Drawing for WATERAIR

USPTO serial 76103389

WATERAIR

Reviewed by CopyMark Law Group

Reg. 2847124Status 710
Filing date
Status date
Registration date
Jun 1, 2004
Examiner
MCBRIDE, THEODORE M
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with WATERAIR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lawrence E. Abelman

LAWRENCE E ABELMAN ABELMAN FRAYNE & SCHWAB150 E 42ND STNEW YORK, NY 10017-5612UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Steel sheets; steel pipes; metal jets, namely, metal tubes gradually tapering, used to speed up or direct the water flow in swimming pools; metal rings, namely, metal gaskets used to make joints water-tight in swimming pools; metal reinforcing materials for concrete, namely, metal lattices for reinforcing the concrete edges of swimming pools; metal reinforcing materials for pipes, namely, metal pipe couplings and joints used for joining metal pipes in swimming pools; metal collars for fastening pipes, stop collars of metal for pipes; swimming pools made of metal; buildings of prefabricated metal; metal flanges, metal tiles for building; metal tile floorings; metal water pipes; metal building materials, namely, metal fasteners intended for building swimming pools made of metal, comprised of bolts, nails, rivets, screws, metal pipes and fittings therefor; metal framework panels intended for building swimming pools made of metal; metal transportable buildings; metal elbows for pipes; copper sealing rings; unwrought or semi-wrought copper in rod form; metal stair steps; metal drain traps; metal drain pipes; metal ladders; metal branching pipes; metal staircases; unwrought or semi-wrought iron in sheet and rod form; metal grilles, namely metal gates and fencing; metal pipe muffs; prefabricated metal swimming pools; unwrought or semi-wrought lead in rod form; metal pipe junctions and washers of metal for water taps; bath, pool and plumbing fittings, namely, manually operated metal water pipe valvesSECTION 8 - CANCELLED—
011Pumps for swimming pools; water purifying units; cartridges for filtering machines; filtering machines for use in swimming pools; cartridges for water filtering units for domestic use; water softening unit; bath tubs; bath fittings, namely, mixer faucets for water pipes; bath tubs for sit baths; bath apparatus, namely, showers and bath tubs; heating installations, namely, hot water heaters; heat pumps; disinfectant apparatus, namely, water purification units intended for use in swimming pools; swimming pool water cleaning and filtering units; water intake units, namely, hydrants; hot water heaters; level controlling valves in tanks; faucets; manually operated water pipe plumbing valves not of metal or plastic; non-metallic bath enclosures; non-metallic shower enclosures; bath enclosures, shower enclosures, and water pipes being parts of sanitary facilitiesSECTION 8 - CANCELLED—
019Tarred strips of cement and mortar mixes for building; nonmetallic swimming pools; concrete; concrete building materials, namely, bricks and slabs; non-metallic staircases; non-metallic stair steps; bituminous roof coatings for buildings; non-metallic paving tiles for building; non-metallic floor tiles; concrete shuttering, namely, concrete formwork; non-metallic paving tiles; non-metallic wall panels for building, and prefabricated non-metal swimming pool buildingSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 7, 2011C8..CANCELLED SEC. 8 (6-YR)—
Sep 1, 2006CORVREVIEW OF CORRESPONDENCE COMPLETE—
Aug 21, 2006MAILPAPER RECEIVED—
Jun 1, 2004R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 9, 2004PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 18, 2004NPUBNOTICE OF PUBLICATION—
Jan 9, 2004CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 4, 2003CFITCASE FILE IN TICRS—
Nov 18, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 18, 2003TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 28, 2003CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 13, 2003DOCKASSIGNED TO EXAMINER—
Dec 13, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 13, 2002TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 9, 2002DOCKASSIGNED TO EXAMINER—
Aug 5, 2002CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 26, 2001DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance