USPTO serial 76592458
TMS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 20, 2010
- Examiner
- COLEMAN, NICHOLAS A
- Law office
- TMO LAW OFFICE 115
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with TMS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
TMS TRANSPORT- UND MONTAGESYSTEME GMBH
A-4031 LINZ, AT
Other trademarks owned by TMS TRANSPORT- UND MONTAGESYSTEME GMBH
TMS TRANSPORT- UND MONTAGESYSTEME GMBH
A-4031 LINZ, AT
Other trademarks owned by TMS TRANSPORT- UND MONTAGESYSTEME GMBH
TMS TRANSPORT- UND MONTAGESYSTEME GMBH
A-4031 LINZ, AT
Other trademarks owned by TMS TRANSPORT- UND MONTAGESYSTEME GMBH
4031, Linz, AT
TMS TURNKEY MANUFACTURING SOLUTIONS GMBH
LINZ, AT
Other trademarks owned by TMS TURNKEY MANUFACTURING SOLUTIONS GMBH
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Julie A. Greenberg
Julie A. Greenberg DINSMORE & SHOHL LLP900 Wilshire DriveSuite 300TROY, MI 48084Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and installations with and without industrial robots for producing land vehicles, water vehicles or aircraft and for producing vehicle bodies, namely, machines for body-in-white assembly, vehicle assembly machines, vehicle parts marriage machines, framing machines, screwing and joining machines, and parts thereof, namely, clamping frames and clamping frame structural parts; loading and unloading machines for clamping frames, clamping frame parts and vehicle body parts; welding and soldering installations and their parts, namely, laser welding machines, laser soldering machines, plasma welding machines, and plasma soldering machines and fixtures, namely, clamping fixture sand assembly fixtures in the nature of work holding fixtures; machine parts and parts thereof for transporting, feeding, holding and clamping vehicle parts and vehicle body parts for motor vehicles, namely, pallets, skids, clamping frames, clamping frame parts, supporting plates, clamps and centering tools; hydraulic, pneumatic and electric drives and fixtures being parts of machines, namely, clamping fixtures and assembly fixtures in the nature of work holding fixtures; installations for transporting land vehicles, water vehicles, aircraft, vehicle bodies and parts thereof, namely, skid conveyors, roller conveyors, pallet conveyors, pallet belts in the nature of conveyors, electric overhead conveyors and monorail conveyors; lifting installations for transporting land vehicles, water vehicles or aircraft, vehicle bodies and parts thereof, namely, electrically, hydraulically and pneumatically power-operated floor mounted lifters and electrically, hydraulically and pneumatically power-operated overhead conveyor lifters; filling machines for brake fluid, servo oil, motor-vehicle air conditioning refrigerant, fuel, windshield cleaning fluid, and motor-vehicle coolant | SECTION 8 - CANCELLED | — |
| 009 | Electrical controllers; electronic control systems for machines; switchgears, switch desks, switch groups, and switching stations all in the nature of switch boxes and switchboards; programmable electrical or electronic controllers and electrical or electronic robot controllers; data processing apparatus, namely, computer peripherals for data processing systems and for communication between data processing systems; computer programs for the control and monitoring of machines and installations for producing land vehicles, water vehicles or aircraft and vehicle bodies, transport vehicles and installations, robots and robot cells, welding installations and apparatus, and soldering installations and apparatus; computer programs for the planning, design and production of machines and installations for producing and transporting motor vehicles and vehicle bodies; welding and soldering devices, namely, laser and plasma welding and soldering devices and structural parts therefore; measuring systems, namely, laser measuring systems; computer programs for the simulation and programming of robots, robot cells, machines and installations for producing land vehicles, water vehicles or aircraft and vehicle bodies, and transport vehicles and installations; computer programs for offline robot programming; computer programs for the synchronization of robots and measuring devices; computer programs for the transmission of data from/to robots and/or measuring devices to/from data processing apparatus; computer programs for the planning of production sequences, in particular for sequence controls, system simulations and vehicle control of installations for producing and transporting land vehicles, water vehicles or aircraft and motor vehicle bodies, in particular installations in which several vehicles are moved; computer programs for the planning of maintenance intervals and sequences of machines and installations for producing and transporting land vehicles, water vehicles or aircraft; alarm monitoring systems for machines and installations for producing and transporting land vehicles, water vehicles or aircraft and motor vehicle bodies in the event of faulty production sequences or faulty sequences of motion; computer programs for the recording of quality data of machines and installations for producing and transporting land vehicles, water vehicles or aircraft and motor vehicle bodies; computer programs for the statistical evaluation of system-specific data, in particular usefulness, capacity utilization, stoppages and error frequency of machines and installations for producing and transporting land vehicles, water vehicles or aircraft and motor vehicle bodies; computer programs for the databank-assisted calculation, quotation, planning, visualization and design of production and transport installations for the automobile industry; testers for tightness verification on filled brake systems, namely, brake fluid pressure testers; dynamic vehicle test stands for testing anti-lock brake systems, brake systems and vehicle stability systems | SECTION 8 - CANCELLED | — |
| 012 | Vehicles for transporting land vehicles, water vehicles, aircraft, vehicle bodies and parts thereof, namely, assembly lift trucks, assembly trucks, automatic guided vehicles and electric overhead conveyor vehicles | SECTION 8 - CANCELLED | — |
| 020 | Storage racks for storing clamping frames, frame parts and vehicle body parts | SECTION 8 - CANCELLED | — |
| 035 | Production, transport and business data evaluation, namely, statistical data evaluations for business and commercial purposes in the field of the production and transport of land vehicles, water vehicles or aircraft, and parts thereof, and motor vehicle bodies | SECTION 8 - CANCELLED | — |
| 037 | Machinery installation and start-up, maintenance, and repair of machines and installations for producing land vehicles, water vehicles or aircraft and vehicle bodies, in particular work stations, screwing and joining stations, robot cells, welding stations, soldering stations; machinery installation and start-up, maintenance, and repair of machines and installations for transporting land vehicles, water vehicles or aircraft, vehicle bodies, and parts thereof, in particular automated ground and suspended transport installations and vehicles; machinery installation and start-up, maintenance, and repair of welding installations and apparatus, soldering installations and apparatus; installation and start-up, maintenance, and repair of machine sand installations for the simulation and programming of robots and robot cells, in particular for off-line robot programming; installation and start-up, maintenance, and repair of machine sand installations for the planning, operation, maintenance and data recording and evaluation of machines and installations for producing land vehicles, water vehicles or aircraft and vehicle bodies | SECTION 8 - CANCELLED | — |
| 042 | Engineering services consisting of technical consultation, simulation, design planning, technical project planning and implementation planning in the field of the production and transport of land vehicles, water vehicles or aircraft and vehicle bodies; engineering services consisting of technical consultation, simulation, design planning, technical project planning and implementation planning in the field of the erection of transport installations for land vehicles, water vehicles or aircraft, vehicle bodies, and parts thereof, in particular automated, ground and suspended transport installations; engineering services consisting of technical consultation, simulation, design planning, technical project planning and implementation planning in the field of the process sequence planning in the production and transport of land vehicles, water vehicles or aircraft and vehicle bodies; engineering services consisting of technical consultation, simulation, design planning, technical project planning and implementation planning in the field of welding installations and apparatus, and soldering installations and apparatus; engineering services consisting of technical consultation, simulation, design planning, technical project planning and implementation planning in the field of robot programming, in particular off line robot programming; preparation, maintenance and leasing of computer software | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by TMS TRANSPORT- UND MONTAGESYSTEME GMBH
- Other trademarks owned by TMS TRANSPORT- UND MONTAGESYSTEME GMBH
- Other trademarks owned by TMS TRANSPORT- UND MONTAGESYSTEME GMBH
- Other trademarks owned by TMS Produktionssysteme GmbH
- Other trademarks owned by TMS TURNKEY MANUFACTURING SOLUTIONS GMBH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 012
- Other trademarks in Class 020
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named TMS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 26, 2021 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Jul 20, 2019 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Feb 16, 2017 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Feb 16, 2017 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Feb 7, 2017 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Feb 2, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 22, 2016 | 815F | REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED | — |
| Nov 22, 2016 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 20, 2015 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jun 25, 2014 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jun 20, 2014 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 20, 2014 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 20, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 14, 2010 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Dec 16, 2009 | DMCC | DATA MODIFICATION COMPLETED | — |
| Dec 16, 2009 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 7, 2009 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Dec 7, 2009 | PAPER RECEIVED | — | |
| Jun 16, 2009 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 24, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 4, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Feb 19, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 19, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 18, 2009 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Feb 17, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 17, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 10, 2009 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Feb 10, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 30, 2009 | PAPER RECEIVED | — | |
| Aug 25, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 22, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 22, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 7, 2007 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Nov 7, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 23, 2007 | ALIE | ASSIGNED TO LIE | — |
| Jul 20, 2007 | PAPER RECEIVED | — | |
| Feb 20, 2007 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 19, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2007 | PAPER RECEIVED | — | |
| Aug 3, 2006 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Aug 2, 2006 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Aug 2, 2006 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jul 12, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 12, 2006 | PAPER RECEIVED | — | |
| Apr 19, 2006 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jan 17, 2006 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Jan 15, 2006 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jul 14, 2005 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Jul 13, 2005 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jul 13, 2005 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jul 13, 2005 | ALIE | ASSIGNED TO LIE | — |
| Jul 5, 2005 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 5, 2005 | PAPER RECEIVED | — | |
| Jan 4, 2005 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 3, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 15, 2004 | DOCK | ASSIGNED TO EXAMINER | — |
| May 28, 2004 | NWAP | NEW APPLICATION ENTERED | — |