Drawing for KNURR

USPTO serial 76331599

KNURR

Reviewed by CopyMark Law Group

Reg. 2975039Status 800Registered
Filing date
Status date
Registration date
Jul 26, 2005
Examiner
PAPPAS, MATTHEW
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with KNURR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lisa M. DuRoss

Lisa M. DuRoss Harness, Dickey & Pierce, P.L.C.5445 Corporate Drive, Suite 200Troy, MI 48072United States

Goods and services

ClassDescriptionStatusFirst use
006[ Empty tool cases made primarily of metal ]SECTION 8 - CANCELLED—
009Electric and electronic apparatus and tools, namely, solder and desolder irons, computer chip solders, heat-plates for computers, heat blow devices, namely internal cooling fans and cooling units for computers, pin forceps being tools specifically adapted for use on computers, socket-strips and plug strips; Electronic data processing tools, namely, electronic drivers, computers; Computer hardware, namely, communication servers; Computer monitors; Computer keyboards and computer peripherals; Electrical power strips, electrical connectors and power rails; Electrical cables and power lines; Electric power-supply units, computer bus lines, computer bus connectors, computer bus systems comprising cable connection chassis and parts thereof, flat belt cables and backplanes; Electric power packs; Electronic testing equipment and measuring equipment, namely, power supply multimeters, frequency counters, electronic frequency generators, function generators, digital multimeters, circuit breakers, voltmeters and ammeters; Isolating and regulating electrical transformers; Speed adjusting and speed variation monitors and controllers; Laboratory furniture specifically adapted for use in laboratories, namely, movable laboratory tables, worktables, workbenches, rest tables, desks, table mountings, table plates, under-table storage racks, chairs, wall partitions, drawers, storage cases, 19-inch storage cases, tabletop storage cases, storage racks, 19-inch storage racks, tool racks as part of laboratory furniture, climatic laboratory storage racks, laboratory furniture frames; Computer chassis; Power supplies; Distribution chassis, modular chassis, case chassis, case frames, case plates, case slides, telescopic slides, blanking plates, slide-in units, small cases and front panel elements, all being structural parts for electronic installations; Mounting chassis serving as mounting planes for use in the manufacture of semiconductor components; Apparatus for the electrostatic grounding of workers who assemble electronic parts and devices, namely anti-static safety tables, anti-static safety floor mats, and protective wrist straps and connecting lines for grounding; Air conditioner power supply units comprising cable connectors, chassis and parts thereof; Combined radiometer, revolution counter and electronic speed controller for cooling fansACTIVE—
011Heat exchangers; Lamps including table lamps; Cooling fans for ventilation of 19-inch storage cases and 19-inch storage racksACTIVE—
020Furniture, namely wall units, chairs, desks, tables, workbenches, worktables; Computer modular workstation furniture comprising non-metal storage cases, non-metal 19-inch storage cases, tabletop storage cases, storage racks, 19-inch storage racks, non-metal tool racks as components of computer modular workstation furniture, climatic storage racks, frames, industrial work tables, free-standing non-metal tool racks, wall-mounted non-metal tool racks, furniture frames; Workplace furnishings, namely non-safety anti-static tables and worktables, non-metal table mounting plates, under table storage racks, modular wall partitions, superstructures and structural racksACTIVE—
040Manufacture of office, laboratory and electronic storage furniture and modular components therefor to the order and specification of othersACTIVE—
042Product development and product development consultation services for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 9, 2026NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Apr 9, 2026RNL2REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Apr 9, 202689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Mar 16, 2026EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Sep 16, 2025PUM1OFFICE ACTION ISSUED POU1—
Sep 16, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 21, 2025E89RTEAS SECTION 8 & 9 RECEIVED—
Mar 19, 2025ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jul 26, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jan 12, 2022ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 31, 2018ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jul 14, 2015NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jul 14, 2015RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jul 14, 201589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jul 13, 2015E89RTEAS SECTION 8 & 9 RECEIVED—
Jun 24, 2015ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jun 18, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 18, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 23, 2011C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Mar 22, 2011APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 15, 2011815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Mar 15, 2011E815TEAS SECTION 8 & 15 RECEIVED—
Jul 26, 2005R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 13, 2005DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Dec 16, 2004IUCNNOTICE OF ALLOWANCE CANCELLED—
Dec 16, 2004MAILPAPER RECEIVED—
Jul 27, 2004NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 4, 2004PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 14, 2004NPUBNOTICE OF PUBLICATION—
Feb 9, 2004MAILPAPER RECEIVED—
Dec 30, 2003CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 11, 2003CNEAEXAMINERS AMENDMENT MAILED—
Dec 5, 2003ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Nov 26, 2003CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 26, 2003CFITCASE FILE IN TICRS—
Sep 3, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 3, 2003MAILPAPER RECEIVED—
Aug 4, 2003CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 27, 2003CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 26, 2003MAILPAPER RECEIVED—
Jan 3, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 3, 2003MAILPAPER RECEIVED—
Nov 6, 2002CNSLLETTER OF SUSPENSION MAILED—
Oct 3, 2002DOCKASSIGNED TO EXAMINER—
Jul 31, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 31, 2002MAILPAPER RECEIVED—
Jan 31, 2002CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 22, 2002DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance