Drawing for MACKLANBURG-DUNCAN

USPTO serial 75391549

MACKLANBURG-DUNCAN

Reviewed by CopyMark Law Group

Reg. 2288513Status 710
Filing date
Status date
Registration date
Oct 26, 1999
Examiner
WOOD, CAROLINE
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with MACKLANBURG-DUNCAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Catherine Mennenga

CATHERINE MENNENGA GENERAL ELECTRIC COMPANY3135 EASTON TPKEFAIRFIELD, CT 06828UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001full line of adhesives for use in building, construction, and repairSECTION 8 - CANCELLED—
002full line of sealer coatings for use in building, construction and repair; stains for use on concrete; wood patching and preservatives, metal patching and preservativesSECTION 8 - CANCELLED—
006full line of metal hardware for doors; a full line of metal shapes and sheeting for use in building, construction and repair; a full line of metal screen and storm window frame sections and accessory parts; metal sawhorses; a full line of metal floor, stair and carpet trim; a full line of metal standards, brackets and accessory parts; a full line of metal mouldings for use in building, construction and repair; a full line of metal mail drops and mail drop liners; a full line of metal house and building numbers and letters; a full line of metal signs; a full line of metal closet rods and closet door hardware and accessory parts; a full line of metal shower rods and accessory parts; a full line of metal door kick plates and push plates; a full line of metal door and patio grilles; a full line of metal vents and vent covers; a full line of metal millwork; a full line of metal weatherstripping; a full line of metal smoke sealsSECTION 8 - CANCELLED—
008full line of hand-operated tools and replacement parts and accessories for use in building, construction and repairSECTION 8 - CANCELLED—
009full line of plumb levels and surveyors' levels and replacement parts and accessories for use in building, construction and repair; all purpose reflectors; and driveways markersSECTION 8 - CANCELLED—
011electric cable used to heat pipes, gutters and roofsSECTION 8 - CANCELLED—
016chalks, chalk reels and chalk reel replacement lines for use in building, construction and repair; a full line of paper signs for buildingsSECTION 8 - CANCELLED—
017full line of weatherstripping for building, construction and repair; a full line of caulking and caulking compounds for use in building, construction and repair; a full line of adhesive sealants for use in building, construction and repair; a full line of pipe, duct and water heater insulation for use in building, construction and repairSECTION 8 - CANCELLED—
019full line of roof coatings for use in building, construction and repair; a full line of wood trim for use in building, construction and repair; a full line of spackling compounds and products for use in building, construction and repair; a full line of nonmetal floor, stair and carpet trim and accessories; a full line of vinyl wall base and vinyl stair treads; a full line of plastic mouldings for use in building, construction and repair; asphalt patching compound; vinyl door sweeps; a full line of nonmetal smoke sealsSECTION 8 - CANCELLED—
020full line of shelving and brackets for use in building, construction and repair, a full line of nonmetal house and building numbers and letters; a full line of nonmetal signsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 29, 2006C8..CANCELLED SEC. 8 (6-YR)—
Jun 15, 2006CFITCASE FILE IN TICRS—
Jul 1, 2005ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 1, 2005REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 26, 1999R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 3, 1999PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 2, 1999NPUBNOTICE OF PUBLICATION—
Apr 26, 1999CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 21, 1999CNEAEXAMINER'S AMENDMENT MAILED—
Jan 19, 1999CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 19, 1999CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 17, 1998CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Frequently asked questions

Related guidance