Drawing for ROCK TO ROAD

USPTO serial 75604864

ROCK TO ROAD

Reviewed by CopyMark Law Group

Reg. 2392751Status 710
Filing date
Status date
Registration date
Oct 10, 2000
Examiner
MCGEE, KAREN
Law office
GENERIC WEB UPDATE

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ROCK TO ROAD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

David J. Hill

David J. Hill CHAMBLISS, BAHNER & STOPHEL, P.C1000 TALLAN BUILDINGTWO UNION SQUARECHATTANOOGA, TN 37402-2500

Goods and services

ClassDescriptionStatusFirst use
007Portable, stationary and relocatable asphalt manufacturing and processing plants and recycled asphalt processing plants; asphalt coaters; aggregate and recycled asphalt storage and feed bins, silos and batch towers; drum mixers; dust control collectors; roadway base and mixing plants; portable and stationary plants for mixing asphalt cement with crumb rubber polymers and other additives; equipment for use in road construction and repair and in the recycling of asphalt paving materials, namely planing and milling machines; asphalt recycling machines and paving machines; rock and mineral crushers and grinders; rock feeders and conveyors; vibratory screens; rock and mineral washing machines; sand classifiers; cyclone classifiers; combination rock crushers and feeders; combination rock crushers, feeders, hoppers and conveyors; trenching machines; rocksaws; canal excavators, and pipe-laying trenching machines; asphalt paving sample compacting machines; testing machines for testing samples of asphalt pavement; portadle asphalt testing laboratories; replacement parts for all of the aboveSECTION 8 - CANCELLEDMar 20, 1996
011Soil remediation plants for heating and processing contaminated soil; coal burners for use in manufacturing and processing asphalt; asphalt heaters and heated storage tanks; strainers; aggregate dryers; industrial heaters; replacement parts for all of the aboveSECTION 8 - CANCELLEDMar 20, 1996
012Land vehicles, namely, asphalt loader and transfer vehicles; structural parts thereforSECTION 8 - CANCELLEDMar 20, 1996

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 5, 2021CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Oct 10, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 14, 2010RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Oct 14, 201089AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Oct 8, 2010EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Sep 24, 2010PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Sep 9, 2010E89RTEAS SECTION 8 & 9 RECEIVED—
Jan 6, 2007C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 6, 2006815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Oct 6, 2006E815TEAS SECTION 8 & 15 RECEIVED—
Jan 4, 2006CFITCASE FILE IN TICRS—
Oct 10, 2000R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 18, 2000PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 16, 2000NPUBNOTICE OF PUBLICATION—
Apr 24, 2000CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 21, 2000CNEAEXAMINER'S AMENDMENT MAILED—
Jan 24, 2000CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 27, 1999CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 17, 1999DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance