USPTO serial 76184487
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Newark, NJ
Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Newark, NJ
Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Newark, NJ
Other trademarks owned by PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Matthew Hintz, Esq.
Matthew Hintz, Esq. Lowenstein Sandler LLPOne Lowenstein DriveRoseland, NJ 07068UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 035 | BUSINESS MANAGEMENT AND CONSULTATION IN THE FIELDS OF ENERGY AND PUBLIC UTILITIES, NAMELY, ELECTRIC OUTAGE MANAGEMENT SERVICES; PROCUREMENT NAMELY, THE PURCHASE OF ENERGY GENERATION, DISTRIBUTION AND TRANSMISSION SYSTEMS COMPONENTS FOR OTHERS IN THE FIELDS OF ENERGY AND PUBLIC UTILITIES; AUDITING UTILITY RATES FOR OTHERS; COOPERATIVE ADVERTISING AND MARKETING FOR OTHERS OF HOME SAFETY PRODUCTS, NAMELY, SMOKE DETECTORS, FIRE EXTINGUISHERS, CARBON MONOXIDE DETECTORS AND THE LIKE | ACTIVE | Feb 4, 2002 |
| 036 | PROVIDING PRE-PAID REPAIR, INSTALLATION, MAINTENANCE AND SERVICE PLANS FOR LARGE AND SMALL HOME APPLIANCES AND HVAC | ACTIVE | Mar 15, 1997 |
| 037 | INSTALLATION OF KITCHEN APPLIANCES SPECIFICALLY, STOVES, DISHWASHERS AND RANGES; MAINTENANCE AND REPAIR OF BURNERS; LAYING AND CONSTRUCTION OF PIPELINES; ELECTRICAL REPAIRS AND INSTALLATION OF APPLIANCES; NATURAL GAS PIPELINE INSTALLATION AND REPAIR; MAINTENANCE AND REPAIR OF BOILERS, STEAM TURBINES, GAS TURBINES, ELECTRIC SUBSTATIONS, TRANSFORMERS, AND GENERATOR VOLTAGE REGULATORS FOR OTHERS IN THE ENERGY FIELD; CONSTRUCTION AND RENOVATION OF ELECTRIC SUBSTATIONS FOR OTHERS IN THE ENERGY FIELD; REPAIR OF PIPING AND BOILER INSULATION AND REFRACTORY; MACHINERY REPAIR AND MAINTENANCE; INSTALLATION AND CONSTRUCTION OF NATURAL GAS MAINS; INSTALLATION AND CONSTRUCTION OF UNDERGROUND ELECTRIC DISTRIBUTION SYSTEMS; CONSTRUCTION SUPERVISION; REMOVAL AND INSTALLATION OF BOILER, PIPE AND ELECTRICAL MAIN INSULATION AND LAGGING; REPAIR FOR OTHERS OF PRESSURE VESSELS, NATURAL GAS PIPELINE, HANGERS, TURBINE PARTS, LARGE BORE PIPING SYSTEMS; REPAIR, INSTALLATION, AND MAINTENANCE FOR LARGE AND SMALL HOME APPLIANCES AND HVAC | ACTIVE | Mar 15, 1997 |
| 039 | DISTRIBUTION OF ENERGY; PUBLIC UTILITY SERVICES, NAMELY THE TRANSMISSION OF ELECTRICITY AND NATURAL GAS; TRANSMISSION OF NATURAL GAS THROUGH PIPELINES; PUBLIC UTILITY SERVICES | ACTIVE | Mar 15, 1997 |
| 042 | ENERGY AUDITING FOR OTHERS; ELECTRICAL TESTING, NAMELY, THERMOGRAPHY, HIGH ELECTRICAL VOLTAGE TESTING; CALIBRATION; BATTERY TESTING; CIRCUIT BREAKER TESTING; CONSTRUCTION MATERIAL TESTING; COUPLING CAPACITOR AND BUSHING POTENTIAL DEVICE TESTING; DEW POINT TESTING FOR TRANSFORMERS AND CIRCUIT BREAKERS; POLARIZATION INDEX AND DISCHARGE TESTING FOR GENERATORS; INDUSTRIAL GAS METER FAILURE TESTING; PHYSICAL AND ELECTRICAL TESTING OF MATERIALS; CHEMICAL ANALYSIS; ASBESTOS ANALYSIS; TESTING FOR CORROSION OF UNDERGROUND AND ABOVEGROUND METALLIC STRUCTURES; ANALYSIS OF WASTE WATER, SOLID WASTE, HAZARDOUS WASTE, AND SOIL; FUEL ANALYSIS; INSULATING OIL ANALYSIS; LUBRICATING OIL ANALYSIS; FAILURE ANALYSIS OF POWER PLANTS, ELECTRIC DISTRIBUTION AND TRANSMISSION SYSTEMS, AND GAS DISTRIBUTION AND TRANSMISSION SYSTEMS; TESTING FOR ENVIRONMENTAL CONTAMINANTS; TESTING FOR ENVIRONMENTAL AIR EMISSIONS; TESTING AND ANALYSIS OF ROTATING MACHINERY; DESIGN OF CATHODIC PROTECTION SYSTEMS FOR OTHERS | ACTIVE | Mar 1, 1993 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 4, 2024 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Mar 4, 2024 | RNL2 | REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Mar 4, 2024 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Mar 4, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 15, 2023 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Sep 30, 2022 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Sep 18, 2013 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Sep 18, 2013 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Sep 18, 2013 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Sep 18, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 10, 2013 | 89AF | REGISTERED - COMBINED SECTION 8 (10-YR) & SEC. 9 FILED | — |
| Sep 10, 2013 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jul 17, 2009 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jun 4, 2009 | PLGL | ASSIGNED TO PARALEGAL | — |
| Jun 2, 2009 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Apr 10, 2009 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 10, 2009 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 20, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 30, 2003 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 8, 2003 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jul 31, 2003 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 30, 2003 | CFIT | CASE FILE IN TICRS | — |
| Jun 26, 2003 | PAPER RECEIVED | — | |
| Jun 25, 2003 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 25, 2003 | IUAF | USE AMENDMENT FILED | — |
| Jun 25, 2003 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 25, 2003 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 31, 2002 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 8, 2002 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 18, 2002 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 15, 2002 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 8, 2002 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jul 1, 2002 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 13, 2002 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 24, 2002 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jan 28, 2002 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 25, 2001 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 2, 2001 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 1, 2001 | DOCK | ASSIGNED TO EXAMINER | — |