USPTO serial 75838701
BG TECHNOLOGY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 5, 2002
- Examiner
- FICKES, JERI J
- Law office
- SCANNING ON DEMAND
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with BG TECHNOLOGY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Reading, Berkshire RG6 1PT, GB
Reading, Berkshire RG6 1PT, GB
Reading, Berkshire RG6 1PT, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John M. Rannells
John M. Rannells Baker and Rannells PA575 Route 28Raritan, NJ 08869UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 041 | EDUCATIONAL SERVICES IN THE NATURE OF WORKSHOPS, SEMINARS, AND CLASSES IN THE FIELDS OF EXPLORATION TECHNOLOGIES, DRILLING AND WELL COMPLETIONS, GAS TO LIQUIDS AND SOLIDS, GEOSCIENCE, RESERVOIR ENGINEERING, OFFSHORE PRODUCTION TECHNOLOGIES, GAS STORAGE, TRANSPORTATION AND LIQUEFACTION, SERVICING AND FAULT DIAGNOSTICS ON HEATING SYSTEMS AND APPLIANCES, DESIGN OF DISTRIBUTED DATABASES TO FACILITATE CAPTURE AND INTELLIGENT RETRIEVAL OF INFORMATION, THE ANALYSIS OF PIPELINE STRUCTURES, TO THE MANAGEMENT OF LOADS CARRIED BY PIPELINES AND THE PRESSURE WITH WHICH SUCH LOADS ARE CARRIED, TO THE MEASUREMENT OF THE CALORIFIC VALUE OF GAS, TO THE CALIBRATION OF GAS COMPOSITION MONITORS AND ANALYZERS, TO THE METERING OF GAS, TO THE CALIBRATION OF GAS METERS AND THE IMPLEMENTATION OF GAS METERING, TO PROCESS ENGINEERING, TO THE PRODUCTION OF FLOWSHEETS AND SIMULATIONS RELATING TO SUCH PROCESS ENGINEERING, TO THE DESIGN AND OPERATION OF PLANTS FOR THE DEHYDRATION, DEW-POINT CONTROL OF GAS AND FOR CARBON DIOXIDE AND SULPHUR REMOVAL FROM GAS, TO THE TESTING OF CLIENT PRODUCTS FOR CONFORMITY TO UK, EUROPEAN AND INTERNATIONAL STANDARDS, TO AIR EMISSION MODELLING AND MONITORING, TO THE EXTENT OF CONTAMINATION IN LAND, TO THE USAGE AND EFFICIENCY OF USAGE OF ENERGY IN THE HOME, TO THE DESIGN OF HEATING SYSTEMS, BURNERS FOR BOILERS, FIRES AND COOKERS, TO THE FORMULATION OF SAFETY PROCEDURES FOR THE USE OF GAS ON DOMESTIC PREMISES, TO THE MONITORING AND MODELLING OF THE COMPOSITION AND LEVEL OF EXTERNAL GASEOUS EMISSIONS, TO THE QUALITY ASSURANCE OF DOMESTIC ENERGY-USING APPLIANCES, TO FEASIBILITY STUDIES FOR THE USE OF, FIELD TRIALS OF, DEMONSTRATIONS, DESIGN, CONTROL OF OPERATION, DEVELOPMENT, MONITORING, CONTROL, PERFORMANCE EVALUATION, INTEGRATION AND EFFICIENCY MAXIMIZATION AND FAULT CORRECTION OF COOLING EQUIPMENT, HEATING EQUIPMENT, COMBINED HEAT AND POWER SYSTEMS, DEHUMIDIFIERS, AND GAS ENGINES, TO COMPUTER SIMULATIONS OF ENERGY LOSSES FROM BUILDINGS, TO THE ENERGY AUDITING AND MONITORING OF BUILDINGS AND TO THE TARGET SETTING OF ENERGY USAGE OF RECUPERATIVE AND REGENERATIVE BURNERS, HOT WATER BOILERS, STEAM GENERATION BOILERS, KILNS, METAL MELTING FURNACES, COMBUSTION PROCESSES INVOLVING GAS AND OXYGEN, CONVERSION OF UTILITY BOILERS TO DUAL-FUEL SUPPLIES, REBURN TECHNIQUES IN WATER TUBE UTILITY BOILERS, TO THE DEVELOPMENT AND PERFORMANCE TESTING OF ENGINES, ENGINE DURABILITY, ENGINE EXHAUST EMISSIONS, TESTING VEHICLES FOR PERFORMANCE, FUEL CONSUMPTION AND EXHAUST EMISSION, DESIGN OF NATURAL GAS DRIVEN ENGINES, TO THE ASSESSMENT OF RISKS AND HAZARDS IN THE USE OF FUEL GAS, TO THE PREDICTION AND EXPERIMENTAL MEASUREMENT OF GAS DISPERSION, GAS BUILD-UP, FIRE AND EXPLOSION AND STRUCTURAL RESPONSE, TO THE STUDY OF OCCUPATIONAL HYGIENE, TO GEOTECHNICAL ENGINEERING AND HIGH PRESSURE MATERIALS, TO ENGINEERING MATERIALS RELATING TO CORROSION PROTECTION, TO PIPELINE INSPECTION TECHNOLOGIES, TO MARKET INFORMATION, SURVEYS AND POTENTIAL FOR NEW TECHNOLOGIES; TO GAS TRANSMISSION AND DISTRIBUTION, TO THE INSTALLATION OF HEATING EQUIPMENT INCLUDING BURNERS FOR BOILERS, FIRES AND COOKERS, TO THE PRODUCTION OF ODORIFICATION IN GASES | SECTION 8 - CANCELLED | — |
| 042 | CONSULTING SERVICES RELATING TO THE INSTALLATION OF HEATING EQUIPMENT INCLUDING BURNERS FOR BOILERS, FIRES AND COOKERS; CONSULTING SERVICES RELATING TO GAS TRANSMISSION AND DISTRIBUTION; CONSULTING SERVICES RELATING TO THE PRODUCTION OF ODORIFICATION IN GASES; CONSULTING, RESEARCH AND DEVELOPMENT SERVICES, ALL RELATING TO EXPLORATION TECHNOLOGIES, DRILLING AND WELL COMPLETIONS, GAS TO LIQUIDS AND SOLIDS, GEOSCIENCE, RESERVOIR ENGINEERING, OFFSHORE PRODUCTION TECHNOLOGIES, GAS STORAGE, TRANSPORTATION AND LIQUEFACTION, SERVICING AND FAULT DIAGNOSTICS ON HEATING SYSTEMS AND APPLIANCES, DESIGN OF DISTRIBUTED DATABASES TO FACILITATE CAPTURE AND INTELLIGENT RETRIEVAL OF INFORMATION; CONSULTANCY SERVICES RELATING TO THE ANALYSIS OF PIPELINE STRUCTURES, THE MANAGEMENT OF LOADS CARRIED BY PIPELINES AND THE PRESSURE WITH WHICH SUCH LOADS ARE CARRIED, TO THE MEASUREMENT OF THE CALORIFIC VALUE OF GAS, THE CALIBRATION OF GAS COMPOSITION MONITORS AND ANALYZERS, TO THE METERING OF GAS, TO THE CALIBRATION OF GAS METERS AND THE IMPLEMENTATION OF GAS METERING, TO PROCESS ENGINEERING, TO THE PRODUCTION OF FLOWSHEETS AND SIMULATIONS RELATING TO SUCH PROCESS ENGINEERING, TO THE DESIGN AND OPERATION OF PLANT FOR THE DEHYDRATION, DEW-POINT CONTROL OF GAS AND FOR CARBON DIOXIDE AND SULPHUR REMOVAL FROM GAS, TO THE TESTING OF CLIENT PRODUCTS FOR CONFORMITY TO UK, EUROPEAN AND INTERNATIONAL STANDARDS, TO AIR EMISSION MODELLING AND MONITORING, TO THE EXTENT OF CONTAMINATION IN LAND, TO THE USAGE AND EFFICIENCY OF USAGE OF ENERGY IN THE HOME, TO THE DESIGN OF HEATING SYSTEMS, BURNERS FOR BOILERS, FIRES AND COOKERS, TO THE FORMULATION OF SAFETY PROCEDURES FOR THE USE OF GAS ON DOMESTIC PREMISES, TO THE MONITORING AND MODELLING OF THE COMPOSITION AND LEVEL OF EXTERNAL GASEOUS EMISSIONS, TO THE QUALITY ASSURANCE OF DOMESTIC ENERGY-USING APPLIANCES, TO FEASIBILITY STUDIES FOR THE USE OF, FIELD TRIALS OF, DEMONSTRATIONS, DESIGN, CONTROL OF OPERATION, DEVELOPMENT, MONITORING, CONTROL, PERFORMANCE EVALUATION, INTEGRATION AND EFFICIENCY MAXIMIZATION AND FAULT CORRECTION OF COOLING EQUIPMENT, HEATING EQUIPMENT, COMBINED HEAT AND POWER SYSTEMS, DEHUMIDIFIERS, AND GAS ENGINES, TO COMPUTER SIMULATIONS OF ENERGY LOSSES FROM BUILDINGS, TO THE ENERGY AUDITING AND MONITORING OF BUILDINGS AND TO THE TARGET SETTING OF ENERGY USAGE OF RECUPERATIVE AND REGENERATIVE BURNERS, HOT WATER BOILERS, STEAM GENERATION BOILERS, KILNS, METAL MELTING FURNACES, COMBUSTION PROCESSES INVOLVING GAS AND OXYGEN, CONVERSION OF UTILITY BOILERS TO DUAL-FUEL SUPPLIES, REBURN TECHNIQUES IN WATER TUBE UTILITY BOILERS, TO THE DEVELOPMENT AND PERFORMANCE TESTING OF ENGINES, ENGINE DURABILITY, ENGINE EXHAUST EMISSIONS, TESTING VEHICLES FOR PERFORMANCE, FUEL CONSUMPTION AND EXHAUST EMISSION, DESIGN OF NATURAL GAS DRIVEN ENGINES, THE ASSESSMENT OF RISKS AND HAZARDS IN THE USE OF FUEL GAS, TO THE PREDICTION AND EXPERIMENTAL MEASUREMENT OF GAS DISPERSION, GAS BUILD-UP, FIRE AND EXPLOSION AND STTUCTURAL RESPONSE, TO THE STUDY OF OCCUPATIONAL HYGIENE, TO GEOTECHNICAL ENGINEERING AND HIGH PRESSURE MATERIALS, TO ENGINEERING MATERIALS RELATING TO CORROSION PROTECTION, TO PIPELINE INSPECTION TECHNOLOGIES, TO MARKET INFORMATION, SURVEYS AND POTENTIAL FOR NET TECHNOLOGIES | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 13, 2008 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| May 7, 2008 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 7, 2008 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 23, 2007 | CFIT | CASE FILE IN TICRS | — |
| Mar 5, 2002 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 11, 2001 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 21, 2001 | NPUB | NOTICE OF PUBLICATION | — |
| May 8, 2001 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 4, 2001 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Nov 29, 2000 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 8, 2000 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 11, 2000 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 10, 2000 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 21, 2000 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 19, 2000 | DOCK | ASSIGNED TO EXAMINER | — |