumps, namely, pumps with integrated motors; mixers and agitators for use in sewage treatment or in the chemical industry, hydraulic, pneumatic and electric valve actuatorsACTIVE—
009electric and electronic equipment, namely, pump and/or valve operation sensors and monitors for sensing and monitoring position, temperature, pressure, leakage, speed, vibration and/or liquid level; openloop and closed loop pump and/or valve controllers; electric cables and electric wire lines; flow measurement and regulating valves; computers, and computer software for monitoring and/or controlling pumps or valvesACTIVE—
011municipal or industrial water treatment plants; waste water or sewage treatment plants; pumps and valves as parts of water supplies, boilers, air conditioners, conventional or nuclear power plants; sewage lifting unitsACTIVE—
035[ management and utilization of copyrights and industrial protective rights ]SECTION 8 - CANCELLED—
037supervising installation of pumps and/or valves, associated motors and pump and/or valve controls by others; installation of pumps and/or valves, associated motors and pump and/or valve controls; inspection, testing, maintenance and/or repair of pumps and/or valves, associated motors and pump and/or valve controlsACTIVE—
041training and education of personnel for others, namely, conducting classes, seminars and on-the-job training relating to pump and/or valve selection, installation, inspection, testing, maintenance and/or repair; publication of books, brochures, pamphlets and bulletins with scientific and technical contentsACTIVE—
042consulting and engineering services relating to fluid transport, handling and/or treatment or to pump and/or valve selection, installation, inspection, testing, maintenance and/or repair; materials testing and component performance and function testing of products for others; quality assurance services, namely, development and promulgation of quality standards and guidelines relating to pumps and/or valves; research and development for third parties, especially conducting scientific studies and analyses; preparing, improving and updating computer programs for third partiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 6, 2019NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Mar 6, 2019RNL2REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Mar 6, 201989AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Mar 6, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 1, 2019E89RTEAS SECTION 8 & 9 RECEIVED—
Jan 30, 2019ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Mar 17, 2009RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Mar 17, 200989AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Mar 2, 2009PLGLASSIGNED TO PARALEGAL—
Dec 12, 2008E89RTEAS SECTION 8 & 9 RECEIVED—
Apr 11, 2005UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN—
Apr 11, 2005MAILPAPER RECEIVED—
Mar 30, 2005C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jan 19, 2005815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Jan 19, 2005MAILPAPER RECEIVED—
Feb 2, 1999R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 21, 19981.BDSec. 1(B) CLAIM DELETED—
Dec 21, 1998IUCNNOTICE OF ALLOWANCE CANCELLED—
Oct 6, 1998NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 14, 1998PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 12, 1998NPUBNOTICE OF PUBLICATION—
Apr 17, 1998CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 26, 1998DOCKASSIGNED TO EXAMINER—
Feb 12, 1998CNEAEXAMINER'S AMENDMENT MAILED—
Feb 12, 1998DOCKASSIGNED TO EXAMINER—
Nov 19, 1997CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 3, 1997DOCKASSIGNED TO EXAMINER—
May 19, 1997CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 12, 1997DOCKASSIGNED TO EXAMINER—
May 9, 1997DOCKASSIGNED TO EXAMINER—
Dec 30, 1996CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—

Frequently asked questions

Related guidance