Drawing for SCRAMS

USPTO serial 76011164

SCRAMS

Reviewed by CopyMark Law Group

Reg. 2613865Status 710
Filing date
Status date
Registration date
Sep 3, 2002
Examiner
ALI, STEPHANIE MARIE
Law office
GENERIC WEB UPDATE

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SCRAMS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Benjamin Ford

3000 N. Sam Houston Pkwy E.Houston, TX 77032UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007APPARATUS AND EQUIPMENT FOR USE IN OIL AND GAS WELLS FOR THE EXPLORATION AND PRODUCTION OF OIL AND GAS, NAMELY, LINER AND CASING HANGERS, PACKERS; CHRISTMAS TREES, NAMELY, AN ASSEMBLY OF VALVES MOUNTED ON OIL AND GAS CASINGHEADS; WELLHEADS, BLOWOUT PREVENTORS, PUMPS, VALVES, SLIDING SLEEVES, TEMPERATURE GAUGES, FLOW METERS, CHOKES, WATER CONTROL EQUIPMENT, DOWNHOLE FORCE GENERATORS, THROUGH FLOWLINE TOOLS, DOWNHOLE POWER SUPPLIES, PUMPS, ARTIFICIAL LIFT EQUIPMENT, LOCK MANDRELS, NIPPLES, CHEMICAL INJECTION EQUIPMENT, CEMENTING EQUIPMENT, STIMULATION EQUIPMENT, MULTI-LATERAL COMPLETION EQUIPMENT, AS WELL AS OIL AND GAS WELL SURFACE EQUIPMENT, NAMELY, PUMPS AND FLUID CONTROL EQUIPMENT, ALL BEING HYDRAULICALLY OR MECHANICALLY CONTROLLED; APPARATUS AND EQUIPMENT FOR USE IN OIL AND GAS WELLS OR FOR THE EXPLORATION AND PRODUCTION OF OIL AND GAS, NAMELY, LINER AND CASING HANGERS, PACKERS; CHRISTMAS TREES, NAMELY, AN ASSEMBLY OF VALVES MOUNTED ON OIL AND GAS CASINGHEADS; WELLHEADS, BLOWOUT PREVENTORS, PUMPS, VALVES, SLIDING SLEEVES, TEMPERATURE GAUGES, FLOW METERS, CHOKES, WATER CONTROL EQUIPMENT, DOWNHOLE FORCE GENERATORS, THROUGH FLOWLINE TOOLS, DOWNHOLE POWER SUPPLIES, PUMPS, ARTIFICIAL LIFT EQUIPMENT, LOCK MANDRELS, NIPPLES, CHEMICAL INJECTION EQUIPMENT, CEMENTING EQUIPMENT, STIMULATION EQUIPMENT, MULTI-LATERAL COMPLETION EQUIPMENT, AS WELL AS OIL AND GAS WELL SURFACE EQUIPMENT, NAMELY PUMPS AND FLUID CONTROL EQUIPMENT; APPARATUS AND EQUIPMENT FOR USE IN OIL AND GAS WELL COMPLETION AND INTERVENTION, NAMELY LINER AND CASING HANGERS, PACKERS; CHRISTMAS TREES, NAMELY, AN ASSEMBLY OF VALVES MOUNTED ON OIL AND GAS CASINGHEADS; WELLHEADS, BLOWOUT PREVENTORS, PUMPS, VALVES, SLIDING SLEEVES, TEMPERATURE GAUGES, FLOW METERS, CHOKES, WATER CONTROL EQUIPMENT, DOWNHOLE FORCE GENERATORS, THROUGH FLOWLINE TOOLS, DOWNHOLE POWER SUPPLIES, PUMPS, ARTIFICIAL LIFT EQUIPMENT, LOCK MANDRELS, NIPPLES, CHEMICAL INJECTION EQUIPMENT, CEMENTING EQUIPMENT, STIMULATION EQUIPMENT, MULTI-LATERAL COMPLETION EQUIPMENT, AS WELL AS OIL AND GAS WELL SURFACE EQUIPMENT, NAMELY PUMPS AND FLUID CONTROL EQUIPMENT; DATA LOGGING AND COMMUNICATION APPARATUS FOR USE IN OIL AND GAS WELLS; APPARATUS AND EQUIPMENT FOR USE IN CONTROL, RECOVERY AND MANIPULATION OF FLUIDS, NAMELY, LINER AND CASING HANGERS, PACKERS; CHRISTMAS TREES, NAMELY, AN ASSEMBLY OF VALVES MOUNTED ON OIL AND GAS CASINGHEADS; WELLHEADS, BLOWOUT PREVENTORS, PUMPS, VALVES, SLIDING SLEEVES, TEMPERATURE GAUGES, FLOW METERS, CHOKES, WATER CONTROL EQUIPMENT, DOWNHOLE FORCE GENERATORS, THROUGH FLOWLINE TOOLS, DOWNHOLE POWER SUPPLIES, PUMPS, ARTIFICIAL LIFT EQUIPMENT, LOCK MANDRELS, NIPPLES, CHEMICAL INJECTION EQUIPMENT, CEMENTING EQUIPMENT, STIMULATION EQUIPMENT, MULTI-LATERAL COMPLETION EQUIPMENT, AS WELL AS OIL AND GAS WELL SURFACE EQUIPMENT, NAMELY PUMPS AND FLUID CONTROL EQUIPMENT; WIRELINE APPARATUS, NAMELY WIRELINE, WIRELINE COUPLERS; FISHING TOOLS, NAMELY, COUPLINGS AND CONNECTORS FOR USE IN RETRIEVING DOWNHOLE TUBULARS, TOOLS AND ASSEMBLIES FROM OIL AND GAS WELLS; REMOTELY CONTROLLED RESERVOIR ANALYSIS AND MANAGEMENT SYSTEMS; CONTROL SYSTEMS FOR THE AFORESAID GOODSSECTION 8 - CANCELLEDOct 23, 1997
009[ APPARATUS AND EQUIPMENT FOR USE IN OIL AND GAS WELLS FOR THE EXPLORATION AND PRODUCTION OF OIL AND GAS, NAMELY, TEMPERATURE GAUGES, FLOW METERS, ELECTRICAL AND ELECTRONIC FLUID CONTROL EQUIPMENT, BATTERIES, FLOW CONTROLS, ELECTRIC GENERATORS, REGULATORS; APPARATUS AND EQUIPMENT FOR USE IN OIL AND GAS WELL COMPLETION AND INTERVENTION, NAMELY, TEMPERATURE GAUGES, FLOW METERS, ELECTRICAL AND ELECTRONIC FLUID CONTROL EQUIPMENT, BATTERIES, FLOW CONTROLS, ELECTRIC GENERATORS, REGULATORS; APPARATUS AND EQUIPMENT FOR USE IN CONTROL, RECOVERY AND MANIPULATION OF FLUIDS, NAMELY, TEMPERATURE GAUGES, FLOW METERS, ELECTRICAL AND ELECTRONIC FLUID CONTROL EQUIPMENT, BATTERIES, FLOW CONTROLS, ELECTRIC GENERATORS, REGULATORS; WIRELINE APPARATUS; FISHING TOOLS, NAMELY, COUPLINGS AND CONNECTORS FOR USE IN RETRIEVING DOWNHOLE TUBULARS, TOOLS AND ASSEMBLIES FROM OIL AND GAS WELLS; SENSORS; COMPUTER SOFTWARE FOR DATA LOGGING AND COMMUNICATION FOR USE IN OIL AND GAS WELLS; DATA LOGGING AND COMMUNICATION APPARATUS FOR USE IN OIL AND GAS WELLS, NAMELY, COMPUTERS, TELEMETRY APPARATUS FOR THE TRANSMISSION OF DATA AND SIGNALS, FIBER-OPTIC CABLES, ELECTRIC CABLES; CONTROL SYSTEMS FOR THE AFORESAID GOODS, NAMELY ELECTRIC AND ELECTRONIC CONTROL CIRCUITS AND COMPONENTS; ALL BEING ELECTRICALLY OR ELECTRONICALLY OPERATED AND/OR CONTROLLED INCORPORATING ELECTRICAL OR ELECTRONIC PARTS ]SECTION 8 - CANCELLEDOct 23, 1997
042ENGINEERING SERVICES; PETROLEUM ENGINEERING SERVICES; OIL AND GAS WELL ENGINEERING SERVICES; OIL AND GAS WELL COMPLETION AND INTERVENTION SERVICES; DESIGN AND CONSTRUCTION OF EQUIPMENT AND APPARATUS FOR USE IN THE EXPLORATION AND PRODUCTION OF OIL AND GAS; DESIGN AND CONSTRUCTION [ AND RENTAL ] OF EQUIPMENT AND APPARATUS FOR USE IN CONTROL AND RECOVERY OF FLUIDS; ENGINEERING DRAWING SERVICESSECTION 8 - CANCELLEDOct 23, 1997

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 17, 2023CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Sep 3, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 8, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 8, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 8, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 8, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 8, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 24, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 24, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 4, 2012NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
May 4, 2012RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
May 4, 201289AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
May 4, 2012APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 18, 2012E89RTEAS SECTION 8 & 9 RECEIVED—
Apr 18, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 17, 2008C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 17, 2008PLGLASSIGNED TO PARALEGAL—
Sep 5, 2008815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Sep 5, 2008ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 5, 2008REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 5, 2008E815TEAS SECTION 8 & 15 RECEIVED—
Nov 26, 2007ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 26, 2007REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 1, 2007CFITCASE FILE IN TICRS—
Feb 8, 2003COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Dec 19, 2002AMD7SEC 7 REQUEST FILED—
Dec 19, 2002MAILPAPER RECEIVED—
Sep 3, 2002R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 11, 2002PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 22, 2002NPUBNOTICE OF PUBLICATION—
Apr 16, 2002CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 10, 2002CNEAEXAMINERS AMENDMENT MAILED—
Jan 7, 2002ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 5, 2001CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 9, 2001DOCKASSIGNED TO EXAMINER—
May 11, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 13, 2000CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 27, 2000DOCKASSIGNED TO EXAMINER—
Sep 20, 2000DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance