Drawing for ARGO-TECH

USPTO serial 76478258

ARGO-TECH

Reviewed by CopyMark Law Group

Reg. 3204814Status 710
Filing date
Status date
Registration date
Feb 6, 2007
Examiner
STRASER, RICHARD
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ARGO-TECH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Sandra M. Koenig

Timothy E. Nauman FAY SHARPE LLP1228 Euclid AvenueThe Halle Building, 5th FloorCleveland, OH 44115

Goods and services

ClassDescriptionStatusFirst use
007UNMETERED LUBE OIL AND SCAVENGE PUMPS FOR AEROSPACE AND INDUSTRIAL GAS TURBINE ENGINES; INDUSTRIAL PUMPING DEVICES FOR LAND-BASED GAS TURBINE POWER PLANTS, NAMELY, UNMETERED FUEL PUMPS, UNMETERED OIL PUMPS AND FUEL FLOW DIVIDERS; UNMETERED MAIN ENGINE FUEL PUMPS; UNMETERED BOOST AND TRANSFER AIRFRAME PUMPS; UNMETERED INDUSTRIAL PUMPS IN THE NATURE OF FLOW DIVIDERS AND UNMETERED LUBE AND SCAVENGE PUMPS; UNMETERED FUEL PUMPS FOR AIRPLANES; UNMETERED OIL PUMPS; VALVES FOR UNMETERED PUMPS AND FUEL METERS; CENTRIFUGAL PUMPS, FUEL CONTROL VALVES FOR AIRPLANES AND STRUCTURAL PARTS THEREFOR; GROUND REFUELING EQUIPMENT, NAMELY, UNMETERED PUMPS, HYDRANT PIT VALVES, UNISEX COUPLINGS AND HYDRANT COUPLERS; FITTINGS AND STRUCTURAL PARTS THEREFOR FOR BOTH COMMERCIAL AND MILITARY AIRCRAFT AND OFF ROAD VEHICLES AND EQUIPMENT; FUEL AND AIR REGULATORS FOR PRESSURE AND FLOW; UNMETERED REFUELING PUMPS FOR AIRPLANES; MOTOR OPERATED VALVES; FLOAT VALVES; LEVEL CONTROL VALVES; UNMETERED AERIAL REFUELING PUMPS, VALVES AND COUPLINGS; SUBMERGED MOTOR PUMPS AND STRUCTURAL PARTS THEREFOR FOR INDUSTRIAL MARINE APPLICATIONS; UNMETERED FUEL AND OIL PUMPS; FUEL TANKS FOR REFUELING RACE CARS; UNMETERED PUMPS FOR HANDLING VARIOUS CRYOGENIC TEMPERATURE FLUIDSSECTION 8 - CANCELLED—
009GROUND REFUELING EQUIPMENT, NAMELY, POSITIVE DISPLACEMENT METERS; FLUID PRESSURE REGULATORS; AND METERED FUEL FLOW DIVIDERSSECTION 8 - CANCELLED—
017NON-METALLIC HOSE FOR REFUELING SYSTEMS, PETROLEUM TRANSFER SYSTEMS AND RAPID DEPLOYMENT FUEL AND WATER SYSTEMS; NON-METALLIC HOSE FOR THE TRANSFER OF FUEL AND CRUDE OIL; NOZZLES; COUPLINGS; NON-METAL HOSES AND FITTINGS FOR USE IN COMMERCIAL, MILITARY, MARINE, INDUSTRIAL AND CUSTOM APPLICATIONS; COMMERCIAL NON-METAL HOSE; AND NON-METALLIC HOSE FOR THE TRANSFER OF VARIOUS INDUSTRIAL LIQUIDSSECTION 8 - CANCELLED—
037MAINTENANCE AND REPAIR OF ENGINESSECTION 8 - CANCELLED—
040PLATING AND SURFACE TREATMENT; CRYOGENIC PROCESSING OF MATERIALS; MANUFACTURING OF JET ENGINE MAIN FUEL PUMPS, CENTRIFUGAL PUMPS, FUEL CONTROL VALVES AND FLUID CONTROL COMPONENTS, AND PUMPS FOR HANDLING CRYOGENIC TEMPERATURE FLUIDS; MANUFACTURING FOR OTHERS JET ENGINE MAIN FUEL PUMPS, BOOST AND TRANSFER AIRFRAME PUMPS, INDUSTRIAL PUMPS IN THE NATURE OF FLOW DIVIDERS AND LUBE AND SCAVENGE PUMPS, CENTRIFUGAL PUMPS, FUEL CONTROL VALVES AND FLUID CONTROL COMPONENTS, GROUND REFUELING EQUIPMENT AND PUMPS FOR HANDLING CRYOGENIC TEMPERATURE FLUIDSSECTION 8 - CANCELLED—
042MATERIAL TESTING AND ANALYSIS; DESIGN AND DEVELOPMENT OF JET ENGINE MAIN FUEL PUMPS, BOOST AND TRANSFER AIRFRAME PUMPS AND INDUSTRIAL PUMPS IN THE NATURE OF FLOW DIVIDERS AND LUBE AND SCAVENGE PUMPS; DESIGN OF CENTRIFUGAL PUMPS, FUEL CONTROL VALVES AND FLUID CONTROL COMPONENTS; DESIGN OF GROUND REFUELING EQUIPMENT AND DESIGN OF PUMPS FOR HANDLING CRYOGENIC TEMPERATURE FLUIDSSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 13, 2013C8..CANCELLED SEC. 8 (6-YR)—
Jul 24, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 6, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 21, 2006PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 1, 2006NPUBNOTICE OF PUBLICATION—
Oct 2, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 29, 2006ALIEASSIGNED TO LIE—
Sep 28, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 28, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 27, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 27, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 29, 2006CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 29, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 29, 2006ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 20, 2006PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 23, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 10, 2006ALIEASSIGNED TO LIE—
Feb 6, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 1, 2006DOCKASSIGNED TO EXAMINER—
Nov 29, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Oct 27, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 27, 2005MAILPAPER RECEIVED—
Jun 28, 2005CNCFACTION CONTINUING FINAL - COMPLETED—
Jun 8, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 8, 2005ALIEASSIGNED TO LIE—
May 25, 2005EXPIEX PARTE APPEAL-INSTITUTED—
May 25, 2005JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
May 20, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 20, 2005MAILPAPER RECEIVED—
Nov 17, 2004CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 16, 2004CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 9, 2004ACECAMENDMENT FROM APPLICANT ENTERED—
Oct 20, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 20, 2004MAILPAPER RECEIVED—
Apr 19, 2004CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 9, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 9, 2004MAILPAPER RECEIVED—
Jul 7, 2003CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 27, 2003DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance