Drawing for CEMEX BUILDING THE FUTURE

USPTO serial 76339747

CEMEX BUILDING THE FUTURE

Reviewed by CopyMark Law Group

Reg. 3190384Status 710
Filing date
Status date
Registration date
Jan 2, 2007
Examiner
HWANG, JOHN C B
Law office
—

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with CEMEX BUILDING THE FUTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Martin W. Schiffmiller

Martin W. Schiffmiller Kirschstein Israel Schiffmiller & Pieroni, P.C.425 Fifth Avenue, 5th FloorNEW YORK, NY 10016-2223UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001[ chemical sealers and additives for use in the cement, concrete, construction, and related industries ]SECTION 8 - CANCELLED—
002[ Paints for protective or decorative coating or tinting, in the nature of a coating ]SECTION 8 - CANCELLED—
006[ Metal construction materials in the nature of reinforcing rods, wire mesh, corner dowels, foundation chairs, bar ties, tie wire, anchors, straps, fasteners, expansion joint and fillers, cavity caps, scaffolding, shutters, grillwork, windows, doors, construction elements made of metal in the nature of supports, pillars, wall panels, metal containers, namely, silos and storage tanks for cement and concrete ]SECTION 8 - CANCELLED—
019[ Non-metallic construction materials, namely, mineral-based cementitious materials in the nature of portland, hydraulic, white, masonry, plastic, stucco, and oil well cement, other mineral-based cementitious materials and pozzolanic materials in the nature of blast furnace slag, coal clinker and fly ash; cement mixes and patches, concrete, mortar, stone, aggregate, sand, mosaic, tiles, lime, plaster, gypsum, gravel, brick, roofing tiles, floor tiles, masonry units, segmental retaining wall systems, asphalt, felt paper, plastic membranes, building materials made from concrete, namely, pre-cast concrete building products in the nature of blocks, pavers, beams, partitions, barriers, pipes, modules, panels, columns and monuments ]SECTION 8 - CANCELLED—
035Market research, product demonstration, direct mail advertising, promoting the goods and services of others by distributing printed advertising materials and providing advertising space on Internet web pages, identifying for others how to develop business and management opportunities and prospective clients, all for corporations in, serving, or related to the construction industry; marketing and supply chain services of all kinds of materials including promoting the purchase and sale of goods of others principally by means of a business to business e-commerce platform all unlimited as to any particular industrySECTION 8 - CANCELLED—
036Providing financial transactions in the nature of qualification of funds, placement of financial instruments, granting of credits insurance, e-payment, invoicing, payment processing, cash management including protocols for capturing early payment discounts; and financing services in the fields of business-to-business e-commerce, the construction industry, do-it-yourself construction, and related industriesSECTION 8 - CANCELLED—
037Construction and repair of buildings; paving of roads and sidewalks; rental of construction equipment in the nature of cement tools, concrete tools including mixers, pumps, mobile stationary batch plants; and consultation services for all the foregoingSECTION 8 - CANCELLED—
039Transportation and delivery of construction materials by truck, boat, rail, and air; loading and unloading of freight for others in the fields of construction and related industriesSECTION 8 - CANCELLED—
040Processing of materials in the cement and concrete and related industries to the specification of othersSECTION 8 - CANCELLED—
041Education and training in the fields of construction and community services through the organization and administration of clubs, meetings, conferences, professional forums, symposia, lectures, conventions, courses, operation of-programs by any communications medium and exhibitions including through correspondence courses via the global computer network and other mass mediaSECTION 8 - CANCELLED—
042Computer consultation; consulting services in the field of use of computer hardware and software systems for others; industrial property consultation; research and development for others in the fields of computers and data processing; licensing of intellectual property; computer programming for others; developing, updating and leasing of computer software; consulting services in the fields of construction, engineering, and architecture; consulting on the use of construction materials and construction designsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 4, 2017CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Jan 2, 2016REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 22, 2013NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Jul 22, 20138.PRREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED—
Jul 22, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 2, 20138.AFREGISTERED - SEC. 8 (6-YR) FILED—
Jul 2, 2013ES8RTEAS SECTION 8 RECEIVED—
Dec 3, 2008ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jan 2, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 17, 2006PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 27, 2006NPUBNOTICE OF PUBLICATION—
Aug 31, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 25, 2006ALIEASSIGNED TO LIE—
Aug 23, 2006CNEAEXAMINERS AMENDMENT MAILED—
Aug 22, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 22, 2006XAECEXAMINER'S AMENDMENT ENTERED—
Aug 22, 2006CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 22, 2006ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Aug 21, 2006PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jul 18, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 10, 2006ALIEASSIGNED TO LIE—
Jun 29, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 29, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 31, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 31, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 8, 2006CNSIINQUIRY AS TO SUSPENSION MAILED—
Mar 7, 2006CNSISUSPENSION INQUIRY WRITTEN—
Mar 6, 2006RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Aug 11, 2005RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jan 28, 2005CNSLLETTER OF SUSPENSION MAILED—
Jan 27, 2005CNSLSUSPENSION LETTER WRITTEN—
Jan 27, 2005TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 18, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 18, 2005TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 26, 2004CNSIINQUIRY AS TO SUSPENSION MAILED—
Jan 21, 2004CNSLLETTER OF SUSPENSION MAILED—
Jan 5, 2004CFITCASE FILE IN TICRS—
Dec 15, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 15, 2003MAILPAPER RECEIVED—
Jun 11, 2003GNSIINQUIRY TO SUSPENSION E-MAILED—
Dec 18, 2002CNSLLETTER OF SUSPENSION MAILED—
Oct 9, 2002DOCKASSIGNED TO EXAMINER—
Sep 27, 20021.BDSec. 1(B) CLAIM DELETED—
Sep 27, 2002CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 27, 2002MAILPAPER RECEIVED—
Mar 25, 2002CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 2002DOCKASSIGNED TO EXAMINER—
Jan 31, 2002DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance