USPTO serial 75302170
BG
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- FICKES, JERI J
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with BG?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
BG INTELLECTUAL PROPERTY LIMITED
READING BERKSIRE, GB
BG INTELLECTUAL PROPERTY LIMITED
READING BERKSIRE, GB
Reading, Berkshire, RG6 1PT, GB
LONDON WCEN 5EH, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
WILLIAM H HOLT
WILLIAM H HOLT LAW OFFICES OF WILLIAM H HOLT12311 HARBOR DRIVEWOODBRIDGE, VA 22192UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | GAS, NAMELY, METHANE, ETHANE, PROPANE, PENTANE, NATURAL GAS, HYDROCARBON CONDENSATES; PETROLEUM, NAMELY, CRUDE OILS, AND COMBUSTIBLE MINERAL OILS CONSISTING MAINLY OF RAW HYDROCARBONS PRODUCED IN NATURE | ACTIVE | — |
| 037 | INSTALLATION, REPAIR, EMERGENCY SERVICING AND MAINTENANCE OF GAS APPLIANCES, PIPEWORK, APPARATUS AND INSTRUMENTS UTILIZING GAS; LAYING, REPAIR, MAINTENANCE, REPLACEMENT, REFURBISHMENT AND INSPECTION OF PIPELINES; REPAIR OF ROADS AND PATHS; CONSTRUCTION, REPAIR AND MAINTENANCE OF GAS INSTALLATIONS, SERVICES RELATING TO THE INSTALLATION, REPAIR AND MAINTENANCE OF ENERGY-USING APPLIANCES AND INSTRUMENTS AND TO THE CONSTRUCTION, REPAIR AND MAINTENANCE OF ENERGY-USING INSTALLATIONS; INSTALLATION OF INSULATING MATERIALS; DRILLING OF WELLS; EXTRACTION OF OIL AND GAS, OIL AND GAS DRILLING, OIL AND GAS PUMPING AND EXTRACTION; UNDERWATER CONSTRUCTION; DEMOLITION OF HOUSES AND BUILDINGS; BUILDING CONSTRUCTION SERVICES; LAND DEVELOPMENT SERVICES; CONSTRUCTION, MAINTENANCE AND RENOVATION OF PROPERTY; DISMANTLING AND REMOVING UNUSED OIL PLATFORMS AND DRILLING RIGS | ACTIVE | — |
| 038 | COMMUNICATION AND TELEMETRY SERVICES, NAMELY, PROVIDING COMMUNICATION BY RADIO SYSTEMS, COMPUTER TERMINALS, TELEPHONE, TELEGRAM, TELEGRAPH, AND FACSIMILE | ACTIVE | — |
| 039 | STORAGE, DISTRIBUTION, TRANSPORTATION, SHIPPING, DELIVERY AND METERING OF GAS, LIQUEFIED NATURAL GAS, GASEOUS FUELS AND OILS, TRANSMISSION AND/OR DISTRIBUTION AND/OR SUPPLY OF ELECTRICITY; LEASING AND RENTAL OF CARS AND COMMERCIAL VEHICLES; UNDERWATER DIVING SERVICES; ELECTRIC UTILITY GENERATING SERVICES; LEASING OF PROPERTY, NAMELY, TANKERS AND OTHER SHIPS, VESSELS AND WATERCRAFTS, HOVERCRAFT, MOTOR VEHICLES, AIRCRAFT, AIRSHIPS, RAILWAY LOCOMOTIVES, WAGONS, TRUCKS; MAINTAINING A DATABASE PERTAINING TO ASPECTS OF AN INTERNATIONAL ENERGY PRODUCTION AND DISTRIBUTION COMPANY, NAMELY FUEL STORAGE, DISTRIBUTION, TRANSMISSION AND SUPPLY | ACTIVE | — |
| 042 | SERVICES RELATING TO THE AUDITING OF ENERGY CONSUMPTION AND TESTING OF THE EFFICIENCY OF OPERATION OF APPLIANCES AND THE SAFETY CHECKING OF APPLIANCES AND PIPE WORK; SCIENTIFIC, ENGINEERING, AND ENVIRONMENTAL RESEARCH AND DEVELOPMENT SERVICES;GEOPHYSICAL AND GEOLOGICAL SURVEY SERVICES; EXPLORATION AND PRODUCTION OF GAS AND OIL; UNDERWATER EXPLORATION; LAND SURVEYING- SERVICES; COMPUTER SERVICES, NAMELY,MAINTAINING A DATABASE PERTAINING TO ASPECTS OR AN INTERNATIONAL ENERGY PRODUCTION AND DISTRIBUTION COMPANY, NAMELY GEOPHYSICAL EXPLORATION OF FUEL SOURCES, DESIGNING COMPUTER SOFTWARE FOR OTHERS; COMPUTER PROGRAMMING SERVICES FOR OTHERS; WASTE DISPOSAL SERVICES FOR OTHERS; DEMOLITION OF OBJECTS WHICH ARE NOT BUILDINGS; TESTING OF GAS APPLIANCES,PIPE WORK, APPARATUS, AND INSTRUMENTS UTILIZING GAS; INSPECTION OF PIPELINES,TESTING OF GAS APPLIANCES, PIPEWORK, APPARATUS AND INSTRUMENTS UTILIZING GAS | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BG INTELLECTUAL PROPERTY LIMITED
- Other trademarks owned by BG INTELLECTUAL PROPERTY LIMITED
- Other trademarks owned by BG plc
- Other trademarks owned by TRANSCO PLC
- Other trademarks in Class 004
- Other trademarks in Class 037
- Other trademarks in Class 038
- Other trademarks in Class 039
- Other trademarks in Class 042
- Similar marks named BG
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 8, 2008 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Sep 8, 2008 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jan 8, 2008 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 29, 2007 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Nov 29, 2007 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Nov 29, 2007 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Sep 10, 2007 | PAPER RECEIVED | — | |
| Mar 21, 2005 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Oct 19, 2004 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Sep 21, 2004 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 1, 2004 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 9, 2004 | FAXX | FAX RECEIVED | — |
| Jun 26, 2004 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 17, 2004 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 12, 2004 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 6, 2004 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 3, 2004 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Apr 22, 2004 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 22, 2004 | PAPER RECEIVED | — | |
| Mar 17, 2004 | CFIT | CASE FILE IN TICRS | — |
| Aug 28, 2003 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Jul 24, 2003 | CNSL | LETTER OF SUSPENSION MAILED | — |
| May 22, 2003 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 22, 2003 | PAPER RECEIVED | — | |
| May 20, 2003 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 20, 2003 | PAPER RECEIVED | — | |
| Nov 20, 2002 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Oct 31, 2002 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 9, 2002 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 16, 2001 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 19, 2000 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Jun 19, 2000 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 10, 2000 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 17, 1999 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Apr 5, 1999 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Feb 17, 1999 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 17, 1998 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 8, 1998 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 11, 1998 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 11, 1997 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 3, 1997 | DOCK | ASSIGNED TO EXAMINER | — |