Drawing for STEAG THE POWER COMPANY

USPTO serial 76478168

STEAG THE POWER COMPANY

Reviewed by CopyMark Law Group

Reg. 3025015Status 710
Filing date
Status date
Registration date
Dec 13, 2005
Examiner
LEHKER, DAWN FELDMAN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with STEAG THE POWER COMPANY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert W. Becker

ROBERT W BECKER ROBERT W. BECKER & ASSOCIATES707 HWY 66 E STE BTIJERAS, NM 87059UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Business management; business management consultation in the fields of energy technology, energy supply for energy supply companies and for energy, electricity and process heat consuming companies; business and industrial administration management of power plants; industrial administration consulting for power plant disposal and residual disposal in waste incineration plants; preparation of technical and business management certificatesSECTION 8 - CANCELLED—
036Insurance underwriting for energy companies; financial analysis and consultation for energy companiesSECTION 8 - CANCELLED—
037Industrial plant construction in the field of energy supply, environmental technology, clean room technology, air conditioning, energy and heat engineering; installation, assembly, maintenance and repair of machines, industrial buildings, energy supply plants, control measuring, and electro-technical units and industrial plants for energy, power, long distance energy, and compressed air production and supply, air conditioning and ventilation; building demolition, building sealing services; collection of trash, industrial and commercial specialized trash, from solid, muddy and liquid metallic and metal-containing industrial residue; shutdown and disposal of nuclear plants; hazardous waste management in the nature of clean-up of abandoned nuclear sites and flue gas cleaning; construction planningSECTION 8 - CANCELLED—
038Telecommunications consulting services for the specific needs of energy supply companiesSECTION 8 - CANCELLED—
039Distribution of energy, electricity, gas, heating, long-distance energy, pressurized air and water; transmission of gases, liquid and solid material via pipelinesSECTION 8 - CANCELLED—
040Recycling of residuals from fossil-fired power plants; incineration of residuals from fossil-fired power plantsSECTION 8 - CANCELLED—
041Training services in the field of power plant operation, waste incineration and water processingSECTION 8 - CANCELLED—
042Engineering services; architectural design services; chemist services; physicist services; technical consultation in the field of energy production and waste disposal; material testing; performing chemical and physical analysis of waste and residuals of waste-incineration facilities, power plants and/or water treatment facilities; assisting energy companies in establishing programs for data processing for energy technology and energy supply companies; technical consulting for power plant waste disposal and residual disposal in waste-incineration facilitiesSECTION 8 - CANCELLED—
045Security services, namely, monitoring of personnel, buildings and valuables; guard services for the protection of factories and personnelSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 21, 2012C8..CANCELLED SEC. 8 (6-YR)—
Nov 9, 2011ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 12, 2011ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Dec 13, 2005R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 20, 2005PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 31, 2005NPUBNOTICE OF PUBLICATION—
Aug 11, 2005PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 5, 2005ALIEASSIGNED TO LIE—
Aug 4, 2005CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 4, 2005CNEAEXAMINERS AMENDMENT MAILED—
Aug 4, 2005CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 20, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 8, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 8, 2005MAILPAPER RECEIVED—
Jan 6, 2005CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 6, 2005CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 5, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Dec 21, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 21, 2004MAILPAPER RECEIVED—
Jun 30, 2004CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 10, 2004REINREINSTATED—
Mar 9, 2004FAXXFAX RECEIVED—
Jan 26, 2004PETRPETITION TO REVIVE-RECEIVED—
Jan 26, 2004MAILPAPER RECEIVED—
Jan 23, 2004ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 19, 2003CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2003DOCKASSIGNED TO EXAMINER—
Jan 27, 2003AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Jan 27, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 27, 2003MAILPAPER RECEIVED—

Frequently asked questions

Related guidance