Drawing for NOI

USPTO serial 75740816

NOI

Reviewed by CopyMark Law Group

Reg. 2588981Status 710
Filing date
Status date
Registration date
Jul 2, 2002
Examiner
STRASER, RICHARD
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with NOI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

ELIZABETH W. KING

ELIZABETH W KING CONLEY, ROSE & TAYON, PCP 0 BOX 3267HOUSTON, TX 77253-3267UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines for use in the production of oil and gas from wells and for the drilling of oil and gas wells, namely, derricks, drilling masts, off shore and on shore drilling rigs and work over rigs, machines that pump the oil and gas from the ground, and replacement parts therefor; machine tools, namely, blow out preventer handling systems comprised of lifting hoists and trolleys for operation on trolley beams; blow out preventer cranes; breakout machines; bumper subs; centrifugal pumps; coiled tubing equipment comprised of tubing hangers, tubing heads, work reels, hose reels, tubing reels, injector heads, injector head trolleys, control cabin and hydraulic power packs, carriers, trailers, masts, tubing grippers, lift chains, gripper blocks, block carriers, and pumps; machine parts, namely, chain links, cam rollers, level winds; cranes; crown blocks; deadline/wireline anchors; derricks; de-sanders; de-silters; dies and inserts; disc brakes for draw-works; down-hole motors; draw-works, namely, hoists; drilling jars; mud hoppers; mud guns; nitrogen pumping equipment comprised of pumps, carriers, and cryogenic pumps; pistons for slush pumps and well services pumps; platform rigs; plunger pumps; power swivels; reamers; rotary tables; safety valves; self propelled rigs; shakers; sheaves; shock tools used to isolate the oilfield drill string, namely, barrels, mandrels, spline drives, pistons, springs, and seals; skidding systems comprised of lift and roll components used to lift and roll the machines used to produce oil and gas from wells, rig jacks, claw and grippers; slips for drill pipes; drill collars, casing, and tubing; slurry pumps; slush pumps and mud pumps; solids controls equipment comprised of shale shakers, mud cleaners, de-grassers, de-silters, cones, mud agitators, mud hoppers, mud guns, mud mixers, shear relief valves, reset relief valves, float valves, and gate valves; spiders; stabilizers; substructures; swivels; machine parts, namely, rotary tongs; torque converters for machines; trailerized rigs; traveling blocks; slush pump valve seats; slush pumps; plunger pumps; well service pumps; machine parts, namely, wash pipes; well services pumps; winches; windlass, all being machines and machine tools for use in the production of oil and gas from wells and for the drilling of oil and gas wellsSECTION 8 - CANCELLEDJan 1, 1999
009SCR systems, namely, silicone control rectifier electrical units for converting AC to DC for drilling rigsSECTION 8 - CANCELLEDJan 1, 1999

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 4, 2009C8..CANCELLED SEC. 8 (6-YR)
Nov 21, 2007CFITCASE FILE IN TICRS
Jul 2, 2002R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 5, 2002CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Mar 5, 2002DOCKASSIGNED TO EXAMINER
Mar 1, 2002SUPCSTATEMENT OF USE PROCESSING COMPLETE
Feb 6, 2002IUAFUSE AMENDMENT FILED
Aug 7, 2001NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 15, 2001PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 2, 2001NPUBNOTICE OF PUBLICATION
Feb 26, 2001CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Feb 14, 2001CNEAEXAMINER'S AMENDMENT MAILED
Jan 26, 2001JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY
Jan 26, 2001EXPIEX PARTE APPEAL-INSTITUTED
Jun 21, 2000CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 10, 2000CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 8, 1999CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 6, 1999DOCKASSIGNED TO EXAMINER
Oct 6, 1999DOCKASSIGNED TO EXAMINER

Frequently asked questions

Related guidance