USPTO serial 75658304
LOGALUX
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 10, 2000
- Examiner
- SWITZER, SANDY
- Law office
- GENERIC WEB UPDATE
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with LOGALUX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
35576 Wetziar, DE
35576 Wetziar, DE
35576 Wetziar, DE
WETZLAR, DE
D-35576 WETZLAR, DE
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Thilo C. Agthe
Thilo C. Agthe Wuersch & Gering LLP100 Wall Street, 21st. FloorNew York, NY 10005UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | ELECTROCHEMICAL FUEL CELLS, SAFETY EQUIPMENT FOR HEATING DEVICES AND HEATING SYSTEMS, NAMELY, THERMOSTATS AND TEMPERATURE CONTROLLERS, HEAT-DISTRIBUTION REGULATORS AND CONTROLLERS, FLAME AND COMBUSTION MONITORS, EMISSION CONTROLLERS, BURNER CONTROLLERS, HYDRONIC CONTROLLERS, COMFORT CONTROLLERS, WATER-HEATER CONTROLLERS, REMOTE AND ON-SITE CONTROLLERS, SERVICE NEED INDICATORS, POWER REGULATORS AND CIRCULATOR AND PUMP CONTROLLERS FOR CENTRAL AND LOCAL SPACE HEATERS, HEAT EXCHANGERS, CONVECTORS, RADIATORS, CIRCULATORS, BOILERS, HOT WATER STORAGE, BURNERS AND SOLAR COLLECTORS | SECTION 8 - CANCELLED | — |
| 011 | HEATING DEVICES AND HEATING SYSTEMS CONSISTING OF FURNACE BOILERS, CONTINUOUS CIRCULATION WATER HEATERS, HOT WATER PREPARATION AND STORAGE EQUIPMENT, NAMELY, OIL AND GAS FIRED WATER HEATERS AS BOILERS AND CONTINUOUS CIRCULATION WATER HEATERS AND HOT WATER STORAGE EQUIPMENT, HEAT EXCHANGERS, ELECTRIC SURFACE HEATERS, STEAM AND ELECTRIC RADIATORS FOR HEATING BUILDINGS, HEAT PUMPS, CENTRAL HEATING PLANTS, HEAT STORAGE TANKS AND RADIATORS, HEAT EXCHANGERS, ELECTRIC SURFACE HEATERS, STEAM AND ELECTRIC RADIATORS FOR HEATING BUILDINGS, HEATING ELEMENTS FOR WALLS, CEILINGS AND FLOORS, NAMELY, RADIATORS, CONVECTORS, FLAT PLATE HEATERS, HEAT PUMPS, CLIMATE CONTROLLERS, VENTILATORS, CONNECTORS, PUMPS AND CIRCULATORS | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BUDERUS HEIZTECHNIK GMBH
- Other trademarks owned by BUDERUS HEIZTECHNIK GMBH
- Other trademarks owned by BUDERUS HEIZTECHNIK GMBH
- Other trademarks owned by BBT THERMOTECHNIK GMBH
- Other trademarks owned by BOSCH THERMOTECHNIK GMBH
- Other trademarks in Class 009
- Other trademarks in Class 011
- Similar marks named LOGALUX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 12, 2021 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Oct 10, 2019 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Aug 31, 2010 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Aug 31, 2010 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Aug 30, 2010 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Aug 6, 2008 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jul 16, 2007 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| May 23, 2007 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| May 21, 2007 | PR23 | RESPONSE RECEIVED TO POST REG. ACTION - SEC. 8 & 15 | — |
| May 21, 2007 | PAPER RECEIVED | — | |
| Dec 11, 2006 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Oct 10, 2006 | 815F | REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED | — |
| Oct 10, 2006 | PAPER RECEIVED | — | |
| Oct 5, 2006 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 5, 2006 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 25, 2006 | CFIT | CASE FILE IN TICRS | — |
| Oct 10, 2000 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 18, 2000 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 16, 2000 | NPUB | NOTICE OF PUBLICATION | — |
| Apr 24, 2000 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 25, 2000 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 3, 1999 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 26, 1999 | DOCK | ASSIGNED TO EXAMINER | — |