Drawing for M MANNESMANN

USPTO serial 75289968

M MANNESMANN

Reviewed by CopyMark Law Group

Reg. 2591817Status 710
Filing date
Status date
Registration date
Jul 9, 2002
Examiner
CHOSID, ROBIN S
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with M MANNESMANN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

THOMAS S BAKER

1371 W 3RD AVECOLUMBUS, OH 43212UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035computerized database managementSECTION 8 - CANCELLEDDec 14, 1998
036financial analysis and consultation services; fiscal assessment and evaluation servicesSECTION 8 - CANCELLEDDec 14, 1998
037installation, maintenance, and repair of industrial apparatus, electrical and electronic devices, equipment, instruments, machines, plants, production facilities, and component parts therefor, namely, compressors, hydraulic pumps, motors and valves, hydromechanical drives, fixed and mobile cranes, conveyors and cargo and baggage handling machines, injection molding machines, electric arc and oxygen steel mills, continuous slab casting mills, in line strip steel mills, hydrogen plants, refineries, ethylene furnaces, water treatment plants, waste treatment plants, injection molding machines, automobile information systems such as navigation and communication, automobile controls, automobile fuel system management controls, automobile clocks, automobile dampers, automobile clutches, automobile torque convertors, automobile shock absorbers; warehouse construction and repair servicesSECTION 8 - CANCELLEDDec 14, 1998
038telecommunications services, namely, mobile radio communications networks and fixed networks servicesSECTION 8 - CANCELLEDDec 14, 1998
039freight ship brokerage, transport, and unloading services, namely, shipping, handling, monitoring, processing, and supervising the goods of othersSECTION 8 - CANCELLEDDec 14, 1998
040assembly of industrial apparatus, electrical and electronic devices, equipment, instruments, machines, plants, production facilities, component parts therefor, namely, compressors, hydraulic pumps, motors and valves, hydromechanical drives, fixed and mobile cranes, conveyors and cargo and baggage handling machines, injection molding machines, electric arc and oxygen steel mills, continuous slab casting mills, in line strip steel mills, hydrogen plants, refineries, ethylene furnaces, water treatment plants, waste treatment plants, injection molding machines, automobile information systems such as navigation and communication, automobile controls, automobile fuel system management controls, automobile clocks, automobile dampers, automobile clutches, automobile torque convertors, automobile shock absorbersSECTION 8 - CANCELLEDDec 14, 1998
041training in the operation and use of industrial equipment, namely, compressors, hydraulic pumps, motors and valves, hydromechanical drives, fixed and mobile cranes, conveyors and cargo and baggage handling machines, injection molding machines, electric arc and oxygen steel mills, continuous slab casting mills, in line strip steel mills, hydrogen plants, refineries, ethylene furnaces, water treatment plants, waste treatment plants, injection molding machines, automobile information systems such as navigation and communication, automobile controls, automobile fuel system management controls, automobile clocks, automobile dampers, automobile clutches, automobile torque convertors, automobile shock absorbersSECTION 8 - CANCELLEDDec 14, 1998
042engineering services; consultation in the fields of chemistry and physics; and technical and product development consultation and research relating to equipment, plants, and facilities in the fields of metallurgy, mechanical engineering, hydraulics, and pneumatics, vehicular engineering, and telecommunications; testing, analysis, and evaluation of the goods and services of others for the purpose of certification; technical report writing for others; and database development servicesSECTION 8 - CANCELLEDDec 14, 1998

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 11, 2009C8..CANCELLED SEC. 8 (6-YR)—
Dec 10, 2007CFITCASE FILE IN TICRS—
Jul 9, 2002R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 23, 2002MAILPAPER RECEIVED—
Mar 13, 2002CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Feb 26, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 19, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 4, 2000CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 3, 2000DOCKASSIGNED TO EXAMINER—
Aug 2, 2000DOCKASSIGNED TO EXAMINER—
Jul 27, 2000SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jun 2, 2000IUAFUSE AMENDMENT FILED—
Dec 7, 1999NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 14, 1999PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 13, 1999NPUBNOTICE OF PUBLICATION—
Apr 27, 1999CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 1999CNEAEXAMINER'S AMENDMENT MAILED—
Apr 15, 1999ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 19, 1999NPUBNOTICE OF PUBLICATION—
Sep 10, 1998CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 5, 1998CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 17, 1997CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 1997DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance