Drawing for APS

USPTO serial 75591594

APS

Reviewed by CopyMark Law Group

Reg. 2337811Status 710
Filing date
Status date
Registration date
Apr 4, 2000
Examiner
VANSTON, KATHY
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with APS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christy L.E. Hubbard

CHRISTY LE HUBBARD LEWIS & ROCA LLP40 N CENTRAL AVE STE 1900PHOENIX, AZ 85004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
040CUSTOM MANUFACTURE OF ENERGY MANAGEMENT SYSTEMS AND EQUIPMENT, QUALITY CONTROL SYSTEMS AND EQUIPMENT, AIR CONDITIONING AND COOLING SYSTEMS AND EQUIPMENT, HEATING SYSTEMS AND EQUIPMENT, VENTILATION AND CLIMATE CONTROL SYSTEMS AND EQUIPMENT, SOLAR ENERGY SYSTEMS AND EQUIPMENT, AND LIGHTING SYSTEMS AND EQUIPMENT TO THE ORDER AND SPECIFICATIONS OF OTHERS, ENERGY GENERATIONSECTION 8 - CANCELLED—
042DESIGNING, ENGINEERING AND LEASING FOR OTHERS ENERGY MANAGEMENT SYSTEMS AND EQUIPMENT, QUALITY CONTROL SYSTEMS AND EQUIPMENT, AIR CONDITIONING AND COOLING SYSTEMS AND EQUIPMENT, HEATING SYSTEMS AND EQUIPMENT, VENTILATION AND CLIMATE CONTROL SYSTEMS AND EQUIPMENT, SOLAR ENERGY SYSTEMS AND EQUIPMENT, AND LIGHTING SYSTEMS AND EQUIPMENT; ENGINEERING SERVICES IN THE FIELD OF POWER GENERATION, ELECTRIC TRANSMISSION AND DISTRIBUTION, AND WATER TREATMENT; REMOTE ENERGY METERING SERVICES; ENERGY CONSULTING SERVICES FEATURING ENERGY SCHEDULING SERVICES AND ENERGY LOAD MANAGEMENT SERVICES; ENERGY AUDITING SERVICESSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 6, 2007C8..CANCELLED SEC. 8 (6-YR)—
Apr 19, 2006CFITCASE FILE IN TICRS—
Dec 7, 2005ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 7, 2005REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 4, 2000R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 11, 2000PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 10, 1999NPUBNOTICE OF PUBLICATION—
Sep 20, 1999CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 26, 1999CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 25, 1999CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 19, 1999DOCKASSIGNED TO EXAMINER—
May 18, 1999DOCKASSIGNED TO EXAMINER—
Feb 3, 1999AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—

Frequently asked questions

Related guidance