Drawing for SIEMENS POWER GENERATION-POWER FOR GENERATIONS

USPTO serial 75241258

SIEMENS POWER GENERATION-POWER FOR GENERATIONS

Reviewed by CopyMark Law Group

Reg. 2203560Status 710
Filing date
Status date
Registration date
Nov 17, 1998
Examiner
MCGEE, KAREN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SIEMENS POWER GENERATION-POWER FOR GENERATIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

LAWRENCE E ABELMAN

LAWRENCE E ABELMAN ABELMAN FRAYNE & SCHWAB150 E 42ND STNEW YORK, NY 10017UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007hydraulic turbines and electric generators for power generationSECTION 8 - CANCELLED—
009electrical control center comprising computer terminals and computer software for the operation of power plantsSECTION 8 - CANCELLED—
037construction planning, construction and repair of industrial and process engineering plants, namely, overground workings and underground workings; civil engineering, installation, erection maintenance, construction supervision and repair of industrial and process engineering plants and electrical apparatus for power generationSECTION 8 - CANCELLED—
042research in the field of power generation and process engineering; engineering and architectural design services; technical consultation in the field of power generation and process engineering; providing expert opinions in the field of power generation and process engineering; designing computer programs for others for data processing related to process engineering for constructing, equipping and operating industrial power generating and process engineering plants; and, material testingSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 20, 2005C8..CANCELLED SEC. 8 (6-YR)—
Nov 17, 1998R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 28, 1998PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 26, 1998NPUBNOTICE OF PUBLICATION—
Feb 23, 1998CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 4, 1998CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 16, 1997CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.