USPTO serial 76534941
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
FAIRFAX, VA
FAIRFAX, VA
Fairfax, VA
Fairfax, VA
Fairfax, VA
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John B. Farmer
John B. Farmer Leading-Edge Law Group, PLC4905 Dickens RoadSuite 100Richmond, VA 23230| Class | Description | Status | First use |
|---|---|---|---|
| 035 | cost assessment services, namely, cost estimating in the field of construction; tree management consultation, namely analysis and planning for tree preservation | ACTIVE | Feb 5, 2003 |
| 037 | Real estate development; environmental services, namely real estate site analysis and selection, and building inspection in the course of construction; land development services, namely, planning and laying out of residential and/or commercial communities; construction project management; restoration in the field of streams; construction management and supervision | ACTIVE | Feb 5, 2003 |
| 040 | waste management consultation services in the fields of storm water impact, wastewater management, and water resource management | ACTIVE | Feb 5, 2003 |
| 042 | Real estate inspections, namely home and surrounding environment inspections; environmental land inspection and building inspection not in the course of construction, architectural design services, namely, architectural design for new construction and renovation and rehabilitation, architectural design for preservation of historic structures, design-build services, feasibility studies, pre-planning studies, planning, architectural programming, interior design and space planning, master planning; engineering services, namely, construction engineering, environmental engineering, civil engineering, municipal engineering, structural engineering, mechanical, electrical, and plumbing engineering, transportation engineering, building services engineering, rapid response architectural and engineering services after climatic, environmental, or other disasters; environmental services, namely inspections for land feasibility and use, reviewing standards and practices to ensure compliance with environmental zoning regulations, technical consultation and research in the field of environment and land use, featuring environment site assessment, zoning and regulatory impact analysis, feasibility and annexation studies, floodplain analysis, and research studies; Scientific and technical research and mapping services in the fields of storm water impact, wastewater management, and water resources management, hydrographic and flood modeling, noise studies, traffic studies, environmental impact assessments and preparation of environmental impact statements, wetlands delineation, mitigation, and permitting, floodplain mapping, urban planning, regulatory impact analysis, indoor air quality consulting, environmental compliance consulting, and demolition design, site and civil engineering services, disaster response analysis, hazard vulnerability assessment; land surveying; transportation facilities design, namely, architectural design and environmental analysis of transportation facilities; landscape architectural design; geospatial and mapping services, namely, computerized mapping of land, floodplain mapping, conversion of computerized geographic data, geographic information systems consulting; transportation information systems consulting; computer software development for others, namely, geographic information systems programming and application development, website design, and database design; information technology consulting; and data warehousing and integration of computer systems and networks | ACTIVE | Feb 5, 2003 |
| 045 | providing consultation and information in the field of emergency response for communities, namely disaster preparedness, response, recovery, and mitigation services | ACTIVE | Feb 5, 2003 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 23, 2025 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Oct 23, 2025 | RNL2 | REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Oct 23, 2025 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Oct 18, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 27, 2025 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Sep 6, 2024 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| May 23, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 23, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 23, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 23, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 23, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jan 22, 2021 | NOSU | NOTICE OF SUIT | — |
| Mar 28, 2018 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 23, 2015 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Sep 23, 2015 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Sep 23, 2015 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Sep 22, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 24, 2015 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Mar 20, 2013 | C.7C | NEW CERTIFICATE UNDER SECTION 7 - PROCESSED | — |
| Mar 20, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 27, 2013 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Jan 23, 2013 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Oct 22, 2010 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 21, 2010 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 14, 2010 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Sep 6, 2005 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 14, 2005 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 1, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| May 31, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| May 25, 2005 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 21, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 8, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 7, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 3, 2005 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 1, 2005 | ALIE | ASSIGNED TO LIE | — |
| Feb 23, 2005 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 22, 2005 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 22, 2005 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 10, 2005 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Feb 10, 2005 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 9, 2005 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 9, 2005 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 24, 2004 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 7, 2004 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jul 26, 2004 | EMRV | EMAIL RECEIVED | — |
| Jul 25, 2004 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 29, 2004 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 20, 2004 | DOCK | ASSIGNED TO EXAMINER | — |