Drawing for UNAXIS

USPTO serial 75941656

UNAXIS

Reviewed by CopyMark Law Group

Reg. 2647893Status 710
Filing date
Status date
Registration date
Nov 12, 2002
Examiner
SNAPP, TINA LOUISE
Law office
SCANNING ON DEMAND

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with UNAXIS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

SHERIDAN NEIMARK

SHERIDAN NEIMARK BROWDY AND NEIMARKSTE 300419 SEVENTH ST N WWASHINGTON, DC 20004

Goods and services

ClassDescriptionStatusFirst use
001CHEMICALS, NAMELY, DIELECTRIC ELEMENTS AND COMPOUNDS FOR USE IN THE MANUFACTURE OF THIN LAYERS OF NON-CONDUCTING MATERIALSSECTION 8 - CANCELLED—
006WROUGHT AND UNWROUGHT NON-PRECIOUS METALS AND THEIR ALLOYS IN THE FORM OF BARS, BILLETS, RODS, AND SHEETS FOR GENERAL MANUFACTURING USESECTION 8 - CANCELLED—
007MACHINE AND MACHINE TOOLS, NAMELY, VACUUM INSTALLATIONS FOR COATING, ETCHING AND THERMAL TREATMENT OF DATA STORAGE MEDIA, ELECTRONIC COMPONENTS AND SCREENS; COMPONENTS AND SPARE PARTS FOR VACUUM COATING INSTALLATIONS, NAMELY, VACUUM PIPEWORK, VACUUM PASSAGES, VACUUM VALVES, MECHANICAL VACUUM CONTROLS AND CARRIERS FOR HANDLING AND STORING OF SEMICONDUCTOR SUBSTRATESSECTION 8 - CANCELLED—
009COMPONENTS AND SPARE PARTS FOR VACUUM DEPOSITION INSTALLATIONS, NAMELY, ELECTRONIC CONTROL AND POWER REGULATING SWITCHES; APPARATUS FOR MEASURING TOTAL PRESSURE IN VACUUM INSTALLATIONS, NAMELY, TOTAL PRESSURE SENSORS, MEASURING METERS, AND ELECTRONIC CONTROL CONNECTORS; PARTIAL PRESSURE MEASURING MONITORS AND SENSORS FOR VACUUM INSTALLATIONS; GAS CHROMATOGRAPHY APPARATUS FOR DETERMINING THE GAS COMPOSITION AT LOW AND HIGH PRESSURES; ELECTRONIC LEAK DETECTORS FOR DETECTING LEAKS IN VACUUM CONTAINERS AND AIRTIGHT CONTAINERS; ELECTRONIC CHIP CARRIER CLEANERS FOR CLEANING THE SURFACE OF ELECTRONIC COMPONENTS; ULTRASONIC CLEANING DEVICES FOR SUBSTRATES TO BE COATED IN A VACUUM INSTALLATION; AND LABORATORY OR FABRICATION EQUIPMENT, NAMELY, SPUTTER CATHODES, SPUTTER TARGETS, SPUTTER SCREENS, SPUTTER MASKS, VAPOR FILAMENTS, EVAPORATION BOATS, CERAMIC CRUCIBLES, AND QUARTZ CRYSTALSSECTION 8 - CANCELLED—
037INSTALLATION OF OPERATING MACHINERY USED IN VACUUM INSTALLATIONS, AND MACHINERY MAINTENANCE IN VACUUM PRODUCTION INSTALLATIONSSECTION 8 - CANCELLED—
040ASSEMBLY OF PRODUCTS FOR OTHERS IN VACUUM PRODUCTION INSTALLATIONS, VACUUM LABORATORY INSTALLATIONS, HEAVY METAL PRODUCTION INSTALLATIONS, CHEMICAL PRODUCTION INSTALLATIONS, SEMICONDUCTOR PRODUCTION INSTALLATIONS, DEPOSITION, ETCHING AND THERMAL TREATMENT PROCESSES IN THE VACUUM INSTALLATION INDUSTRY, HEAVY METAL INDUSTRY, CHEMICAL INDUSTRY, SEMICONDUCTOR INDUSTRY; AND CUSTOM MANUFACTURE OF PLASTIC PARTSSECTION 8 - CANCELLED—
041EDUCATIONAL SERVICES, NAMELY, CONDUCTING TRAINING CLASSES, SEMINARS, WORKSHOPS AND CONFERENCES FOR ENGINEERS, TECHNICIANS AND CONSUMERS IN THE FIELD OF VACUUM INSTALLATIONSSECTION 8 - CANCELLED—
042EMERGENCY TECHNICAL CONSULTATION SERVICES AVAILABLE VIA THE TELEPHONE IN THE FIELD OF DEPOSITION, ETCHING AND THERMAL TREATMENT PROCESSES IN VACUUM INSTALLATIONS; RESEARCH AND DEVELOPMENT OF NEW PRODUCTS FOR OTHERS IN THE FIELD OF VACUUM TECHNOLOGY, NAMELY, HIGH-VACUUM AND THIN FILM TECHNOLOGY; PATENT AGENCY AND INDUSTRIAL PROPERTY CONSULTATION IN THE FIELD OF VACUUM TECHNOLOGY, NAMELY HIGH-VACUUM AND THIN FILM TECHNOLOGY; AND TECHNICAL CONSULTATION IN THE FIELDS OF VACUUM TECHNOLOGY, HIGH-VACUUM TECHNOLOGY AND THIN-FILM TECHNOLOGYSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 20, 2009C8..CANCELLED SEC. 8 (6-YR)—
Feb 21, 2008CFITCASE FILE IN TICRS—
Aug 17, 2006CORVREVIEW OF CORRESPONDENCE COMPLETE—
Jan 23, 2003MAILPAPER RECEIVED—
Nov 12, 2002R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 26, 2002MAILPAPER RECEIVED—
Aug 20, 2002PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 31, 2002NPUBNOTICE OF PUBLICATION—
Apr 5, 2002CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 14, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 14, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 23, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 24, 2000CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2000DOCKASSIGNED TO EXAMINER—
Aug 17, 2000DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance