USPTO serial 76184485
PSEG WE MAKE THINGS WORK FOR YOU.
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 24, 2004
- Examiner
- CHISOLM, KEVON
- Law office
- GENERIC WEB UPDATE
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with PSEG WE MAKE THINGS WORK FOR YOU.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Newark, NJ
Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Newark, NJ
Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Newark, NJ
Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Vanessa A. Ignacio, Esq.
Vanessa A. Ignacio, Esq. LOWENSTEIN SANDLER LLC65 LIVINGSTON AVENUEROSELAND, NJ 07068UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 035 | COOPERATIVE ADVERTISING AND MARKETING IN THE AREA OF NATURAL GAS AND ENERGY FOR OTHERS; BUSINESS MANAGEMENT AND INDUSTRIAL MANAGEMENT ASSISTANCE IN THE FIELDS OF ENERGY USE, ENERGY NEEDS, ESTIMATING ENERGY COSTS, AND REGULATORY COMPLIANCE; PROCUREMENT, NAMELY PURCHASING OF ENERGY-USING SYSTEMS FOR OTHERS; AUDITING UTILITY RATES FOR OTHERS; OPERATION OF A BUSINESS FOR OTHERS, NAMELY, COGENERATION, THERMAL AND INDEPENDENT ELECTRIC POWER PRODUCTION FACILITIES; COST/PRICE ANALYSIS IN THE AREA OF ENERGY, ELECTRICITY AND NATURAL GAS MARKETS; MARKET ANALYSIS AND MARKET RESEARCH FOR OTHERS; BUSINESS MANAGEMENT AND CONSULTATION IN THE FIELDS OF ENERGY AND PUBLIC UTILITIES, NAMELY, ELECTRIC OUTAGE MANAGEMENT SERVICES; PROCUREMENT, NAMELY, THE PURCHASE OF ENERGY GENERATION, DISTRIBUTION AND TRANSMISSION SYSTEMS COMPONENTS FOR OTHERS IN THE FIELDS OF ENERGY AND PUBLIC UTILITIES; COOPERATIVE ADVERTISING AND MARKETING FOR OTHERS OF HOME SAFETY PRODUCTS, NAMELY SMOKE DETECTORS, FIRE EXTINGUISHERS, CARBON MONOXIDE DETECTORS AND THE LIKE | SECTION 8 - CANCELLED | Feb 4, 2002 |
| 036 | Financing services in the field of energy-using equipment; financial and investment services, namely lease-purchase financing services, project financing, venture capital financing, leveraged buyout financing, real estate investment, financial services in the nature of an investment security; lease-purchase financing; Capital investment consultation; Financial analysis and consultation in the area of energy, electricity and natural gas; Commodity exchange; Commodity brokerage; Commodity investment advice; Commodity trading for others; Financial forecasting in the area of energy, electricity and natural gas; Financial portfolio management in the area of energy, electricity and gas markets; Financial management for others; Financial forecasting in the energy, electricity and natural gas commodity markets; Investment in the field of energy for others, namely, electricity and natural gas markets for others; Investment management for others; Risk management for others; Providing pre-paid repair, installation, maintenance and service plans for large and small home appliances and HVAC | SECTION 8 - CANCELLED | Apr 1, 2000 |
| 037 | INSTALLATION, MAINTENANCE AND REPAIR OF ENERGY USING SYSTEMS; CONSTRUCTION AND MAINTENANCE OF COGENERATION, THERMAL AND INDEPENDENT ELECTRIC POWER PRODUCTION FACILITIES FOR OTHERS; FIRE ALARM INSTALLATION AND REPAIR; ELECTRICAL CONTRACTING; INSTALLATION OF KITCHEN APPLIANCES SPECIFICALLY, STOVES, DISHWASHERS AND RANGES; MAINTENANCE AND REPAIR OF BURNERS; LAYING AND CONSTRUCTION OF PIPELINES; ELECTRICAL REPAIRS AND INSTALLATION OF APPLIANCES; NATURAL GAS PIPELINE INSTALLATION AND REPAIR; MAINTENANCE AND REPAIR OF BOILERS, STEAM TURBINES, GAS TURBINES, ELECTRIC SUBSTATIONS, TRANSFORMERS, AND GENERATOR VOLTAGE REGULATORS FOR OTHERS IN THE ENERGY FIELD; CONSTRUCTION AND RENOVATION OF ELECTRIC SUBSTATIONS FOR OTHERS IN THE ENERGY FIELD; REPAIR OF PIPING AND BOILER INSULATION AND REFRACTORY; MACHINERY REPAIR AND MAINTENANCE; INSTALLATION AND CONSTRUCTION OF NATURAL GAS MAINS; INSTALLATION AND CONSTRUCTION OF UNDERGROUND ELECTRIC DISTRIBUTION SYSTEMS; CONSTRUCTION SUPERVISION; REMOVAL AND INSTALLATION OF BOILER, PIPE AND ELECTRICAL MAIN INSULATION AND LAGGING; REPAIR FOR OTHERS OF PRESSURE VESSELS, NATURAL GAS PIPELINE, HANGERS, TURBINE PARTS, LARGE BORE PIPING SYSTEMS; REPAIR, INSTALLATION, AND MAINTENANCE OF LARGE AND SMALL HOME APPLIANCES AND HVAC | SECTION 8 - CANCELLED | Apr 1, 2000 |
| 039 | Utility services, namely, transmission of unregulated natural gas through pipelines and electricity; utility services in the nature of distribution and transmission of natural gas through pipelines and electricity and thermal energy to industrial, commercial, institutional and residential customers; Distribution of energy; Public Utility services, namely the transmission of Electricity and Natural Gas; Public utility services | SECTION 8 - CANCELLED | Apr 1, 2000 |
| 040 | Production of energy in the form of cogeneration, thermal and electric power, whether fossil-fueled, hydro, renewable energies or otherwise; generation of electricity; Welding; machine shop services, namely, machining parts for others; custom fabrication of pressure vessels, natural gas pipeline; pipe hangers, turbine parts, large bore piping systems | SECTION 8 - CANCELLED | Apr 1, 2001 |
| 042 | Design for others in the field of cogeneration, thermal and independent electric power production facilities; engineer cogeneration, thermal and independent electric power production facilities for others; energy usage management for others; energy auditing for others; Electrical testing, namely, thermography, high electrical voltage testing; calibration; battery testing; circuit breaker testing; construction material testing; coupling capacitor and bushing potential device testing; dew point testing for transformers and circuit breakers; polarization index and discharge testing for generators; industrial gas meter failure testing; physical and electrical testing of materials; chemical analysis; asbestos analysis; testing for corrosion of underground and aboveground metallic structures; analysis of waste water, solid waste, hazardous waste, and soil; fuel analysis; insulating oil analysis; lubricating oil analysis; failure analysis of power plants, electric distribution and transmission systems, and gas distribution and transmission systems; testing for environmental contaminants; testing for environmental air emissions; testing and analysis of rotating machinery; design of cathodic protection systems for others | SECTION 8 - CANCELLED | Apr 1, 2000 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
- Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
- Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
- Other trademarks in Class 035
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named PSEG WE MAKE THINGS WORK FOR YOU.
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 7, 2025 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Aug 24, 2023 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Aug 19, 2014 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Aug 19, 2014 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Aug 19, 2014 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Aug 19, 2014 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 1, 2014 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Aug 11, 2010 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Aug 11, 2010 | CORV | REVIEW OF CORRESPONDENCE COMPLETE | — |
| Aug 6, 2010 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 16, 2010 | 815F | REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED | — |
| Jul 16, 2010 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Apr 10, 2009 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 10, 2009 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 24, 2004 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 30, 2004 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Apr 9, 2004 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 9, 2004 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Apr 9, 2004 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 5, 2004 | CFIT | CASE FILE IN TICRS | — |
| Mar 24, 2004 | IUAF | USE AMENDMENT FILED | — |
| Mar 24, 2004 | EXT2 | SOU EXTENSION 2 FILED | — |
| Mar 24, 2004 | PAPER RECEIVED | — | |
| Oct 27, 2003 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 25, 2003 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 25, 2003 | PAPER RECEIVED | — | |
| Apr 14, 2003 | PAPER RECEIVED | — | |
| Mar 25, 2003 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 31, 2002 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 11, 2002 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 12, 2002 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 11, 2002 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 1, 2002 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jul 1, 2002 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 22, 2002 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 19, 2001 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 17, 2001 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 18, 2001 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 30, 2001 | DOCK | ASSIGNED TO EXAMINER | — |