Drawing for EBARA

USPTO serial 76141618

EBARA

Reviewed by CopyMark Law Group

Reg. 3403942Status 710
Filing date
Status date
Registration date
Apr 1, 2008
Examiner
ERVIN, INGA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with EBARA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lawrence E. Abelman

LAWRENCE E ABELMAN ABELMAN FRAYNE & SCHWAB666 3RD AVENEW YORK, NY 10017-5621UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037General building construction; Installation, repair, cleaning, maintenance of Chemical processing machines and apparatus, Agricultural machines and implements, Non-electric prime movers other than land vehicles, Pneumatic or hydraulic machines and instruments, Machine elements other than land vehicles, Refuse compressors, Refuse crushers, Starters for motors and engines, Alternating-current motors and direct-current motors not including those for land vehicles but including "parts" for any AC motors and DC motors, Alternating-current generators, Direct-current generators, Ozonisers-Ozonators, Electrolysers, Fire alarms, Gas alarms, Anti-theft warning apparatus, Measuring or testing machines and instruments, Power distribution or control machines and apparatus, Rotary converters, Phase modifiers, Batteries and cells, Electric or Magnetic meters and testers, Electric wires and cables, Electronic machines, apparatus and accessories thereof, Drying apparatus, Recuperators, Steamers, Evaporators, Distillers, Heat exchangers, Industrial furnaces, Nuclear reactors Atomic piles, Industrial boilers, Air-conditioning apparatus, Refrigerating machines and apparatus, Waste water treatment tanks, Septic tanks, Garbage incinerators, Water-purifying machines and apparatus; Installation, repair, cleaning, and maintenance of Nuclear equipment; Installation, repair, and maintenance of Measuring machines and instruments and of Detectors; Installation, repair, cleaning, and maintenance of Semiconductor manufacturing machines and apparatus; Installation, repair, cleaning, and maintenance of incinerators; Installation, repair, cleaning, and maintenance of Gasifiers; Installation, repair, cleaning, and maintenance of Machines and apparatus for treating water, sewage water, industrial water, industrial waste water, night soil, refuse, household waste, industrial waste, industrial waste gases and heat and for manufacturing compost; Installation, repair, and maintenance of Refuse compressors and sewage soil crushers; Installation, repair, and maintenance of Waste-sewage-night soil treatment equipment and of composting machines and instruments; Installation, repair, and maintenance of Machines and apparatus for purifying water and sewage waters; Installation, repair, and maintenance of Gaseous melting system; Installation, repair, and maintenance of Melting furnace for sludge and of sludge treatment equipment; Installation, repair, and maintenance of Distilled water recovery equipment and ultrapure water system; Installation, repair, and maintenance of Electric demineralizers and continuous-electro deionization; Installation, repair, and maintenance of Machines and apparatus for excluding Nox, nitrogen-oxide, and Sox, sulfa-oxide; Installation, operation, repair, cleaning, and maintenance of Pumps, vacuum pumps, compressors, pressure tanks, burners, boilers, freezers/freezing equipment, fans, blowers, turbines, heaters and air-conditioning apparatus; Installation, repair, and maintenance of fluidized bed boiler; Installation, repair, cleaning, and maintenance of Water supplying machines automatically operated; Installation, operation, repair, cleaning, and maintenance of refrigerating machines, such as centrifugal refrigerating machines, Absorption refrigerating machines, Gas direct fire heater chillers, Oil fired absorption chiller/heater, Heat pumps, Chilling unites, Fan coil unites, Cooling towers, Ice storage machines, instruments and system; Installation, repair, cleaning, and maintenance of Metalworking machines and machine tools, power polishers, chemical-mechanical polishing machines used in the manufacture of semi-conductors, surface polishers for semi-conductor wafers, semi-conductor wafer treatment machines and implements and machines for carrying the wafers, as well as components and accessories thereof; Electrical work construction and telecommunication work construction; Installation, repair, and maintenance of electricity Control panels and control mechanisms for machines, engines and motors; Construction, installation, repair, and maintenance of Telecommunication equipment and system; Construction, installation, repair, and maintenance of System for controlling and monitoring pumps; Construction, installation, repair, and maintenance of Electrical information and transmission machines, apparatus and system for multimedia; Construction, installation, repair, and maintenance of Visual sensors for watching traffic; Construction, installation, repair, and maintenance of Controlling, monitoring and managing machines, apparatus and system; Construction, installation, repair, cleaning, and maintenance of Plating apparatus, such as Electric soldering apparatus, Electric plating apparatus and Electroless plating apparatus, Bump plating apparatus, namely, Plating machines for gold, solder or copper bump plating on circuit terminals on IC chips; Construction, installation, repair, cleaning, and maintenance of Automatic apparatus for analyzing solution composition in solder plating system, namely, Solutions analyzers for solder plating on IC lead frames and for keeping each component density constant; Construction, installation, repair, cleaning, and maintenance of Automatic apparatus for treating draining in solder plating system, namely, Water treatment machines for recovering pure water from waste water in solder plating lead frame cleaning/processing; Installation, repair, and maintenance of Computers including central processing units, programmed-data-carrying electronic circuits or magnetic disks/magnetic tapes/magnetic cards, optical disks and other peripheral equipment; Installation, repair, cleaning, and maintenance of plants; Installation, operation, repair, replacement work, cleaning, and maintenance of Equipment for supplying water to or draining water from buildings; Installation, repair, replacement work, cleaning, and maintenance of Water receptacles or water tanks in elevated positions; Installation, repair, and maintenance of Machines and implements, components and accessories thereof, for processing, forming and manufacturing of thin films for using electronic machines and implements; Installation, repair, and maintenance of Machines and implements, components and accessories thereof, for manufacturing of liquid crystal display for using electronic machines and implements; Installation, repair, and maintenance of Solar batteries as well as components thereof; Installation, repair, and maintenance of Fuel cell as well as components thereof; Installation, repair, and maintenance of Chemical reactors, used for attaching a vapor of a chemical material and deposition equipment, as well as components thereof; Installation, repair, and maintenance of equipment used for processing wafers used for manufacturing semiconductors, as well as components thereof; Installation, repair, and maintenance of Epitaxial reactors, chemical deposition reactors, plasma etching process equipment, physical deposition reactors, ion injection equipment, and supporting frames thereof; Installation, repair, and maintenance of Containers for semiconductor wafers, and components thereof; Installation, repair, and maintenance of Measurement equipment for film thickness of semiconductor wafers, and components thereof; Collection of municipal waste; Collection of industrial waste; Rental/leasing of physical and chemical machines and instruments; Rental/leasing of driven machines and instruments, pneumatic or hydraulic machines and instrumentsSECTION 8 - CANCELLED—
042Custom design of plants, including machines and apparatus for treating water, sewage water, industrial water, industrial waste water, night soil, refuse, industrial waste, industrial waste gases and heat; Engineering services in the field of environmental hygienic facility system and water purifying apparatus and water contamination control equipment; Engineering services in the field of ultra pure water production system and various other environmental hygienic system; Engineering services in the field of cogeneration system and other electric power plants; Engineering services of the pump equipment; Engineering services of incinerators; Investigation, analysis, inspection, examination, scientific research and information services for waste, fuel gas reproduced from waste, gas for generating electricity, other fuels, gas for chemical raw materials and other various chemical materials; Design of plan, investigation, examination, scientific research, technological guidance, consultancy and information services in the field of regeneration, processing and treatment of waste; Design, drawing, engineering, examination, scientific research, technological guidance, consultancy and information services of waste compression apparatus, waste crushing apparatus, waste processing apparatus, waste treatment apparatus and plant for regeneration, processing and treatment of the waste; Design of machines, apparatus and instruments including components thereof and/or facilities composed by these machines, apparatus and instruments excluding design services of waste compression apparatus, waste crushing apparatus, waste processing apparatus, waste treatment apparatus and plant for regeneration, processing and treatment of the waste; Examination and scientific research services of prevention of the pollution; Examination, inspection and scientific research services of agriculture, livestock breeding and marine; Examination and scientific research services of machines and instruments excluding examination and scientific research services of waste compression apparatus, waste crushing apparatus, waste processing apparatus, waste treatment apparatus and plant for regeneration, processing and treatment of the waste; Consultancy of investigation, analysis, improvement services of environment; Examination and scientific research services in the field of liquid, heat, energy, materials, vibration control, sound control, tribology, magnetic carrier shaft and magnetic application, system control, information technology, beam technology, biotechnology, pure water, ultra-pure water, sterilization water, water treatment, sludge treatment, harmful gas treatment and air purification; Measurement, analysis and investigation services of water quality, atmosphere, energy use, working environment; Measurement and analysis services of air pollution, water pollution, noise, and other environmental matters; Maintenance of computer software for electrical information and transmission apparatus for multimedia; Maintenance of computer software for controlling, monitoring and managing machines; rental/leasing of measuring machines and instruments and detectorsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 7, 2014C8..CANCELLED SEC. 8 (6-YR)—
Apr 1, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 15, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 26, 2007NPUBNOTICE OF PUBLICATION—
Dec 11, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 11, 2007ALIEASSIGNED TO LIE—
Nov 5, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 26, 2007CNEAEXAMINERS AMENDMENT MAILED—
Sep 26, 2007XAECEXAMINER'S AMENDMENT ENTERED—
Sep 26, 2007CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 15, 2007XAECEXAMINER'S AMENDMENT ENTERED—
Jul 13, 2007CNEAEXAMINERS AMENDMENT MAILED—
Jul 12, 2007XAECEXAMINER'S AMENDMENT ENTERED—
Jul 12, 2007CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 1, 2007CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 1, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 26, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 25, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 25, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 7, 2006CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 7, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 3, 2006ZZBXALLOWANCE WITHDRAWN-INADVERTENTLY ISSUED ACTION—
Oct 27, 2006PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Oct 2, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 22, 2006ALIEASSIGNED TO LIE—
Sep 15, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 30, 2006ACECAMENDMENT FROM APPLICANT ENTERED—
Aug 21, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 21, 2006MAILPAPER RECEIVED—
Jul 13, 2006UNDCUNDELIVERABLE MAIL - COURTESY COPY MAILED—
Jul 3, 2006CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 30, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2006RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Mar 8, 2006CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 3, 2006MAILPAPER RECEIVED—
Feb 7, 2006MAILPAPER RECEIVED—
Nov 21, 2005RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 28, 2005RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Apr 11, 2005RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Mar 29, 2005RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Sep 29, 2004CNSLLETTER OF SUSPENSION MAILED—
Sep 28, 2004CNSLSUSPENSION LETTER WRITTEN—
Aug 27, 2004ACECAMENDMENT FROM APPLICANT ENTERED—
Aug 20, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 20, 2004MAILPAPER RECEIVED—
Jun 21, 2004CNSIINQUIRY AS TO SUSPENSION MAILED—
Dec 23, 2003CNSLLETTER OF SUSPENSION MAILED—
Dec 9, 2003CFITCASE FILE IN TICRS—
Nov 12, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 12, 2003MAILPAPER RECEIVED—
Oct 2, 2003CNSIINQUIRY AS TO SUSPENSION MAILED—
Nov 1, 2002CNSLLETTER OF SUSPENSION MAILED—
Oct 10, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 10, 2002MAILPAPER RECEIVED—
Aug 14, 2002CNSIINQUIRY AS TO SUSPENSION MAILED—
Jul 17, 2002DOCKASSIGNED TO EXAMINER—
Dec 5, 2001CNSLLETTER OF SUSPENSION MAILED—
Sep 19, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 21, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 14, 2001DOCKASSIGNED TO EXAMINER—
Mar 12, 2001DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance