Drawing for BG TECHNOLOGY

USPTO serial 75838704

BG TECHNOLOGY

Reviewed by CopyMark Law Group

Reg. 2508702Status 710
Filing date
Status date
Registration date
Nov 20, 2001
Examiner
FICKES, JERI J
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with BG TECHNOLOGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

WILLIAM H HOLT

WILLIAM H HOLT LAW OFFICE OF WILLIAM H HOLT1423 POWHATAN ST UNIT 2, FIRST FLALEXANDRIA, VA 22314UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
041EDUCATIONAL SERVICES IN THE NATURE OF WORKSHOPS, SEMINARS, AND CLASSES IN THE FIELDS OF EXPLORATION TECHNOLOGIES, DRILLING AND WELL COMPLETIONS, GAS TO LIQUIDS AND SOLIDS, GEOSCIENCE, RESERVOIR ENGINEERING, OFFSHORE PRODUCTION TECHNOLOGIES, GAS STORAGE, TRANSPORTATION AND LIQUEFACTION, SERVICING AND FAULT DIAGNOSTICS ON HEATING SYSTEMS AND APPLIANCES, DESIGN OF DISTRIBUTED DATABASES TO FACILITATE CAPTURE AND INTELLIGENT RETRIEVAL OF INFORMATION, THE ANALYSIS OF PIPELINE STRUCTURES, TO THE MANAGEMENT OF LOADS CARRIED BY PIPELINES AND THE PRESSURE WITH WHICH SUCH LOADS ARE CARRIED, TO THE MEASUREMENT OF THE CALORIFIC VALUE OF GAS, TO THE CALIBRATION OF GAS COMPOSITION MONITORS AND ANALYZERS, TO THE METERING OF GAS, TO THE CALIBRATION OF GAS METERS AND THE IMPLEMENTATION OF GAS METERING, TO PROCESS ENGINEERING, TO THE PRODUCTION OF FLOWSHEETS AND SIMULATIONS RELATING TO SUCH PROCESS ENGINEERING, TO THE DESIGN AND OPERATION OF PLANT FOR THE DEHYDRATION, DEW-POINT CONTROL OF GAS AND FOR CARBON DIOXIDE AND SULPHUR REMOVAL FROM GAS, TO THE TESTING OF CLIENT PRODUCTS FOR CONFORMITY TO UK, European AND INTERNATIONAL STANDARDS, TO AIR EMISSION MODELLING AND MONITORING, TO THE EXTENT OF CONTAMINATION IN LAND, TO THE USAGE AND EFFICIENCY OF USAGE OF ENERGY IN THE HOME, TO THE DESIGN OF HEATING SYSTEMS, BURNERS FOR BOILERS, FIRES AND COOKERS, TO THE FORMULATION OF SAFETY PROCEDURES FOR THE USE OF GAS ON DOMESTIC PREMISES, TO THE MONITORING AND MODELLING OF THE COMPOSITION AND LEVEL OF EXTERNAL GASEOUS EMISSIONS, TO THE QUALITY ASSURANCE OF DOMESTIC ENERGY-USING APPLIANCES, TO FEASIBILITY STUDIES FOR THE USE OF, FIELD TRIALS OF, DEMONSTRATIONS, DESIGN, CONTROL OF OPERATION, DEVELOPMENT, MONITORING, CONTROL, PERFORMANCE EVALUATION, INTEGRATION AND EFFICIENCY MAXIMIZATION AND FAULT CORRECTION OF COOLING EQUIPMENT, HEATING EQUIPMENT, COMBINED HEAT AND POWER SYSTEMS, DEHUMIDIFIERS, AND GAS ENGINES, TO COMPUTER SIMULATIONS OF ENERGY LOSSES FROM BUILDINGS, TO THE ENERGY AUDITING AND MONITORING OF BUILDINGS AND TO THE TARGET SETTING OF ENERGY USAGE OF RECUPERATIVE AND REGENERATIVE BURNERS, HOT WATER BOILERS, STEAM GENERATION BOILERS, KILNS, METAL MELTING FURNACES, COMBUSTION PROCESSES INVOLVING GAS AND OXYGEN, CONVERSION OF UTILITY BOILERS TO DUAL-FUEL SUPPLIES, REBURN TECHNIQUES IN WATER TUBE UTILITY BOILERS, TO THE DEVELOPMENT AND PERFORMANCE TESTING OF ENGINES, ENGINE DURABILITY, ENGINE EXHAUST EMISSIONS, TESTING VEHICLES FOR PERFORMANCE, FUEL CONSUMPTION AND EXHAUST EMISSION, DESIGN OF NATURAL GAS DRIVEN ENGINES, TO THE ASSESSMENT OF RISKS AND HAZARDS IN THE USE OF FUEL GAS, TO THE PREDICTION AND EXPERIMENTAL MEASUREMENT OF GAS DISPERSION, GAS BUILD-UP, FIRE AND EXPLOSION AND STRUCTURAL RESPONSE, TO THE STUDY OF OCCUPATIONAL HYGIENE, TO GEOTECHNICAL ENGINEERING AND HIGH PRESSURE MATERIALS, TO ENGINEERING MATERIALS RELATING TO CORROSION PROTECTION, TO PIPELINE INSPECTION TECHNOLOGIES, TO MARKET INFORMATION, SURVEYS AND POTENTIAL FOR NEW TECHNOLOGIES; TO GAS TRANSMISSION AND DISTRIBUTION, TO THE INSTALLATION OF HEATING EQUIPMENT INCLUDING BURNERS FOR BOILERS, FIRES AND COOKERS, TO THE PRODUCTION OF ORDORIFICATION IN GASESSECTION 8 - CANCELLED—
042CONSULTING SERVICES RELATING TO THE INSTALLATION OF HEATING EQUIPMENT INCLUDING BURNERS FOR BOILERS, FIRES AND COOKERS; CONSULTING SERVICES RELATING TO GAS TRANSMISSION AND DISTRIBUTION; CONSULTING SERVICES RELATING TO THE PRODUCTION OF ODORIFICATION IN GASES; CONSULTING, RESEARCH AND DEVELOPMENT SERVICES, ALL RELATING TO EXPLORATION TECHNOLOGIES, DRILLING AND WELL COMPLETIONS, GAS TO LIQUIDS AND SOLIDS, GEOSCIENCE, RESERVOIR ENGINEERING, OFFSHORE PRODUCTION TECHNOLOGIES, GAS STORAGE, TRANSPORTATION AND LIQUEFACTION, SERVICING AND FAULT DIAGNOSTICS ON HEATING SYSTEMS AND APPLIANCES, DESIGN OF DISTRIBUTED DATABASES TO FACILITATE CAPTURE AND INTELLIGENT RETRIEVAL OF INFORMATION; CONSULTANCY SERVICES RELATING TO THE ANALYSIS OF PIPELINE STRUCTURES, THE MANAGEMENT OF LOADS CARRIED BY PIPELINES AND THE PRESSURE WITH WHICH SUCH LOADS ARE CARRIED, TO THE MEASUREMENT OF THE CALORIFIC VALUE OF GAS, THE CALIBRATION OF GAS COMPOSITION MONITORS AND ANALYZERS, TO THE METERING OF GAS, TO THE CALIBRATION OF GAS METERS AND THE IMPLEMENTATION OF GAS METERING, TO PROCESS ENGINEERING, TO THE PRODUCTION OF FLOWSHEETS AND SIMULATIONS RELATING TO SUCH PROCESS ENGINEERING, TO THE DESIGN AND OPERATION OF PLANT FOR THE DEHYDRATION, DEW-POINT CONTROL OF GAS AND FOR CARBON DIOXIDE AND SULPHUR REMOVAL FROM GAS, TO THE TESTING OF CLIENT PRODUCTS FOR CONFORMITY TO UK, EUROPEAN AND INTERNATIONAL STANDARDS, TO AIR EMISSION MODELLING AND MONITORING, TO THE EXTENT OF CONTAMINATION IN LAND, TO THE USAGE AND EFFICIENCY OF USAGE OF ENERGY IN THE HOME, TO THE DESIGN OF HEATING SYSTEMS, BURNERS FOR BOILERS, FIRES AND COOKERS, TO THE FORMULATION OF SAFETY PROCEDURES FOR THE USE OF GAS ON DOMESTIC PREMISES, TO THE MONITORING AND MODELLING OF THE COMPOSITION AND LEVEL OF EXTERNAL GASEOUS EMISSIONS, TO THE QUALITY ASSURANCE OF DOMESTIC ENERGY-USING APPLIANCES, TO FEASIBILITY STUDIES FOR THE USE OF, FIELD TRIALS OF, DEMONSTRATIONS, DESIGN, CONTROL OF OPERATION, DEVELOPMENT, MONITORING, CONTROL, PERFORMANCE EVALUATION, INTEGRATION AND EFFICIENCY MAXIMIZATION AND FAULT CORRECTION OF COOLING EQUIPMENT, HEATING EQUIPMENT, COMBINED HEAT AND POWER SYSTEMS, DEHUMIDIFIERS, AND GAS ENGINES, TO COMPUTER SIMULATIONS OF ENERGY LOSSES FROM BUILDINGS, TO THE ENERGY AUDITING AND MONITORING OF BUILDINGS AND TO THE TARGET SETTING OF ENERGY USAGE OF RECUPERATIVE AND REGENERATIVE BURNERS, HOT WATER BOILERS, STEAM GENERATION BOILERS, KILNS, METAL MELTING FURNACES, COMBUSTION PROCESSES INVOLVING GAS AND OXYGEN, CONVERSION OF UTILITY BOILERS TO DUAL-FUEL SUPPLIES, REBURN TECHNIQUES IN WATER TUBE UTILITY BOILERS, TO THE DEVELOPMENT AND PERFORMANCE TESTING OF ENGINES, ENGINE DURABILITY, ENGINE EXHAUST EMISSIONS, TESTING VEHICLES FOR PERFORMANCE, FUEL CONSUMPTION AND EXHAUST EMISSION, DESIGN OF NATURAL GAS DRIVEN ENGINES, THE ASSESSMENT OF RISKS AND HAZARDS IN THE USE OF FUEL GAS, TO THE PREDICTION AND EXPERIMENTAL MEASUREMENT OF GAS DISPERSION, GAS BUILD-UP, FIRE AND EXPLOSION AND STTUCTURAL RESPONSE, TO THE STUDY OF OCCUPATIONAL HYGIENE, TO GEOTECHNICAL ENGINEERING AND HIGH PRESSURE MATERIALS, TO ENGINEERING MATERIALS RELATING TO CORROSION PROTECTION, TO PIPELINE INSPECTION TECHNOLOGIES, TO MARKET INFORMATION, SURVEYS AND POTENTIAL FOR NEW TECHNOLOGIESSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 22, 2008C8..CANCELLED SEC. 8 (6-YR)—
Jan 10, 2007CFITCASE FILE IN TICRS—
Nov 20, 2001R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 28, 2001PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 8, 2001NPUBNOTICE OF PUBLICATION—
Mar 6, 2001CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 4, 2001CNSLLETTER OF SUSPENSION MAILED—
Nov 29, 2000CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 8, 2000CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 11, 2000CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 2000DOCKASSIGNED TO EXAMINER—
Apr 21, 2000DOCKASSIGNED TO EXAMINER—
Apr 19, 2000DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance