Drawing for SAB WABCO

USPTO serial 75619554

SAB WABCO

Reviewed by CopyMark Law Group

Reg. 2754720Status 710
Filing date
Status date
Registration date
Aug 26, 2003
Examiner
DWYER, SEAN
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SAB WABCO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Peter D. Vogl

PETER D VOGL PENNIE & EDMONDS LLP1155 AVE OF THE AMERICAS FL 17NEW YORK, NY 10036-2720UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007MACHINE PARTS, NAMELY, AIR COMPRESSORS AND VALVES FOR PNEUMATIC BRAKE SYSTEMS FOR RAILWAY VEHICLES; MECHANICAL RETARDERS FOR RAILWAY MARSHALLING YARDSSECTION 8 - CANCELLED—
009ELECTRICAL INVERTERS; AMPLIFIERS; CONVERTERS; RECTIFIERS; INTEGRATED CIRCUITS; SENSORS; COMPUTERS, COMPUTER PROGRAMS, AND REGISTERED COMPUTER SOFTWARE STORED ON TAPES, CARDS, DISCS, OR PRINTED CIRCUIT BOARDS FOR USE IN CONTROLLING AND OPERATING RAILWAY VEHICLES, AND PARTS THEREFOR, NAMELY, BRAKES, SEMICONDUCTORS, INTEGRATED CIRCUITS AND MONITORS; PRE-RECORDED ELECTRICAL, MAGNETIC, AND OPTICAL DATA CARRIERS FEATURING INFORMATION ON CONTROLLING BRAKING VALVES AND BRAKING SYSTEMS FOR RAILWAY VEHICLESSECTION 8 - CANCELLED—
011AIR DRYERS; AIR CONDITIONERS; HEATING AND VENTILATION DEVICES, NAMELY, ELECTRIC RADIATORS, LOUVERS, AND FANS FOR INDUSTRIAL USE; TOILET DEVICES, NAMELY, BOWLS, SEATS, AND TANK BALLS; LIGHTING EQUIPMENT, NAMELY, LAMPS, LANTERNS, AND TORCHES, ALL FOR RAILWAY VEHICLESSECTION 8 - CANCELLED—
012DOORS AND DOOR OPERATING DEVICES, NAMELY DOOR OPENERS AND CLOSERS; CURRENT COLLECTORS AND PANTOGRAPHS; COUPLINGS; LAND VEHICLE PARTS, NAMELY, DRAFT GEAR, WHEELS, BRAKE DISCS, BRAKE LOCKS, AND BRAKE LININGS, ALL FOR RAILWAY VEHICLESSECTION 8 - CANCELLED—
037REPAIR AND MAINTENANCE OF RAILWAY VEHICLES AND PARTS AND ACCESSORIES THEREOF, INSTALLATION, REPAIR AND MAINTENANCE OF COMPUTER HARDWARE AND REGISTERED COMPUTER PROGRAMS IN THE FIELD OF RAILWAY VEHICLESSECTION 8 - CANCELLED—
042COMPUTER PROGRAMMING FOR OTHERS; RENTAL AND LEASING OF COMPUTERS; UPDATING OF COMPUTER SOFTWARE; INDUSTRIAL DESIGN OF COMPUTERS; RESEARCH AND DEVELOPMENT SERVICES FOR OTHERS OF NEW PRODUCTS IN THE FIELD OF RAILWAY VEHICLES; ENGINEERING SERVICES FOR OTHERS, NAMELY, ENGINEERING DESIGN OF RAILWAY VEHICLES; CONSULTING IN THE FIELD OF RAILWAY OPERATION; LEASING ACCESS TIME TO A COMPUTER DATABASE IN THE FIELD OF RAILWAY VEHICLES; MACHINE DESIGN AND CONSTRUCTION SERVICES; AND CONDUCTING FEASIBILITY STUDIES OF TECHNICAL PROJECTS IN THE FIELD OF RAILWAY VEHICLES; QUALITY CONTROL SERVICES FOR RAILWAY VEHICLES; REPAIRS AND MAINTENANCE OF COMPUTER SOFTWARESECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 3, 2010C8..CANCELLED SEC. 8 (6-YR)—
Jul 10, 2007CFITCASE FILE IN TICRS—
Aug 26, 2003R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 9, 20031.BDSec. 1(B) CLAIM DELETED—
Jun 30, 2003IUCNNOTICE OF ALLOWANCE CANCELLED—
Jun 25, 2003FAXXFAX RECEIVED—
Dec 31, 2002NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 8, 2002PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 18, 2002NPUBNOTICE OF PUBLICATION—
Jun 10, 2002CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 7, 2002DOCKASSIGNED TO EXAMINER—
Jun 7, 2002CNEAEXAMINERS AMENDMENT MAILED—
Jun 6, 2002DOCKASSIGNED TO EXAMINER—
May 23, 2002ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Feb 6, 2002CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 30, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 14, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 23, 2000CNSLLETTER OF SUSPENSION MAILED—
Aug 3, 2000CNEAEXAMINER'S AMENDMENT MAILED—
Jul 27, 2000CNSLLETTER OF SUSPENSION MAILED—
Jul 10, 2000CNEAEXAMINER'S AMENDMENT MAILED—
May 1, 2000CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 19, 2000CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 1999CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 28, 1999DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance