Drawing for APACHE SERVICES, INC.

USPTO serial 76681410

APACHE SERVICES, INC.

Reviewed by CopyMark Law Group

Reg. 3621287Status 710
Filing date
Status date
Registration date
May 19, 2009
Examiner
SERVANCE, RENEE L
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with APACHE SERVICES, INC.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark R. Wisner

MARK R. WISNER Wisner & Associates1177 WEST LOOP S STE 400HOUSTON, TX 77027-9012UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction and repair of plants and industrial facilities used for oil and gas production, processing and manufacturing polymers and chemicals, oil refining and gas processing; Building construction services, namely, constructing buildings used for manufacturing, warehousing, distribution, retailing, industrial processing, applying protective coatings, treatment of concrete and concrete finishing; Repair of buildings used for manufacturing, warehousing, distribution, retailing, industrial processing, applying protective coatings, treatment of concrete and concrete finishing; Construction and repair of security enclosures and buildings, entertainment facilities, governmental and infrastructural buildings and facilities, office buildings, educational facilities, and laboratories; Consulting in the fields of construction, repair, maintenance and installation of buildings, oil and gas production plants and industrial facilities used for processing and manufacturing polymers and chemicals, oil refining, and gas processing; Consulting in the field of construction planning; Construction planning services; Technical consulting in the fields of maintenance and repair of oil and gas production plants, industrial facilities used for processing and manufacturing polymers, oil refining, and gas processing; Technical consulting in the fields of maintenance and repair of buildings and facilities used for manufacturing, warehousing, distribution, industrial processing, applying protective coatings, treatment of concrete and concrete finishing; Technical consulting in the fields construction, maintenance and repair of security enclosures and buildings, entertainment facilities, governmental and infrastructural buildings and facilities, office buildings, educational facilities, and laboratoriesSECTION 8 - CANCELLEDJun 1, 2007
042Technical consulting in the field of design of buildings, oil and gas production plants and industrial facilities used for processing and manufacturing polymers and chemicals, oil refining, and gas processing; Technical consulting in the field of design of security enclosures and buildings, entertainment facilities, governmental and infrastructural buildings and facilities, office buildings, educational facilities, and laboratories; Technical consulting in the field of computer-based information systems used in construction and repair of oil and gas production plants and industrial facilities used for processing and manufacturing polymers and chemicals, oil refining, gas processing; Technical consulting in the field of computer-based information systems used in maintenance and repair of buildings and facilities used for manufacturing, warehousing, distribution, industrial processing, applying protective coatings, treatment of concrete and concrete finishing; Technical consulting in the field of computer-based information systems used in security enclosures and buildings, entertainment facilities, governmental and infrastructural buildings and facilities, office buildings, educational facilities, and laboratoriesSECTION 8 - CANCELLEDJun 1, 2007

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 25, 2015C8..CANCELLED SEC. 8 (6-YR)—
May 19, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 3, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 11, 2009NPUBNOTICE OF PUBLICATION—
Jan 23, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 22, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 22, 2009CNEAEXAMINERS AMENDMENT MAILED—
Jan 21, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Jan 21, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 21, 2008CPRAPRIORITY ACTION MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jul 21, 2008CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jul 8, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jun 23, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 12, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 12, 2008ALIEASSIGNED TO LIE—
Jun 12, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 12, 2008CNEAEXAMINERS AMENDMENT MAILED—
Jun 11, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Jun 11, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 11, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Jun 11, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 21, 2007CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 20, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 8, 2007DOCKASSIGNED TO EXAMINER—
Sep 14, 2007MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 10, 2007NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance