Drawing for BWSC

USPTO serial 76535609

BWSC

Reviewed by CopyMark Law Group

Reg. 2969251Status 710
Filing date
Status date
Registration date
Jul 19, 2005
Examiner
GRIFFIN, JAMES
Law office
GENERIC WEB UPDATE

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with BWSC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kenneth M. Bush

Kenneth M. Bush BUSH INTELLECTUAL PROPERTY LAWPO BOX 381146BIRMINGHAM, AL 35238UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction planning in the areas of airports, railroads, traffic systems, water drainage systems, water treatment systems, distribution and storage systems, wastewater collection and treatment systems, industrial waste treatment systems, solid waste facilities, decontamination and decommissioning systems, hazardous and toxic waste management systems, brownfield reclamation and development, HVAC systems, plumbing and process piping systems, boiler systems, fire protection systems, energy management control systems, material handling systems, power distribution systems, lighting systems, fire alarm systems, communication wiring systems, instrumentation and process control systems, foundations, bridges, retaining structures, seismic designs, and special structures, municipal, commercial, institutional, industrial, educational, and residential buildings, sites and landscapes; and construction phase services, namely project representation during construction phase, third party reviews, construction progress inspections, plan reviews, physical plant analysis, and facilities evaluationSECTION 8 - CANCELLEDAug 31, 1997
042Civil engineering services, namely design of airports, railroads, traffic systems, and water drainage systems; environmental engineering services, namely design of water treatment systems, distribution and storage systems, wastewater collection and treatment systems, industrial waste treatment systems, solid waste facilities, decontamination and decommissioning systems, and hazardous and toxic waste management systems, environmental assessments, and brownfield reclamation and development; mechanical engineering services, namely design of HVAC systems, plumbing and process piping systems, boiler systems, fire protection systems, energy management control systems, and material handling systems; electrical engineering services, namely design of power distribution systems, lighting systems, fire alarm systems, communication wiring systems, and instrumentation and process control systems; structural engineering services, namely design of foundations, bridges, retaining structures, seismic designs, and special structures; geographical information system (GIS) services, namely design of airport management systems and brownfield reclamation; architectural services, namely design of municipal, commercial, institutional, industrial, educational, and residential buildings, facilities evaluations, and historic preservation; survey services, namely topographic, property line, construction, and GPS surveys, photogrammetric and mapping services, and aerial survey ground control; urban planning services, namely planning in the area of land use, zoning comprehensive and neighborhood plans, industrial development and transportation infrastructureSECTION 8 - CANCELLEDAug 31, 1997
044Landscape architectural services, namely landscape gardening design for sites and landscapes, recreation master plans and land developmentSECTION 8 - CANCELLEDAug 31, 1997

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 30, 2026CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Jul 19, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 28, 2015NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jul 28, 2015RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jul 28, 201589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jul 28, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 7, 2015E89RTEAS SECTION 8 & 9 RECEIVED—
Aug 22, 2011NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 22, 2011C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 22, 2011APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 12, 2011E815TEAS SECTION 8 & 15 RECEIVED—
Jul 19, 2005R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 26, 2005PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 6, 2005NPUBNOTICE OF PUBLICATION—
Feb 7, 2005PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 4, 2005ALIEASSIGNED TO LIE—
Feb 1, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Jan 28, 2005CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 28, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Jan 28, 2005REINREINSTATED—
Oct 26, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 26, 2004MAILPAPER RECEIVED—
Sep 8, 2004ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jul 30, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 11, 2004CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 3, 2004DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance