Drawing for MLPC

USPTO serial 75905903

MLPC

Reviewed by CopyMark Law Group

Reg. 2629807Status 800Registered
Filing date
Status date
Registration date
Oct 8, 2002
Examiner
BOULTON, KELLY F
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with MLPC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dennis S. Prahl

Dennis S. Prahl Ladas & Parry LLP1040 Avenue of the AmericasNEW YORK, NY 10018-3738UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007PAVING MACHINES, NAMELY, VIBRATORY COMPACTORS FOR PAVING; EARTH COMPACTING MACHINES; CONCRETE MIXERS; CORE DRILLING MACHINES FOR CONCRETE AND ASPHALT; DRILLING MACHINES AND PARTS THEREFOR; ELECTRIC HAND-HELD DRILLS; PILE DRIVERS; TAMPERS FOR COMPACTING LOOSE SOILSACTIVE—
009APPARATUS IN THE FIELD OF ROAD MAINTENANCE, namely, COMPUTER HARDWARE, COMPUTER SOFTWARE, ELECTRONIC SENSORS AND CAMERAS FOR CHECKING, MAINTAINING, CONTROLLING AND PROBING PAVEMENT, FOR ASSESSING MAINTENANCE AND RE-ENFORCEMENT REQUIREMENTS FOR ROAD NETWORKS, BRIDGES, STRUCTURES AND TRANSPORTATION INFRASTRUCTURES, FOR THE REPRODUCTION OF DATA IN THE FORM OF FILM, VIDEO TAPE, AND COMPUTER FILES, AND FOR THE CREATION OF ROAD DIAGRAMS; ELECTRONIC DATABASE IN THE FIELD OF ROAD INFRASTRUCTURES RECORDED ON CDROM; MEASURING BENCHES, namely, LASERS FOR MEASURING PURPOSES AND POCKET CALIPERS FOR MEASURING; MEASURING AND TESTING MACHINES FOR ROADS AND MATERIALS FOR PAVING ROADS AND FOR BUILDING STRUCTURES, namely, MATERIALS TESTING MACHINES FOR TESTING SAMPLES OF ASPHALT AND CONCRETE; CONCRETE FLOW METERS; TEMPERATURE CONTROLS FOR CLIMATE CONTROL AND DRYING OVEN UNITS; PRESSURE SENSORS [ ; GAMMA DENSITOMETERS, namely, DEVICES TO MEASURE THE DENSITY OF ROAD BASES ]ACTIVE—
020WORK BENCHES; WORK BENCHES FOR MEASURINGACTIVE—
042[ ENGINEERING SERVICES, NAMELY, STUDYING, MEASURING, ANALYZING, CONTROLLING, CONDUCTING RESEARCH AND PERFORMING TECHNICAL AND SCIENTIFIC ESTIMATES RELATED TO THE USE OF PAVEMENTS, ROAD NETWORKS, BRIDGES AND TRANSPORT INFRASTRUCTURES; COMPUTER SERVICES, NAMELY, CREATING, MAINTAINING AND PROVIDING ON-LINE DATABASES CONTAINING DATA AND INFORMATION IN REAL OR DEFERRED TIME ON THE STATE OF ROADS, ROAD NETWORKS, BRIDGES, STRUCTURES AND TRANSPORT INFRASTRUCTURES VIA A GLOBAL COMPUTER NETWORK; MATERIAL TESTING; ENGINEERING; COMPUTER PROGRAMMING SERVICES FOR OTHERS; DESIGNING AND UPDATING COMPUTER SOFTWARE FOR OTHERS IN THE FIELD OF ROAD NETWORKS, BRIDGES, STRUCTURES AND TRANSPORT INFRASTRUCTURES; LEASING TIME TO AN INTERACTIVE COMPUTER DATABASE IN THE FIELDS OF ROADS, ROAD NETWORKS, BRIDGES, STRUCTURES AND TRANSPORT INFRASTRUCTURES ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 18, 2023NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jul 17, 2023RNL2REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jul 17, 202389AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jul 14, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Apr 5, 2023PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Apr 5, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 11, 2023ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Sep 26, 2022E89RTEAS SECTION 8 & 9 RECEIVED—
Oct 8, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Dec 29, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 16, 2012NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Oct 16, 2012RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Oct 16, 201289AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Oct 15, 2012APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 27, 2012E89RTEAS SECTION 8 & 9 RECEIVED—
Aug 15, 2012ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Aug 8, 2012ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 21, 2008MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
May 7, 2008C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Apr 22, 2008PLGLASSIGNED TO PARALEGAL—
Apr 8, 2008815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Apr 8, 2008MAILPAPER RECEIVED—
Jan 29, 2008CFITCASE FILE IN TICRS—
Oct 8, 2002R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 16, 2002PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 26, 2002NPUBNOTICE OF PUBLICATION—
Apr 5, 2002CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 1, 2002CNEAEXAMINERS AMENDMENT MAILED—
Nov 29, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 18, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 19, 2001CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 12, 2000CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 12, 2000CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 31, 2000DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance