Drawing for ECOWAY

USPTO serial 76183498

ECOWAY

Reviewed by CopyMark Law Group

Reg. 3342377Status 710
Filing date
Status date
Registration date
Nov 27, 2007
Examiner
OH, WON TEAK
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ECOWAY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey H Kaufman

JEFFREY H KAUFMAN OBLON SPIVAK MCCLELLAND MAIER & NEUSTADT1940 DUKE STALEXANDRIA, VA 22314UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Metal cutting machines; continuous casting machines; rolling mills; metal extruding machines; extrusion press machines, forging presses, hot isostatic press machines; cold isostatic press machines; wire drawing machines; magnetic stirring machines; mineral processing equipment, namely, crushing machines, grinding mill machines, vibrating screen separators, feeding machines; rubber processing machines, namely, palletizing machines, mixing machines, tire uniformity machines, tire shaping machines, tire curing machines; plastic processing equipment, namely, palletizing machines, mixing machines, plastic extruding machines, injection molding machines, bead winding machines; coating machines; etching machines; spray painting industrial robot; welding industrial robots; material handling robot, namely, palletizing robots; master slave manipulator machine for robots; electric welding machines, hydraulic excavators; electric mining shovels; mining machine parts, namely, draglines; floating crane machines; pile drivers; bucket wheel excavators; cranes; wheel loaders; continuous unloader conveyors; metal cutting machine parts, namely, drill, end mill, gear shaping, shaving cutters, broaches, saws, carbide tipped tools, ceramic cutting tools; fertilizing machines; weaving machines; municipal refuse shredding equipment; solid waste equipment, namely, liquefiers; rough terrain cranes, machine parts, namely, crank shaft, reformer tubes, ball valves, gate valves, gas compressors, gas expanders, vacuum pumps, gas turbine generators, rotor shaft, turbine blades, rolling for rolling mills; electric arc welding machines; arc ion plating machinesSECTION 8 - CANCELLED—
009Tire testing machines, welding electrodes; welding fittings, namely nozzles and carriages; electric arc welders; welding transformer; integrated circuits; electric controls for real-time operation systems; monitoring systems; telemeter systems, remote control systems, and electric boards, namely condensers, capacitors, electronic coupling, current rectifiers, transformers, converters; computer systems, comprised primarily of hardware, operating software, processors, central processing units, printed circuits, integrated circuits, semi-conductors, magnetic cards, printers and instructional manuals sold therewith; optical scanner; equipment for measuring electric current, namely, amperage testers, planimeter, material testers, indicatorsSECTION 8 - CANCELLED—
011Purification installations for air, sewage and water; incinerators; industrial furnaces; furnace boilers; water treatment units for industrial use, namely, reverse osmosis equipment, air washer, heating apparatus, suspension preheater, cooling apparatus; refrigerators; cryogenic equipment, namely, refrigerators, and liquefiers; air filters for industrial installations; desalination units; heat exchanger; separators for the cleaning and purification of gases; open rack vaporizer for use in the natural gas industry; pressure vessel processing installations for fuel and nuclear moderating materialSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 4, 2014C8..CANCELLED SEC. 8 (6-YR)—
Nov 27, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 24, 2007DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
May 14, 2007IUCNNOTICE OF ALLOWANCE CANCELLED—
May 14, 2007D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jan 23, 2007ICNANOTICE OF ALLOWANCE CORRECTION ENTERED—
Dec 12, 2006NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 19, 2006PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 30, 2006NPUBNOTICE OF PUBLICATION—
Jul 24, 2006ADBS1(B) BASIS DELETED; NEW BASIS REQUESTED—
Jul 13, 2006PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED—
Jun 14, 2006IUCNNOTICE OF ALLOWANCE CANCELLED—
Jun 14, 2006PDCBPETITION TO DIRECTOR - CHANGE BASIS - RECEIVED—
Jun 14, 2006MAILPAPER RECEIVED—
Jan 26, 2006EX4GSOU EXTENSION 4 GRANTED—
Dec 15, 2005EXT4SOU EXTENSION 4 FILED—
Dec 15, 2005MAILPAPER RECEIVED—
Jun 27, 2005EX3GSOU EXTENSION 3 GRANTED—
Jun 16, 2005EXT3SOU EXTENSION 3 FILED—
Jun 16, 2005MAILPAPER RECEIVED—
Jan 6, 2005EX2GSOU EXTENSION 2 GRANTED—
Dec 10, 2004EXT2SOU EXTENSION 2 FILED—
Dec 10, 2004MAILPAPER RECEIVED—
Jun 23, 2004EX1GSOU EXTENSION 1 GRANTED—
Jun 3, 2004EXT1SOU EXTENSION 1 FILED—
Jun 3, 2004MAILPAPER RECEIVED—
Jan 12, 2004FAXXFAX RECEIVED—
Dec 16, 2003NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 23, 2003PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 3, 2003NPUBNOTICE OF PUBLICATION—
Jun 30, 2003CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 20, 2003ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 29, 2003CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 2003CFITCASE FILE IN TICRS—
Apr 7, 2003ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 26, 2003CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 18, 2003CNEAEXAMINERS AMENDMENT MAILED—
Mar 17, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 17, 2003MAILPAPER RECEIVED—
Nov 29, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 29, 2002MAILPAPER RECEIVED—
Oct 9, 2002DOCKASSIGNED TO EXAMINER—
Sep 16, 2002CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 5, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 5, 2002MAILPAPER RECEIVED—
Feb 4, 2002CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 24, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 24, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 6, 2001DOCKASSIGNED TO EXAMINER—
Feb 14, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—

Frequently asked questions

Related guidance