USPTO serial 75683039
JFC
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Apr 10, 2001
- Examiner
- SAITO, KIM
- Law office
- GENERIC WEB UPDATE
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with JFC?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
J. FLETCHER CREAMER & SON, INC.
HACKENSACK, NJ
J. FLETCHER CREAMER & SON, INC.
HACKENSACK, NJ
J. FLETCHER CREAMER & SON, INC.
HACKENSACK, NJ
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
LAWRENCE D MANDEL
LAWRENCE D MANDEL KLAUBER & JACKSON LLCCONTINENTAL PLAZA411 HACKENSACK AVE., 4TH FLOORHACKENSACK, NJ 07601Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | HEAVY CONSTRUCTION AND UTILITIES INSTALLATION, NAMELY ROCK BLASTING AND EXCAVATION; ROAD CONSTRUCTION; INSTALLATION AND REBUILDING OF MANHOLES; INSTALLATION OF WATER, SEWER, ELECTRIC, GAS AND COMMUNICATION LINES; DAM CONSTRUCTION; INSTALLATION OF COMMUNICATIONS ENVIRONMENTAL VAULTS; FIBER OPTIC CABLE INSTALLATION; CONSTRUCTION OF DRAINAGE AND RETENTION SYSTEMS; EXCAVATION, REMOVAL AND REPLACEMENT OF CONCRETE; PAVING PARKING AREAS AND ROADWAYS; POURING OF CONCRETE FOUNDATIONS; INSTALLATION OF LARGE DIAMETER PIPE; CONSTRUCTION OF PRECAST SOUND BARRIERS; PILE DRIVING FOR SUPPORT OF COMMERCIAL AND/OR RESIDENTIAL BUILDINGS; STEEL SHEETING IN SUPPORT OF EXCAVATIONS; MARINE CONSTRUCTION, NAMELY CONSTRUCTION OF BULKHEADS, PIERS AND COFFER DAMS; BRIDGE AND CULVERT CONSTRUCTION; GABION WALL CONSTRUCTION; BORING AND JACKING FOR ROADS AND RAILROAD CROSSINGS; DIKE REPAIR; ROCK SCALING; ENVIRONMENTAL REMEDIATION, NAMELY, REMOVAL OF UNDERGROUND STORAGE TANKS, CLEANING OF ABOVE GROUND TANKS AND SITE REMEDIATION; INSTALLATION OF SIGNS AND SIGN STRUCTURES; WATER AND SEWER MAIN REHABILITATION SERVICES; GUIDERAIL INSTALLATION | SECTION 8 - CANCELLED | Dec 31, 1935 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by J. FLETCHER CREAMER & SON, INC.
- Other trademarks owned by J. FLETCHER CREAMER & SON, INC.
- Other trademarks owned by J. FLETCHER CREAMER & SON, INC.
- Other trademarks in Class 037
- Similar marks named JFC
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 12, 2021 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Apr 10, 2020 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Apr 19, 2011 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Apr 19, 2011 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Apr 14, 2011 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 8, 2011 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| May 2, 2007 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Mar 12, 2007 | PR23 | RESPONSE RECEIVED TO POST REG. ACTION - SEC. 8 & 15 | — |
| Mar 12, 2007 | PAPER RECEIVED | — | |
| Nov 14, 2006 | CFIT | CASE FILE IN TICRS | — |
| Oct 5, 2006 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Jul 19, 2006 | 815F | REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED | — |
| Jul 19, 2006 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Apr 10, 2001 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 16, 2001 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 15, 2000 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 16, 2000 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 15, 2000 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 5, 2000 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 10, 2000 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 27, 1999 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 7, 1999 | DOCK | ASSIGNED TO EXAMINER | — |