Drawing for EDISON O&M

USPTO serial 75558685

EDISON O&M

Reviewed by CopyMark Law Group

Reg. 2562133Status 710
Filing date
Status date
Registration date
Apr 16, 2002
Examiner
WEBSTER, WILLIAM M
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with EDISON O&M?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

RICHARD E. LYON JR.

RICHARD E LYON JR HOLLAND & KNIGHT LLP633 W FIFTH ST 21ST FLLOS ANGELES, CA 90071-2040UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035business management services, namely, managing energy production and distribution facilities for others; operation of a business for others, namely, energy production and distribution facilities; operation of a business for others, namely, continuous industrial emissions monitoring systems and pollution mitigation systemsSECTION 8 - CANCELLED—
037maintenance services for energy production and distribution facilities and related equipment; maintenance of industrial equipment, namely, infrared cameras, acoustic couplers, laser alignment tools; construction management services, namely, project and site management services for the construction of energy production and distribution facilities; installation and maintenance services for continuous industrial emissions monitoring systems and pollution mitigation systems; repair services, namely, seismic retrofitting services comprising building construction and repair, and planning for use in remediating or preventing damage from seismic activitySECTION 8 - CANCELLED—
041Educational services, namely, conducting classes, seminars, lectures, and hands-on training in the field of operation and maintenance of energy production and distribution facilities, and construction management servicesSECTION 8 - CANCELLED—
042Geotechnical services, namely, soil evaluations, dam and embankment safety evaluations, slope stability analyses, seismic evaluations, ground and foundation settlement evaluations, foundation and grading design and inspections, earth structure design and evaluations, and foundation engineering services; environmental related services, namely, environmental consulting services on air and water quality and hazardous waste issues, site assessments, hazardous waste investigations, ground water monitoring, ground water restoration system design and construction, water supply and quality assessments, water treatment services, water seepage studies, water retention basin design, leak detection services, and environmental permitting and regulatory support services in the areas of air and water quality, hazardous materials and waste management; metallurgical and chemical engineering research and consulting services; instrumentation and controls engineering services for use in accessing heat rate performance and thermal efficiency; civil, structural, electrical and mechanical engineering services; inspection services to ensure compliance with applicable industry standards and regulatory requirements; environmental performance analysis services in the fields of industrial plants and equipment; consulting services in the nature of operation and maintenance software application analyses and updating of computer software; and system integration services, namely evaluating computer software for program compatibility in industrial operation and maintenance applicationsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 24, 2009C8..CANCELLED SEC. 8 (6-YR)—
May 8, 2007CFITCASE FILE IN TICRS—
Apr 2, 2003TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 16, 2002R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 21, 2001CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Dec 12, 2001SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Nov 28, 2001IUAFUSE AMENDMENT FILED—
May 29, 2001NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 6, 2001PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 21, 2001NPUBNOTICE OF PUBLICATION—
Sep 11, 2000CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 28, 2000CNEAEXAMINER'S AMENDMENT MAILED—
Aug 28, 2000ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Aug 14, 2000CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 14, 2000DOCKASSIGNED TO EXAMINER—
Dec 9, 1999CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 9, 1999CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 1999DOCKASSIGNED TO EXAMINER—
Feb 9, 1999DOCKASSIGNED TO EXAMINER—
Feb 5, 1999DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance