Drawing for TSK

USPTO serial 75936012

TSK

Reviewed by CopyMark Law Group

Reg. 2814426Status 710
Filing date
Status date
Registration date
Feb 17, 2004
Examiner
ALT, JILL
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with TSK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

WILLIAM L. ANDROLIA

WILLIAM L ANDROLIA KODA & ANDROLIA2029 CENTURY PARK E STE 3850LOS ANGELES, CA 90067-2901UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Liquid storage tanks of metal; Industrial water tanks of metal; Liquefied gas storage trunks of metal; Gas storage tanks of metal; and Aluminum floating inner lids for gas storage tanks of metal or for liquefied gas storage tanks of metalSECTION 8 - CANCELLED—
007Textile machines, namely chemical fiber drying machines, hot air driers for textile manufacture and rotary presses for textile; pulp, paper or paper converting machines and structural parts thereof; plows and structural parts thereof (excluding those corresponding to hand tools); cultivators and structural parts thereof; harvesters and structural parts thereof; feed cutters; feed mixers; feed mills; glass working machines; plastic processing machines, namely plastic compression molding machines, injection molding machine, extrusion molding machines and plastic molds; semiconductor manufacturing machines, namely plasma polymerization devices, ion plating devices and multi spattering devices; stone engraving machines; machines which process sludge and ash into crystallized stone materials and machines which process crystallized stone materials into tiles; motive power machines and structural parts thereof, namely non-electric prime moves, not for land vehicles, namely internal combustion engines, jet engines, turbines and compressed air engines; centrifugal pumps, vacuum pumps and centrifugal blowers; and adhesive tape dispensersSECTION 8 - CANCELLED—
009ARC-WELDERS; ELECTRIC ARC CUTTERS; ELECTRIC WELDERS; ION GENERATORS; BATTERIES; AND PROTECTIVE HELMETSSECTION 8 - CANCELLED—
011Driers for drying wet organic or inorganic materials; industrial heat regenerators industrial evaporators; industrial distillaters; industrial heat exchangers; industrial furnaces and kilns; nuclear reactors; feed desiccators; waste water purifying tanks; sewage disposal tanks; garbage incinerators for business use; and water purifiers for commercial, domestic and industrial useSECTION 8 - CANCELLED—
020NON-METAL STORAGE TANKS FOR LIQUIDS; NON-METAL WATER TANKS FOR INDUSTRIAL PURPOSES; NON-METAL LIQUEFIED GAS STORAGE TANKS; AND NON-METAL GAS STORAGE TANKS, EXCLUDING METAL OR STONE TANKSSECTION 8 - CANCELLED—
037INSTALLATION OF PLUMBING, DRINKING WATER TREATMENT PLANTS, WASTE WATER TREATMENT PLANTS, SLUDGE TREATMENT PLANTS, FLUE GAS PURIFICATION PLANTS, ELECTRIC WIRING, ELECTRIC INSTRUMENTS, LIGHT FIXTURES, COMMUNICATION EQUIPMENT AND INDUSTRIAL SENSORS AND PROCESS CONTROLLERS; REPAIRING OR MAINTENANCE OF FLUE GAS PURIFICATION PLANTS, DEODORIZATION PLANTS OR AIR PURIFICATION PLANTS FOR AIR POLLUTION CONTROL; REPAIRING AND MAINTENANCE OF DRINKING WATER TREATMENT PLANTS, SEWAGE TREATMENT PLANTS, TREATMENT PLANTS FOR WASTE FROM A CESSPOOL AND PRIVY, INDUSTRIAL WASTE WATER TREATMENT PLANTS, OR SLUDGE TREATMENT PLANTS FOR WATER QUALITY POLLUTION CONTROL; REPAIRING OR MAINTENANCE OF INDUSTRIAL WASTE TREATMENT PLANTS, OR RECYCLING PLANT TO RECOVER USEFUL MATERIALS FROM WASTE; AND REPAIRING OR MAINTENANCE OF NOISE CONTROL EQUIPMENT OF HIGH-SPEED ROTATING MACHINESSECTION 8 - CANCELLED—
042Design services, namely providing industrial designs, architectural designs and computer software design for others; providing technical research and consultation in the field of pollution controlSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 24, 2010C8..CANCELLED SEC. 8 (6-YR)—
Jun 6, 2007CFITCASE FILE IN TICRS—
Feb 17, 2004R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 22, 2003IUCNNOTICE OF ALLOWANCE CANCELLED—
Dec 18, 2003FAXXFAX RECEIVED—
Aug 15, 20031.BDSec. 1(B) CLAIM DELETED—
Jul 29, 2003NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 2, 2002ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Jun 25, 2002PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 5, 2002NPUBNOTICE OF PUBLICATION—
Jan 10, 2002CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 12, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 16, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 3, 2000CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 28, 2000DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance