USPTO serial 76546692
DCG
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Feb 1, 2005
- Examiner
- EVANKO, PATRICIA MALESARDI
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with DCG?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Nara, JP
Nara, JP
Nara 639-1160, JP
NARA, JP
Nara, JP
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mainak H. Mehta
Mainak H. Mehta Procopio, Cory, Hargreaves & Savitch LLP525 B Street, Suite 2200San Diego, CA 92101United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Metalworking machines and machine tools, namely, vertical machining centers, horizontal machining centers, grinding centers, CNC drilling centers, lathes, CNC lathes, high-speed precision lathes, and turning centers; transfer apparatus, namely, loader, gantry loader, conveyor, cranes, and robots; chemical machines and apparatus, namely, filters for machines for use in industrial robots in connection with control and repair of metal working machines; machine elements, namely, ball screws, couplings and cams; machine tool holders, namely, clamps, spindle speeders and retention studs, collet wrenches and racks and user manual and guides sold as a unit | ACTIVE | — |
| 042 | [ Designing of metalworking machines, machine tools, loaders, gantry loaders, conveyors, cranes, robots, and parts thereof; designing of industrial facilities composed of metalworking machines, machine tools, loaders, gantry loaders, conveyors, cranes, and robots; providing technical information and advice regarding the performance and operation of metalworking machines, machine tools, loaders, gantry loaders, conveyors, cranes and robots; computer programming and maintenance of computer software for others; testing and research of metalworking machines, machine tools, loaders, gantry loaders, conveyors, cranes and robots; testing and research for the prevention of pollution, namely, reducing the discharge of industrial waste and noise from metalworking and machine tools; testing and research regarding the conservation of electrical power; repair of recorded computer software; and repair of recorded computer operating programs ] | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by MORI SEIKI CO., LTD.
- Other trademarks owned by MORI SEIKI CO., LTD.
- Other trademarks owned by MORI SEIKI CO., LTD.
- Other trademarks owned by DMG MORI SEIKI CO., LTD.
- Other trademarks owned by DMG MORI SEIKI CO., LTD.
- Other trademarks in Class 007
- Other trademarks in Class 042
- Similar marks named DCG
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 24, 2025 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Jun 24, 2025 | RNL2 | REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Jun 24, 2025 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Jun 18, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 13, 2025 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Feb 1, 2024 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Mar 25, 2015 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Mar 20, 2015 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Mar 20, 2015 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Mar 20, 2015 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Mar 18, 2015 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jan 26, 2011 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jan 25, 2011 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 6, 2011 | 815F | REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED | — |
| Jan 6, 2011 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Feb 1, 2005 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 9, 2004 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 20, 2004 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 15, 2004 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 15, 2004 | ALIE | ASSIGNED TO LIE | — |
| Sep 9, 2004 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 8, 2004 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Aug 26, 2004 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Aug 13, 2004 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 13, 2004 | PAPER RECEIVED | — | |
| Feb 12, 2004 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Feb 12, 2004 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 3, 2003 | PAPER RECEIVED | — |