Drawing for THE INTELLIGENT USE OF WATER

USPTO serial 76537605

THE INTELLIGENT USE OF WATER

Reviewed by CopyMark Law Group

Reg. 3385846Status 800Registered
Filing date
Status date
Registration date
Feb 19, 2008
Examiner
HARDY LUDLOW, TARAH KIM
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with THE INTELLIGENT USE OF WATER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alisa C. Simmons

Alisa C. Simmons FITCH, EVEN, TABIN & FLANNERY LLP120 SOUTH LASALLE STREETSUITE 2100CHICAGO, IL 60603

Goods and services

ClassDescriptionStatusFirst use
006METAL MANUALLY OPERATED VALVES, NAMELY Y VALVES, SHUT-OFF VALVES, ANTI-SIPHON VALVES, AIR VENT VALVES, VACUUM RELIEF VALVES, PRESSURE REGULATING VALVES, QUICK COUPLING VALVES, DRAIN VALVES, ANGLE VALVES, GLOBE VALVES, BALL VALVES, GATE VALVES, AND CHECK VALVES; METAL HOSE HANGERS, AND METAL PIPESACTIVENov 2, 2007
008PIPE CUTTERS; DRIPPER INSTALLATION TOOLSACTIVENov 2, 2007
009AUTOMATIC CONTROLS FOR IRRIGATION SPRINKLERS AND SPRINKLER SYSTEMS, namely, MECHANICAL CONTROLLERS, ELECTROMECHANICAL CONTROLLERS, ELECTRICAL CONTROLLERS, COMPUTER CONTROLLERS, CLOCK TIMERS, WATER TIMERS, TEMPERATURE RESPONSIVE CONTROLLERS, MOISTURE RESPONSIVE CONTROLLERS; ELECTRIC SWITCHES; ELECTRIC SOLENOIDS, ELECTRIC RELAYS; ELECTRICAL CONNECTORS; ELECTRIC WIRE; WEATHER STATIONS, COMPRISING A RAIN GAUGE, SOLAR RADIATION SENSOR, WIND SPEED AND RELATIVE HUMIDITY SENSOR COMBINED AS A UNIT; FLUID METERS AND GAUGES, namely, WATER METERS, PILOT TUBES, PRESSURE GAUGES, AND RAIN GAUGES; SOLENOID AND ELECTRICALLY OPERATED REMOTE CONTROL VALVES; [ AUDIO RECORDINGS AND AUDIO VIDEO TAPE, namely, AUDIO CASSETTE TAPES AND VIDEO TAPES CONCERNING SPRINKLER SYSTEMS AND IRRIGATION; ] AND COMPUTERS AND COMPUTER PROGRAMS FOR IRRIGATION CONTROL; COMPUTERS; RADIO CONTROL TRANSCIEVERS; SURGE PROTECTORS; TRANSFORMERS; THERMOMETERSACTIVENov 2, 2007
011SPRINKLER SYSTEMS AND SPRINKLERS THEREFOR, NAMELY IMPACT AND IMPULSE DRIVE SPRINKLERS, POP-UP SPRINKLERS, BALL DRIVE SPRINKLERS, TURBINE DRIVE, REACTION DRIVE SPRINKLERS; OSCILLATORS; SPRAY HEADS; BUBBLERS; SPRINKLER NOZZLES; SPRINKLER SUPPORTS AND BASES; DRIPPERS; EMITTERS; SOAKERS; SPINNER SEPARATORS, SPRINKLER SYSTEM FILTERS AND FILTER SCREENS; AND FAUCET ADAPTERSACTIVENov 2, 2007
014[ WATCHES ]SECTION 8 - CANCELLEDNov 2, 2007
016MAINTENANCE AND OPERATIONAL MANUALS RELATED TO IRRIGATION EQUIPMENT AND SYSTEMS; INSTALLATION MANUALS RELATED TO IRRIGATION SPRINKLERS AND SPRINKLER SYSTEMS; IRRIGATION DESIGN MANUALS AND BOOKS; PAPER BANNERS; PAPER BOXES; BUMPER STICKERS; DECALS; PAPER SIGNS; POSTERS; PAPER FLAGS; PENSACTIVENov 2, 2007
017LAWN AND GARDEN EQUIPMENT COMPRISING NON-METALLIC HOSE, TUBING, PIPE, PIPE JOINT AND COUPLINGS, HOSE CONNECTORS, HOSE QUICK COUPLING CONNECTORS, HOSE REPAIR COUPLINGS, RISER PIPES, PIPE ADAPTERS; NON-METAL FITTINGS, NAMELY DRIP FITTINGS, BARB FITTINGS; NON-METAL COMPRESSION FITTINGS; RUBBER VALVE MARKERS; HOSE AND VALVE WASHERS OF RUBBER; NON-METAL SPRINKLER COLLARSACTIVENov 2, 2007
020CABINETS AND HOUSINGS FOR PLASTIC VALVES AND IRRIGATION CONTROLLERS; COUNTER STOOLS; STADIUM CUSHIONS; PLASTIC MANUALLY OPERATED VALVES, NAMELY Y VALVES, SHUTOFF VALVES, ANTI-SIPHON VALVES, AIR-VENT VALVES, VACUUM RELIEF VALVES, PRESSURE REGULATING VALVES, QUICK COUPLING VALVES, DRAIN VALVES, ANGLE VALVES, GLOBE VALVES, BALL VALVES, GATE VALVES, AND CHECK VALVES; PLASTIC HOSE HANGERS, AND PLASTIC SIGNSACTIVENov 2, 2007
021INSULATED CUPS; MUGS; LAWN SPRINKLER NOZZLES; HOSE END NOZZLES AND HOSE NOZZLESACTIVENov 2, 2007
025CLOTHING, NAMELY, [ JACKETS, SWEATSHIRTS, SHIRTS, T-SHIRTS, ] CAPSACTIVENov 2, 2007
028[ SPORTS EQUIPMENT, namely, GOLF BALLS ]SECTION 8 - CANCELLEDNov 2, 2007
037IRRIGATION SYSTEM INSTALLATION SERVICESACTIVENov 2, 2007

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 20, 2018NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Aug 20, 2018RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Aug 20, 201889AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Aug 18, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 8, 2018E89RTEAS SECTION 8 & 9 RECEIVED—
Feb 19, 2017REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Mar 7, 2014NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Mar 7, 2014C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Mar 7, 2014APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 19, 2014815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Feb 19, 2014E815TEAS SECTION 8 & 15 RECEIVED—
Sep 30, 2013CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 30, 2013COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
May 13, 2008COC.CORRECTION UNDER SECTION 7 - PROCESSED—
May 12, 2008PLGLASSIGNED TO PARALEGAL—
Mar 31, 2008AMD7SEC 7 REQUEST FILED—
Mar 31, 2008MAILPAPER RECEIVED—
Feb 19, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 16, 2008REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Jan 15, 2008ALIEASSIGNED TO LIE—
Dec 3, 2007CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Nov 30, 2007SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Nov 2, 2007IUAFUSE AMENDMENT FILED—
Nov 2, 2007EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Aug 8, 2007EX5GSOU EXTENSION 5 GRANTED—
May 2, 2007EXT5SOU EXTENSION 5 FILED—
May 2, 2007EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 15, 2006EX4GSOU EXTENSION 4 GRANTED—
Oct 30, 2006EXT4SOU EXTENSION 4 FILED—
Oct 30, 2006EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 13, 2006EX3GSOU EXTENSION 3 GRANTED—
May 1, 2006EXT3SOU EXTENSION 3 FILED—
May 1, 2006EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 10, 2005EX2GSOU EXTENSION 2 GRANTED—
Oct 27, 2005EXT2SOU EXTENSION 2 FILED—
Oct 27, 2005EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 12, 2005ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 12, 2005REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 18, 2005EX1GSOU EXTENSION 1 GRANTED—
Apr 29, 2005EXT1SOU EXTENSION 1 FILED—
Apr 29, 2005MAILPAPER RECEIVED—
Nov 2, 2004NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 10, 2004PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 21, 2004NPUBNOTICE OF PUBLICATION—
May 19, 2004CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 4, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 4, 2004MAILPAPER RECEIVED—
Feb 24, 2004CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2004DOCKASSIGNED TO EXAMINER—
Sep 25, 2003MAILPAPER RECEIVED—

Frequently asked questions

Related guidance