USPTO serial 76310197
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
JOSEPH D. EVANS
BREWSTER TAYLOR STITES & HARBISON, PLLC1199 NORTH FAIRFAX STREETSUITE 900ALEXANDRIA, VA 22314-1437| Class | Description | Status | First use |
|---|---|---|---|
| 001 | FULL LINE OF PROTECTIVE AND INERT GASES, TREATMENT AND REACTION GASES, WELDING, CUTTING, BURNING AND HEATING GASES, TEST AND ELECTRONIC GASES, GASES FOR THE PURIFICATION AND TREATMENT OF WATER FOR THE FOOD INDUSTRY AND FOR METAL PRODUCTION AND METALLURGICAL PURPOSES, NAMELY, NITROGEN, OXYGEN, CARBON DIOXIDE, HYDROGEN, HYDROCARBON GASES, HYDROCARBON COMPOUNDS, NITRIC OXIDES, AMMONIA, OZONE, HALOGENS, HALOGEN COMPOUNDS, BORON COMPOUNDS, SILICON COMPOUNDS, SULFUR COMPOUNDS, AND RARE GASES | SECTION 8 - CANCELLED | — |
| 011 | INSTALLATIONS AND DEVICES FOR HEATING, STEAM GENERATING, REFRIGERATING, DRYING, AND VENTILATING, NAMELY, APPARATUS FOR THE LIQUEFACTION AND SEPARATION OF AIR, APPARATUS FOR THE SEPARATION, PURIFICATION, SCRUBBING, LIQUEFACTION AND REEVAPORATION OF TECHNICAL GASES, MINERAL OIL FRACTIONS, REFINERY GASSES AND NATURAL GAS, APPARATUS FOR CRACKING LIQUID AND GASEOUS HYDROCARBON MIXTURES, APPARATUS FOR THE PRODUCTION OF SYNTHESIS GASES AND SYNTHETIC NATURAL GAS, APPARATUS FOR THE LIQUEFACTION AND GASIFICATION OF COAL, REACTORS FOR CHEMICAL TRANSFORMATIONS FOR THE PRODUCTION OF BASIC COMPOUNDS IN THE CHEMICAL INDUSTRY, NAMELY, OLEFINS, BENZOL, NAPHTHALENE, ALCOHOLS, AMMONIA, UREA, ORGANICACIDS; WATER PURIFICATION AND SEWAGE DISPOSAL PLANTS; CHEMICAL AND PETROCHEMICAL PLANTS, NAMELY, PLANTS FOR THE PRODUCTION OF BASIC COMPOUNDS IN THE CHEMICAL INDUSTRY, NAMELY, HYDROGEN PLANTS, GAS TREATMENT PLANTS, NATURAL GAS PLANTS, PHARMACEUTICAL PLANTS, ENVIRONMENTAL ENGINEERING PLANTS, THERMAL PROCESS WASTE AIR CLEANING PLANTS; PETROCHEMICAL PROCESS AND REFINERY FURNACES; CRYOGENIC PLANTS, NAMELY, APPARATUS FOR THE PRODUCTION, APPLICATION, AND MAINTENANCE OF CRYOGENIC TEMPERATURES, NAMELY, HELIUM LIQUEFIERS; APPARATUS FOR THE PREPARATION AND MAINTENANCE OF VERY LOW TEMPERATURES, CRYOSTATS; EVAPORATORS, CONDENSORS,DISTILLATION AND RECTIFICATION APPARATUS, HEAT EXCHANGERS, REGENERATORS, COOLERS, SEPARATORS, ADSORBERS, SCRUBBING COLUMNS, AND BOILERS FOR USE IN THE ABOVE-MENTIONED APPARATUS AND PLANTS; HEATPUMPS, COOLING/REFRIGERATING INSTALLATIONS, AIR CONDITIONING APPARATUS FOR MAINTAINING COOL OR COLD TEMPERATURES IN ROOMS OR OTHER VOLUMES; REFRIGERATING AND FREEZING DEVICES FOR USE IN HOUSEHOLD AND INDUSTRY, NAMELY, UNITS FOR USE IN STORES AND SELF SERVICES SHOPS; NON- REFRIGERATED SHOP EQUIPMENT, NAMELY, LIGHTING DEVICES,AIR CONDITIONING APPARATUS; GAS INJECTORS; PRESSURE REDUCERS, REGULATORS, AND VALVES OF METAL FOR USE IN GAS SUPPLY SYSTEMS; AND WASTE HEAT-DRIVEN POWER INSTALLATIONS AND STATIONS CONSISTING OF HEAT TRANSFOFORMERS AND GENERATORS | SECTION 8 - CANCELLED | — |
| 012 | MATERIAL HANDLING VEHICLES AND SMALL LOAD TRANSPORTERS, INDUSTRIAL TRUCKS, NAMELY, TRACTORS, SMALL TOWING TRUCKS AND PLATFORM TRUCKS AND PLATFORM TRUCKS IN THE NATURE OF SMALL TRANSPORT VEHICLES WITH AND WITHOUT LOAD AREA, FORK-LIFT TRUCKS, FRONT END LIFTING LOADERS, HAND LIFT TRUCKS, HIGH/MEDIUM/LOW LEVEL LIFT TRUCKS, ORDER PICKERS, FREIGHT CONTAINER HANDLERS, REACH TRUCKS, VERY NARROW AISLE TRUCKS, PALLET TRUCKS AND STACKERS, AUTOMATED GUIDED VEHICLES, EXPLOSION-PROOF INDUSTRIAL TRUCKS; HYDRAULIC AND MECHANIC AUTOMOTIVE TRANSMISSIONS; HYDRAULIC PISTON MACHINES, HYDRAULIC PUMPS, DRIVES AND GEARS FOR VEHICLES | SECTION 8 - CANCELLED | — |
| 039 | PUBLIC UTILITY SERVICES IN THE NATURE OF NATURAL GAS DISTRIBUTION | SECTION 8 - CANCELLED | — |
| 040 | WASTE WATER PURIFICATION SERVICES; WATER TREATMENT SERVICES | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 22, 2010 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| May 16, 2008 | CFIT | CASE FILE IN TICRS | — |
| Jan 3, 2008 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 3, 2008 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Oct 14, 2003 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 22, 2003 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 2, 2003 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 12, 2003 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 26, 2003 | PAPER RECEIVED | — | |
| Feb 5, 2003 | 1.BD | Sec. 1(B) CLAIM DELETED | — |
| Feb 5, 2003 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 5, 2003 | PAPER RECEIVED | — | |
| Jan 15, 2003 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Jul 25, 2002 | CNSL | LETTER OF SUSPENSION MAILED | — |
| May 29, 2002 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 30, 2001 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 14, 2001 | DOCK | ASSIGNED TO EXAMINER | — |