Drawing for WOLSELEY

USPTO serial 76280545

WOLSELEY

Reviewed by CopyMark Law Group

Reg. 3099599Status 800Renewal
Filing date
Status date
Registration date
Jun 6, 2006
Examiner
ESTRADA, LINDA M
Law office
GENERIC WEB UPDATE

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with WOLSELEY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $299*

Plus Government fees of $850

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

William Rueger Poynter

William Rueger Poynter Kaleo Legal4456 Corporation LaneSuite 135Virginia Beach, VA 23462

Goods and services

ClassDescriptionStatusFirst use
001[ Adhesives for use industrial uses in manufacturing; soldering fluxes ]SECTION 8 - CANCELLED—
006[ Items of metal hardware, namely, bolts, brads, window casements, door casings, casters, chains, clamps, cotter pins, door bolts; metallic door hardware, namely, keys and key cylinders; door knobs, fasteners, door rollers, guard rails, hinges, hooks, hose fittings, knobs, latches, locks, nails, nuts, pegs, plugs, rails, rivets, screws, shims, springs, and studs; metal building materials, namely, door frames, doors fencing gates, garage doors, gutter pipes, millwork, patio doors, sliding doors, screen doors, and window screens ]SECTION 8 - CANCELLED—
008[ Hand tools for use in plumbing, namely, socket sets; water heater element sockets; pipe cutters; hand tools, namely, handle pullers, used to pull faucet handles off of their fittings and nipple extractors; seat wrenches; spud wrenches; metal hand tools, namely, wrenches used to turn a water main off and on at street locations; basin wrenches; tubing cutters; crimpers, drills, hack saws, pipe wrenches, screwdrivers, torches, tubing cutters, vice grips; hand tools for use in wood working, metal working and carpentry, namely, adzes, augers, awls, bevels, chisels, clamps, drills, files, grinding wheels, grindstones, hammers mitre boxes, planers, planes, punches, rasps, saws and squares ]SECTION 8 - CANCELLED—
009[ Electrical flexes, wires and cables; electrical wiring accessories, namely, plugs, plug sockets, switches, switch boxes; protection devices, namely, fuse boxes, safety fuses, connections, transformers, control units for electrical appliances, cable and extension reels for use therewith, circuit breakers, socket outlets for coaxial cable plugs; conduit and housings for electric cables, junction boxes, earth sleeves for cables, condensers, electric coils, capacitors, electrical relays, and electrical circuit disconnects; control apparatus and instruments for use with or being parts of heating or water supply installations, namely, aerometers, ammeters, circuit breakers, capacitors, condensers, electromechanical controls, galvanometers, hygrometers, luminescent display panels, pressure gauges, pyrometers, thermostats, volt meters, and water meters; installations and apparatus for lighting, namely, ammeters, circuit breakers, electrical cables, electrical conductors, electricity conduits, electrical controllers, dimmers, light switches, fuses, motion sensitive switches, and electrical wires; non-metallic wall plugs in the nature of receptacles inserted into walls during construction for joinder or retention of electrical or other components ]SECTION 8 - CANCELLED—
011[ Installations and apparatus for lighting, namely, candelabras, chandeliers, fluorescent lighting tubes, lamps, electric lighting fixtures, electric track lighting units, electric night light, searchlights, and sun lamps; apparatus for heating, namely, air filters; barometric dampeners, heaters and pumps sold in combination for use in swimming pools and hot tubs; gas and electric fireplace inserts, comprised of andirons, artificial logs and artificial embers; fireplaces, furnace boilers, furnaces; fireplace inserts, namely, heat exchangers; portable electric heaters, solar heating panels, heat registers, and wood burning stoves; ventilating apparatus, namely, ventilating fans for commercial and industrial use; ventilating louvers, and ventilator hoods for ovens; air conditioning units, water purification units and water pumps; light bulbs and light fittings ]SECTION 8 - CANCELLED—
017[ Adhesive tape and sealants for industrial or commercial uses; extruded plastics in the form of rods, bars, sheets, and shaped sections for use in manufacturing; plastic pipes for plumbing, plastic tubes for plumbing; plastic hoses and fittings, namely, dishwater discharge hoses and washing machine hoses, rubber gasket material in sheets for plumbing; insulating materials, namely, sheets of plastic used as insulating infiltration barriers in construction and mastics, namely, plastic in the form of sheets for manufacturing; materials for packing, namely, adhesive packing tape for commercial or industrial use, cellulose acetate film used as an industrial or commercial wrapping materials, packing padding of plastic for shipping containers, strapping tape, and plastic stuffing for cartons and boxes ]SECTION 8 - CANCELLED—
019[ Glass for building purposes; non-metallic building materials, namely, wood and concrete beams, bricks, cement mixes, felt roof coverings, gravel, hardboard, joints for floors and walls, joists, laminated beams, lumber, mortars, particle board, plaster, plywood, roofing cement, tarred and asphalted roofing paper, roofing sealants, shingles, shutters, siding, skylights, stucco, studs, trusses; non-metallic articles for use in building, namely, bifolds, wooden window casements, ceramic tiles, door frames, doors, fencing gates and panels; fireplace mantels, garage doors, gutter pipes, millwork, patio doors, pavers, sliding doors, stained glass windows, screen doors, tiles, window screens; non-metallic articles for use in building repair and building decoration and in civil engineering construction, namely, asphalt, concrete blocks, ceiling panels, column posts and railings; concrete beams, fiberboard, flashing, granite, molding, paneling, plywood, roofing panels, shutters, trusses, vinyl flooring; non-metallic pipes for water supply, drainage, rainwater and sanitary purposes ]SECTION 8 - CANCELLED—
020[ Furniture and parts and fittings therefor namely, partitions and moldings for furniture ]SECTION 8 - CANCELLED—
021[ Brushes for cleaning plumbing fittings and pipes for the application of plumbing sealants; wire brushes ]SECTION 8 - CANCELLED—
035Retail and wholesale store services and retail and wholesale online store services featuring [ plumbing supplies, heating supplies, refrigeration supplies, ventilation supplies, air conditioning supplies, ] electrical supplies, water supplies, pipeline supplies, controls apparatus, building supplies [, timber supplies, bathroom, bedroom and kitchen furniture, home improvement, catering supplies, household electrical goods ]ACTIVE—
037[ Rental of machines, namely, machine tools and of parts and fittings therefor; all for use in construction, renovation, decoration and repair of buildings, rental of construction apparatus and of scaffolding for use in construction; plumbing and heating services ]SECTION 8 - CANCELLED—
039[ Storage and transportation of building materials, plumbing, electrical, heating, ventilation, and air conditioning products; tools, water distribution, liquid and gas pipe, valves and fitting products and materials, for the construction, plumbing, electrical, refrigeration and HVAC industries, and companies that supply and produce energy ]SECTION 8 - CANCELLED—
040[ Woodworking and cutting, shaping and planing of wood; custom glass cutting services ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 6, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Feb 22, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 22, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 7, 2017NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Feb 7, 2017RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 7, 201789AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 7, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 5, 2016E89RTEAS SECTION 8 & 9 RECEIVED—
Jun 6, 2015REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jan 4, 2013NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jan 4, 2013C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jan 4, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 5, 2012815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Dec 5, 2012E815TEAS SECTION 8 & 15 RECEIVED—
Oct 25, 2010ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 25, 2010REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 6, 2006R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 26, 2006DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Apr 25, 2006IUCNNOTICE OF ALLOWANCE CANCELLED—
Apr 25, 2006FAXXFAX RECEIVED—
Mar 28, 2006NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 3, 2006PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 14, 2005NPUBNOTICE OF PUBLICATION—
Nov 21, 2005PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 27, 2005CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 16, 2005TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 27, 2005ALIEASSIGNED TO LIE—
Apr 22, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 22, 2004TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 19, 2004CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 1, 2004ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Feb 2, 2004CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 9, 2003CFITCASE FILE IN TICRS—
Nov 25, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 25, 2003TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 26, 2003CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 29, 2003ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 29, 2003CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 23, 2003CNEAEXAMINERS AMENDMENT MAILED—
Mar 20, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 20, 2003MAILPAPER RECEIVED—
Sep 17, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 17, 2002CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 29, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 29, 2002MAILPAPER RECEIVED—
May 31, 2002CNSLLETTER OF SUSPENSION MAILED—
Mar 14, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 14, 2002MAILPAPER RECEIVED—
Sep 13, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 24, 2001DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance